Land West Of Barnhill Farm Cottages Guyzance Northumberland
Variation of condition 2 (approved plans) on approved application 21/04696/FUL in order to further construction of barn structures occupying Phase 2 of the development by the use of interlocking concrete panels on the lower walls of the barns rather than blockwork, repositioning of barn entrances, simplification of internal spaces within the smaller agricultural buildings, greywater collection from the northern roof of the barn, the provision of roof mounted Solar PV on the new barn structures and minor additions to the permeable hardstanding.
Crown Wood Gorse Road Orpington
Construction of a private way across land in agricultural/forestry use (felling and extraction of trees to facilitate works). (Application for Prior Approval Under Part 6 Class E of the Town and Country Planning (General Permitted Development)(England) Order 2015).
Sheepcote Farm Sheepcote Lane Orpington BR5 4ET
Construction of a private way across land in agricultural use. (Application for Prior Approval Under Part 6 Class A of the Town and Country Planning (General Permitted Development)(England) Order 2015).
Land At Marsh Green Farm Marsh Green EX5 2EU
Construction and operation of a ground mounted solar farm and associated landscaping and ecological habitat, with permission being required for 40 years, comprising solar arrays, equipment housing, sub-station, fencing, ancillary equipment and associated development; temporary change of use of land for construction compound (off site)
Land Adjacent 228 Burnley Road Bacup Lancashire
Lawful Development Certificate (Proposed): construction of polytunnel measuring 4.8m wide, 12.8m long and 2.4m high, to be used for agricultural purposes (growing crops).
HS2 Compounds Access From Waste Lane Balsall Common
Development authorised by the High Speed Rail (London-West Midlands) Act 2017 relating to submissions under Schedule 17 (6) for approvals of Lorry Routes (LR): Waste Lane Overbridge and Waste Lane East and West Road Head: Inbound Route: Construction traffic will use the A45 Coventry Rd SRN from the West before taking the A452 southbound at the Stonebridge roundabout. LGVs will continue on the A452 through Balsall Common before turning left onto Kelsey Lane / Waste Lane. Construction traffic will follow Waste Lane until they turn left into the site access for Waste Lane Overbridge and Waste Lane Road Head East and West. Outbound Route: Construction traffic will leave Waste Lane Overbridge and Waste Lane Road Head East and West and turn right out of the access onto Waste Lane, continuing onto Kelsey Lane before turning right onto the A452. LGVs will continue on the A452 until reaching the A45 Coventry Rd SRN. For Carol Green Rail Underbridge (South), Cromwell Lane and Beechwood Farm Accommodation Underpass the inbound and outbound routes to these sites (beyond the internal haul road) is the same as the route for Waste Lane Overbridge compound and the Roadhead location. (Re-submission of PL/2021/00471/HS2DIS)
Land Off Abbotstone Road Fobdown Hampshire
Change of use of land from agricultural to Class C3 (Dwellinghouse). Development comprising the reshaping of the reservoir to provide for the construction of a floating five-bedroom dwellinghouse,...
Waste Lane, Hodgetts Lane And Truggist Lane Berkswell Solihull
Development authorised by the High Speed Rail (London-West Midlands) Act 2017 relating to submissions under Schedule 17 (6) for approvals of Lorry Routes (LR): Waste Lane Overbridge Satellite Compound/Waste Lane East and West Road Head Inbound Route Construction traffic will use the A45 Coventry Rd SRN from the West before taking the A452 southbound at the Stonebridge roundabout. LGVs will continue on the A452 through Balsall Common before turning left onto Kelsey Lane/Waste Lane. Construction traffic will follow Waste Lane until they turn left into the site access for Waste Lane Overbridge and Waste Lane Road Head East and West. Outbound Route Construction traffic will leave Waste Lane Overbridge and Waste Lane Road Head East and West and turn right out of the access onto Waste Lane, continuing onto Kelsey Lane before turning right onto the A452. LGVs will continue on the A452 until reaching the A45 Coventry Rd SRN Carol Green Rail Underbridge North Satellite Compound Inbound Route Construction traffic will use the A45 Coventry Rd SRN from the West before taking the A452 southbound at the Stonebridge roundabout. LGVs will continue on the A452 through Balsall Common before turning left onto Kelsey Lane / Waste Lane. Continue on Waste Lane for approximately 1.3 miles and turn left onto Hodgetts Lane and then left onto Truggist Lane, the site entrance is on the left-hand side Outbound Route Construction traffic must turn right out of site as there is a low bridge to the left. Once LGVs have turned right onto Truggist lane they will follow the above route in reverse until they have re-joined the SRN. Carol Green Rail Underbridge South Satellite Compound/Cromwell Lane Satellite Compound/Beechwood Farm Accommodation Underpass The inbound and outbound routes to these sites (beyond the internal haul road) is the same as the route for Waste Lane Overbridge compound and the Roadhead location.
Chalk Farm Newmarket Road Bottisham CB25 9BD
Change of use of agricultural land to residential (C3) amenity land and construction of a hard surfaced tennis court and associated development