116 Church Hill Road North Cheam Sutton SM3 8NA
Change of use of ground floor retail unit (Class E) to a residential use (Class C3) and demolition of a two-storey building at rear. Erection of a two-storey rear extension and a loft conversion, including front and rear dormer extensions to provide 3 residential units, with cycle and refuse storage.
8 Dibdin Close Sutton SM1 2PJ
Conversion of the property into two self-contained residential units involving the erection of a two storey side extension, loft conversion, rear dormer with front rooflights and a single storey rear extension. Provision of refuse and cycle stores.
167 Richmond Road Beddington CR0 4SL
Conversion of the existing dwellinghouse into two self-contained residential units, involving erection of a single storey rear extension and a dormer extension at rear and provision of cycle stores.
42A Benhill Avenue Sutton SM1 4DA
Conversion of ground floor mini cab office into a self contained residential unit, including the erection of a single storey rear extension and alterations to front, side and rear fenestrations.
104 High Street Carshalton SM5 3AE
Change of use of first floor from Office (B1) to two self contained residential units (C3) with separate access from ground floor rear, involving conversion of loft space with formation of a mansard roof extension at front, a dormer extension at rear and provision of cycle and refuse stores.
43-45 Stayton Road Sutton SM1 1QY
Change of use from C2 (residential care home) to C3 (residential) to provide 6 self contained residential units including the erection of a first floor rear extension, conversion of loft space involving alterations to existing roofline, two dormer extensions at rear, rooflights to front and rear roofslopes, installation of two first floor flank windows and provision of refuse/cycle stores.
2 Bernard Road Wallington SM6 0TU
Conversion and change of use of ground floor from dog grooming palor (SG) to a residential dwelling (C3), erection of a single storey rear extension, external alterations and erection of a front boundary wall, cycle and bin storage.