Edmonton Lower School, Little Bury Street, London, N9 9JZ
Details submitted pursuant to Ref:P13-00157PLA (car park works only) comprising Hard standing materials (Condition 2), existing and proposed ground levels (3), wheel cleaning (6), Construction logistics plan (7), details of design (12), Archaeological works (14), Construction management plan (15), surface water drainage (18), tree protection (20 & 21) and site waste management plan (32) for the provision of a new 2-Form Entry Primary School comprising the erection of a 3-storey teaching block (with primary school classrooms at ground floor level and secondary school classrooms at first and second floor levels) connecting into Block C following demolition of the existing Secondary School Design Technology Block, the erection of a freestanding single-storey replacement Design Technology Block for the Secondary School, internal remodelling and refurbishment of Blocks A, C and F to provide additional classrooms, a 40 space car park to the south of the site, additional cycle parking and relocation of existing cycle parking facilities, formation of a pedestrian access to Primary School from Church Street, erection of fence to separate primary and secondary play areas and associated landscape works.
The Arriva Bus Company Depot Dunstable Road Luton LU4 8DG
Construction of a new yard, including additional 4.5m acoustic fencing and 12m high external lighting, and alterations to existing yard following demolition of Former Social Club and erection of lean-to extension at the rear of the workshop building. Discharge of Conditions 4 (Noise Impact Assessment) and 5 (Lighting Design and Product Information) of plannng permission 20/00310/FUL dated 6th July 2020.