153 - 155 High Street Penge London SE20 7DS
Change of use of part of ground floor from shop to residential use (associated with reconfiguration to form refuse and cycle store) along with alterations to the shopfront, demolition of part of the first and second floors to form lightwell and conversion of first floor from offices and second/third floors from residential flats to HMO use and enlargement of third floor through construction of extension, with resultant overall first, second and third floor providing 26 bedroom House in Multiple Occupation.
Tolworth Tower Tolworth Broadway Kingston Upon Thames Tolworth KT6 7EL
Redevelopment of the site to create 492 new dwellings. Redevelopment and refurbishment of the Tolworth Tower complex comprising the change of use of the existing 3rd to 22nd floors in Tolworth Tower from office (Use Class E) to residential (Use Class C3), change of use of the existing 2nd floor from office (Use Class E) to ancillary amenity space (Use Class C3), change of use of part of the existing 1st floor car park to create a flexible workspace unit (Dual Use Class C3/E) and provision of 3 no. freestanding retail kiosks (Use Class E), with associated external façade alterations and internal refurbishment works. Demolition of the existing retail units fronting Tolworth Broadway and the construction of two new buildings comprising residential units (Use Class C3), ground and first floor commercial space (Use Class E) and public plaza. Reconfiguration of the existing multi-storey car park, vehicle parking and servicing, along with the provision of associated cycle parking, refuse storage, amenity floorspace, landscaping and public realm works (existing M&S, Travelodge and RBK Council Car Park are retained and excluded from the proposals).
Tolworth Tower Tolworth Broadway Tolworth KT6 7EL
Change of use of the existing 3rd to 22nd floors in Tolworth Tower from office (Use Class B1) to residential (Use Class C3), change of use of the existing 2nd floor from office (Use Class B1) to ancillary amenity space, including a residents gymnasium and lounge (Use Class C3), change of use of existing 1st floor Car Park (sui generis) to create a flexible workspace unit (Dual Use Class C3/E), change of use of part of the existing ground floor undercroft from office (Use Class B1) to create freestanding retail kiosks (Use Class E) with associated external facade alterations and internal refurbishment works to Tolworth Tower; The demolition of the existing retail units fronting Tolworth Broadway and the construction of two new buildings (T2 up to 19 storeys and T3 up to 15 storeys) with residential units, ground floor commercial space (Use Class E) and public plaza; and The reconfiguration of the existing multi-storey car park, vehicle parking and servicing, along with the provision of associated cycle parking, refuse storage, amenity floorspace, landscaping and public realm works (existing M&S, Travelodge and RBK Council Car Park are excluded from the proposals).
Phase 6 (Copley Castle Bar) Part Of The Copley Close Estate Copley Close Hanwell London W7 1AZ
Details of surface water drainage scheme pursuant to condition 30 of planning permission ref.172235FUL dated 03.10.2018 for 'Construction of a two-storey, 3-bedroom house on land between Nos 11 and 15 Templeman Road; demolition of buildings within the Copley Castlebar area within the Copley Close Estate (including 47 dwellings, 288 sq. m. floor space in retail use (A1 Use Class), 195 sq. m. floor space in community use (D1 Use Class), and other structures) and the construction of 202 dwellings (46 x 1-bedroom flats, 129 x 2-bedroom flats, 4 x 2-bedroom houses and 23 x 4-bedroom houses) contained in buildings between 3 storeys and a maximum of 8-storeys; replacement retail (A1 Use Class) facilities comprising 412 sq. m. floor space; 195 sq. m community space (D1 Use Class) and community estate management office and meeting room (105 sq. m); alterations to the public highway to accommodate reconfigured and new parking providing a total of 47 spaces on-street, cycle parking facilities (388 spaces), engineering operations, landscaping and public realm works including lighting, landscaping and children's play equipment (Regulation 3 Application by London Borough of Ealing)'