27 Clapham High Street London Lambeth SW4 7TR
Application for a Non-Material Amendment following a grant of planning permission ref. 21/02459/FUL (Retention of E(a) retail use on part of the ground floor and refurbishment and conversion of the property to provide 3 self-contained maisonette flats involving the erection of a side extension at second-floor level with a paved roof terrace, replacement of all windows and doors and roof covering with installation of rooflights, front and rear dormer windows and one front/one rear window at third-floor level, the formation of lightwells and courtyard amenity space at ground floor level, the provision of a landscaped communal amenity space at upper ground floor level together with the provision of a cycle store, refuse/ recycle storage and other associated alterations.) Amendment sought: Proposal to change the rear elevation from brick to render, proposal to modify the roof configuration and correction of existing roof drawings showing chimney
95 Newland Street Witham Essex CM8 1YZ
Non-Material Amendment to permission 19/01533/FUL granted 15.05.2020 for: Ground floor alterations and proposed single storey rear extension. Amendment would allow: Change the design of the shop front window, by omitting the horizontal glazing bars, leaving 4 equal panes
64 Northfield Avenue West Ealing W13 9RR
Application for a Minor Material Amendment (S73a) to vary condition 2 (Approved Drawings) of planning permission ref: 194784FUL dated 29/05/2020 for: Part change of use from bakery (Use Class A1) to residential (Use Class C3); first floor rear/side infill extension; alteration of roof from hip to gable end; rear roof extension; roof extensions to rear outrigger roof slopes; conversion part of the property into 3 self-contained flats. Variation seeks to alter the internal layout and use of ground floor shop unit as office and staff accommodation
Hammersmith Town Hall King Street London W6 9JU
Non-material amendment to planning permission ref: 2018/01500/FUL dated 22 October 2019 for the Demolition of 181-187 King Street, Town Hall Extension, Quaker Meeting House 20 Nigel Playfair Avenue (West), Register Office Nigel Playfair Avenue (West) and remainder of former Cineworld 207 King Street. Redevelopment, to include the Nigel Playfair Avenue (West) Car Park and Nigel Playfair Avenue (East), to provide four new build blocks comprising existing and new basements plus between six and eight storeys in height comprising 204 dwelling units (Class C3), retail (Class A1), Restaurant/café use (Class A3), Cinema (Class D2) and Office (Class B1) to include enterprise units; internal and external alterations and roof extension of the Grade II Listed Town Hall building to provide refurbished civic centre and new office use (Class B1), creation of a civic square and public realm works, play space, landscaping and associated residential and non-residential car parking (including disabled), cycle parking, motorcycle parking, access and servicing (EIA Development). Internal and external amendments to new build elements including changes to terracotta panel sizes, winter gardens, windows, roof level, and cores.
Harmony Bar 82 Railton Road London SE24 0LD
Application for a non-material amendment following a grant of planning permission ref: 15/00594/VOC (Variation of Condition 2 pursuant to planning permission Ref: 12/04161/FUL (Re-construction of the existing part single part three storey building to provide 8 residential units at first, second and third floor levels and two commercial units of retail/shops (Use Class A1) use at ground and basement levels involving part demolition of the existing building and reconstruction including the enlargement of the existing basement, the construction of a four storey extension to the side and three additional storeys above existing single storey on corner of Railton Road and Effra Parade incorporating a mansard roof together with alterations to windows and doors in the existing elevations and, the provision of cycle parking and refuse storage and as well as communal (garden) and private (balconies) amenity space.) Granted on 18.09.2013) granted on 14.09.2017. Amendment sought: Minor amendments to the approved scheme including the following: 1. Ensure that the consented floor plans and elevations are aligned. 2. Enhanced set back of the ground floor recessed glazing facades to facilitate the installation of floor level glazing, so that the lower ground floor can be naturally illuminated. 3. The installation of new glass balustrades to the perimeter openings, these to match those to the floors above, so that natural lighting to the lower floor is maximised, whilst a harmonious appearance for the building as a whole, together with perimeter security, is enhanced. 4. All other aspects of the facades and the look and feel of the main elevations are to be retained as built. 5. The use of the ground and lower ground floors will remain as currently approved.
Department Store 90-94 Broadway West Ealing London W13 0SA
Minor material amendment (S.73) to vary condition no.20 (opening hours), seeking to allow changes on the opening hours in extension to delivery times, in pursuant to planning permission reference P/2002/0909 dated 16/06/2004 for 'Demolition of existing retail store and redevelopment to provide ground and part first floor retail unit with 131 flats above, comprising 4-storey residential above retail unit (fronting The Broadway) and 8-storey residential above ground and mezzanine parking (fronting Singapore Road), servicing, landscaping and refuse storage
263 New King's Road London SW6 4RB
Non-material amendment to planning permission ref: 2021/04138/FUL granted 31st May 2022 for the 'Change of use of part of ground floor and basement from retail (Class E) into 1 x 1 bedroom self-contained flat (Class C3); erection of rear extensions at third floor (pod) and first floor levels in connection with the conversion of first, second and third floor level into 2 x 2 bedroom self-contained flats; installation of 3no rooflights in the front roofslope and 1no rooflight above the main flat roof at roof level; replacement of existing windows with new windows to the side and rear of first and second floor back additions; replacement of existing dormer window with a new dormer window in the rear roofslope; alterations and increasing the roof of second floor rear back addition; formation of a replacement roof terrace at first floor level to the rear elevation; demolition of part of ground floor and basement floor level including the installation of new window openings and formation of a central courtyard at ground floor level, installation of glazed doors and a window at basement level; alterations to the roof of ground floor rear back addition to include the installation of 3no rooflights; installation of screening fence at ground floor level to the rear elevation.' Partial amendments to the wording of description of development to change from '1 x 1 bedroom self-contained flat' to '1 x 2 bedroom contained flat' in reference to the number of approved bedrooms to Unit 1.
77 Brighton Road Surbiton KT6 5NF
Details required for Condition 7 (Details of Fixed Windows), 8 (Noise Attenuation Measures) and 9 (Mechanical Ventilation System) of planning permission 22/00580/FUL (Application under Section 73 of the Town and Country Planning Act 1990 to carry out development without compliance with Condition 1 (Approved plans) of Planning Permission 21/03278/FUL (Erection of two storey side and rear extension to create 1no. three-bedroom dwelling.) to allow for, amendment to shop fenestration, installation of additional roof lights, increase of rear extension by 1m and amendment to roof)
Land Formerly 82 Railton Road London
Application for a non-material amendment following a grant of planning permission ref: 15/00594/VOC ( Variation of Condition 2 pursuant to planning permission Ref: 12/04161/FUL (Re-construction of the existing part single part three storey building to provide 8 residential units at first, second and third floor levels and two commercial units of retail/shops (Use Class A1) use at ground and basement levels involving part demolition of the existing building and reconstruction including the enlargement of the existing basement, the construction of a four storey extension to the side and three additional storeys above existing single storey on corner of Railton Road and Effra Parade incorporating a mansard roof together with alterations to windows and doors in the existing elevations and, the provision of cycle parking and refuse storage and as well as communal (garden) and private (balconies) amenity space.) Granted on 18.09.2013, granted on 11/09/2017) Amendment sought: Minor amendments to the approved ground floor elevations including: 1.Provide enhanced set-back depths around the ground floor openings to the main facades to provide inset terraces to the ground floor units, and to increase the pavement glazing at floor level to illuminate the lower ground floor better naturally. 2.Replacement of the consented perimeter planters within the ground floor openings with new glass balustrades to match those to the upper floors to better enhance the ground floor appearance and security. 3.All other aspects of the facades and the look and feel of the main elevations are to be retained as built.
The Fountain 120 Malden Road New Malden KT3 6DD
Non-Material Amendment to Planning Permission ref: 20/02531/FUL (Variation of Condition 1 (Approved Plans) of Planning Permission 19/00699/FUL (Variation of Condition 2 (Approved Plans) of planning permission 17/15272/FUL (Restoration and retention of The Fountain public house (A4 use), erection of a 4-5 and 3-4 storey building to provide 45 one, two and three bedroomed residential flats (C3 use) and new retail/ restaurant/ cafe to ground floor (A1/A3 use) with associated car parking, roof terraces, balconies and landscaping). Main changes include: Provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts.) Main changes to include provision of electricity substation, water tank/ pump, reconfiguration of cycle/ bin stores, extension to proposed public house, additional cycle hoops, guard rails to flat roofs and alterations to flat layouts) dated 09/04/2021. Amendment to entrance door and glazing arrangement to Block B.