Uplands Conference House And Training Centre Four Ashes Road Cryers Hill Buckinghamshire HP15 6LB
Section 19 application of Planning (Listed Buildings and Conservation) Act 1990 for variation of condition 2 (plan numbers) attached to listed building consent to 16/05054/LBC (Listed Building application for demolition of former coach house block and erection of new two storey building providing 1 x 1-bed, 10 x2-bed & 2 x 3-bed self-contained flats. Conversion of former Conference Centre buildings including extensions & alterations to provide a terrace of 1 x 2-bed & 2 x 2-bed houses, 1 x 3-bed detached dwelling & 42 x 1,2 & 3-bed flats with reception area/offices/storage to ground & first floor of Central Block (59 dwellings in total). Alterations to site access, amendment to parking layout within site, boundary treatment, landscaping & associated ancillary works) to allow for proposed non material design amendments and changes to the unit mix in response to market demand
Uplands Conference House And Training Centre Four Ashes Road Cryers Hill Buckinghamshire HP15 6LB
Proposed non-material amendment to permission demolition of former coach house block and erection of new two storey building providing 1 x 1-bed, 10 x 2-bed & 2 x 3-bed self-contained flats. Conversion of former Conference Centre buildings including extensions & alterations to provide a terrace of 1 x 2-bed & 2 x 2-bed houses, 1 x 3-bed detached dwelling & 42 x 1,2 & 3-bed flats with reception area/offices/storage to ground & first floor of Central Block (59 dwellings in total). Highway works to Four Ashes Road, to include provision of a footpath beside Four Ashes Road between the site and Cryers Hill, alterations to site access, amendment to parking layout within site, boundary treatment, landscaping & associated ancillary works granted under planning ref: 16/05053/FUL
Victoria House 28 - 32 Desborough Street High Wycombe Buckinghamshire HP11 2NF
Erection of new mansard roof extension over existing flat roofed building to create six residential units comprising 2 x studio units, 3 x 1-bedroom units and 1 x 2-bedroom unit with external alterations
1 & 2 Orchard Place & 1 & 2 The Crescent Stokenchurch Buckinghamshire HP14 3UQ
Demolition of existing cottages at 1 & 2 The Crescent and erection of 2 x 2-bed semi-detached dwellings, erection of 2 storey side extensions to 1 & 2 Orchard Place with internal alterations to the existing building to create 1 additional dwelling (5 x 2-bed dwellings in total) with associated parking, landscaping and external alterations
Station Court Station Road Bourne End Buckinghamshire
Erection of first and second floor side extension over undercroft parking to facilitate provision of 2 x 2 bed flats, external alterations including installation of balconies and insertion of additional windows to the first floor of existing building, associated car and cycle parking, bin storage and landscaping works
Formoso And Land Adjacent Formoso Kiln Lane Bourne End Buckinghamshire SL8 5JE
Demolition of Formoso and erection of 8 x dwellings with associated car ports garages (5 x 4 bed & 1 x 5 bed detached dwellings) and a pair of semi-detached dwelling (2 x 4 bed) with access to site using existing shared private driveway onto Kiln Lane and associated external alterations.
High Wycombe Croquet Club Hazlemere Recreation Ground Amersham Road Hazlemere Buckinghamshire
Erection of 3 x additional croquet lawns with associated works including construction of retaining walls and 3 x timber shelters, installation of 8 x floodlights and 4 x flagpoles, excavation works to the lawns, fencing to enclose additional lawns and alterations to entrance path to High Wycombe Croquet Club
Ramcrete Property Ltd Halifax Road Cressex Business Park High Wycombe Buckinghamshire HP12 3SN
Variation of condition 2 (plan), condition 4b and 4c (carbon reduction and ecology) attached to PP 19/07522/FUL (Erection of part two/part single storey front extension and creation of mezzanine floor, with insertion of new windows to rear and alterations. Replacement of two single garage doors in workshop with one double door, retention of existing covered structure to the south west of the site and erection of new palisade fencing to boundary and security gate to access) (Part Retrospective)