123 Grove Park London Southwark SE5 8LD
Details of Condition 3 - Archaeological building record Level 3 (part 2) as required by LBS application 17/AP/4124 granted 30/07/2021 (Change of use from Class D1 with an ancillary Class B1 office function to Class C3 for residential use, including conversion and part demolition of existing main house to enable the creation of 5x new residential units and the construction of 4x new residential units in the rear garden with 9x off street parking spaces, associated communal and private landscaped areas.)
75-76 Blackfriars Road London Southwark
Listed building consent for refurbishment and extension of ground floor and lower ground floor offices including partial demolition of existing structures. Refurbishment, extension and conversion of upper floors from residential to hotel use Change of use for part of building from residential to hotel. Alterations to railings on Blackfriars Road to provide wheelchair access.
75-76 Blackfriars Road London Southwark
Refurbishment and extension of ground floor and lower ground floor offices including partial demolition of existing structures. Refurbishment, extension and conversion of upper floors from residential to hotel use Change of use for part of building from residential to hotel. Alterations to railings on Blackfriars Road to provide wheelchair access.
91-93 Peckham High Street London Southwark SE15 5RS
Details of Condition 3 'CEMP' as required by planning permission ref. 16/AP/3075 (for the redevelopment comprising of the removal of the Peckham Arch and redevelopment and part conversion of the southern part of the square (including 91-93 Peckham High Street) to provide a mixed use scheme comprised of two buildings of 4 and 6 storeys to provide 19 residential (Class C3) units, 255 sqm of gallery (Class D1) space, 201 sqm of co-work (Class B1) space, and 82 sqm of office (Class B1)/retail(Class A1) space with ancillary covered cycle storage and enclosed refuse storage).
91-93 Peckham High Street London Southwark SE15 5RS
Discharge of Schedule 9, Clauses 1.1 and 1.4 - 'Management Plans: Demolition Environmental Management Plan' of the Unilateral Undertaking relating to planning permission 16/AP/3075 (Redevelopment comprising the removal of the Peckham Arch and redevelopment and part conversion of the southern part of the square (including 91-93 Peckham High Street) to provide a mixed use scheme comprised of two buildings of 4 and 6 storeys to provide 19 residential (Class C3) units, 255 sqm of gallery (Class D1) space, 201 sqm of co-work (Class B1) space, and 82 sqm of office (Class B1)/retail(Class A1) space with ancillary covered cycle storage and enclosed refuse storage)