Former Windmill Hills Nursing Home Mulgrave Terrace Gateshead NE8 1PS
Discharge of conditions 10 (Careful Working Statement), 11, (Protect Listed Building), 15 (Roof Repair Schedule) and 17 (Weatherproof roof) of consent DC/18/01038/LBC
Former Windmill Hills Nursing Home Mulgrave Terrace Gateshead NE8 1PS
Discharge of condition 2 (Further survey works) and 4 (Report on Survey Work) of planning application DC/18/01038/LBC.
Former Windmill Hills Nursing Home Mulgrave Terrace Gateshead NE8 1PS
Discharge of condition 12 (Scaffolding) of listed building consent DC/18/01038LBC
Former Windmill Hills Nursing Home Mulgrave Terrace Gateshead NE8 1PS
Discharge of condition 35(Travel Plan) of planning approval DC/18/0158/FUL
Block 2 Half Moon Lane Gateshead NE8 2AA
Discharge of condition 8 (Stone Cleaning) of Listed Building Consent DC/20/00139/LBC
Block 2 Half Moon Lane Gateshead NE8 2AA
Discharge of condition 13(Travel Plan) of planning approval DC/20/00137/FUL
Block 2 Half Moon Lane Gateshead NE8 2AA
Discharge of conditions 7(Soft Landscaping) and 9(Landscape Maintenance) of planning approval DC/20/00137/FUL
Land East Of Collingdon Road Rowlands Gill
Discharge of conditions 8 ( Crossing around B6315 Glossop Street), 10 (Crossing western side B6315) , 14 (Travel Plan) , 16 (Drainage assessment and SUDS), 18 ( Foul drainage), 24 ( Ecological mitigation measures), 29 (Phasing plan), 31 ( Tree protection measures), 36 (Noise mitigation measures) of planning approval DC/15/01041/OUT
Land Bound By Kingsway North And Second Avenue Team Valley Gateshead NE11 0JU
Discharge of condition 6 (Coal Mining Risk Assessment), 7 (CMRA additional Remediation), 8 (Implement CMRA Remediation), 10 (Service trences and levels), 15 (Phase 2 Risk Assessment), 17 (Remediation Strategy), 29 (Construction Method Statement), 30 (SUDS),36 (Materials), 55 (RES MATS ground levels), 57 (Substation), 59 (Retaining Walls Details), 61 (RES MATS Retaining Walls), 63 (Surface finishes), 67 (Refuse), 69 (Framework Travel Plan), 71 (cycle rack details), 79 (Car Park Layout), 85 (Cycle parking re networks), 89 (RES MATS Implement Ped connectivity), 91 (Drainage Design), 93 (Water Quality Management Plan), 95 (SuDS construction method statement), 97 (Flood Resilience Measures), 99(H and S Risk Assessment), 101 (SuDS Management Plan) and 103 (Foul and Surface Water drainage) of planning application DC/15/01137/OUT.