22-24 The Avenue West Ealing W13 8PH
Details of external sound level from plant, machinery or equipment pursuant to condition 7 of planning permission ref: 225402FUL dated 30/08/2023 for: Conversion of flat above from one residential unit into three flats incorporating change of use of part rear ground floor shop; rear extension to part ground, first, second and third floors; alterations to shopfront and formation of front entrance, conversion of roof to rear of No 22 to form rear amenity courtyard; replacement of existing concrete profiled tiles to No 22 with slate tiles; replacement boundary to No. 24 with side access on Gordon Road; changes to rear window openings at ground and first floor level; window opening to side elevation at first floor level; cycle and refuse storage; removal of external rear staircase and ground floor structure; construction of two mews houses with roof terraces and solar PV (following demolition of existing rear outbuildings/light industrial workshops)
19 Harbour Road Seaton Devon EX12 2LX
Demolition of buildings in yard and construction of single storey extension to shop with new pitched roof over to create new flat, part in existing building and part in new roof.
Plot H11B Within Land Bound By Plot H11A And Elephant Park To The North Rodney Place And Rodney Road To The East Heygate Street To The South And Plot H7 To The West
Non-material amendments to reserved matters approval ref. 18/AP/1863 (Application for the approval of reserved matters (access, scale, appearance, layout and landscaping) for Plot H11B within Elephant Park (previously referred to as the Heygate Masterplan), submitted pursuant to the Outline Planning Permission ref: 12/AP/1092. The proposals comprise the construction of two buildings of between 11 and 25 storeys in height (maximum building height 84.2m AOD) comprising 259 residential units, 285 sqm (GEA) flexible retail, office, community and leisure uses (Classes A1-A5/B1/D1/D2), cycle storage, servicing, plant areas, landscaping, new public realm, and other associated works). The proposed amendments include Changes to the material of 'the knots' from glass to metal Changes to the material detailing of the tower balconies from back painted glass with glass balustrades to profiled aluminium facade with vertical metal slat balustrades Balcony changes to the mansion block from perforated metal to flat metal vertical slats Removal of planting from aluminium panel on the ground floor of the Heygate Street elevation Removal of planting on the canopies of levels 1 and 2 on the tower and revised canopy design Increase in the size of the internal amenity area on level 24 of the tower New substation location Amendments to the Heygate Street residents entrance Amendments to the Park residents entrance Removal of LV switch room to replace with cycle entrance Rotation of retail unit to face Maddock Place Revised feature lighting on the tower Amendments to the roof terrace of the mansion block Adjustment to the path and entrance to tower from park side Alterations to the configuration of the residential units and Wind protection added to balcony 205 of the tower in response to submitted wind analysis.
1-5 Featherstone Road Southall UB2 5AA
Construction of a second floor and third floor mansard roof with terrace areas including a three storey rear extension (following demolition of existing storage) forming 10 self-contained residential units; including conversion of part existing ground floor retail to residential unit; associated cycle and refuse storage; existing three retail units at ground floor level
35 Green Street Forest Gate London E7 8DA
Construction of a loft conversion with rear dormer including two front roof lights, first floor rear extension incorporating windows to the side and Change of use of the first floor from retail storage to residential (Use Class C3) to provide 1 x 3-bedroom 4-person flat.
9 High Street Histon Cambridgeshire CB24 9JD
Demolition of single storey workshops. Construction of a two storey rear extension. Refurbishment, re-roofing, and re-cladding of an existing two storey office block. Creation of a Net Zero office development with a single storey front retail unit. New hard and soft landscaping throughout.
11 Pier Road North Woolwich London E16 2JJ
Retention of the existing commercial unit with a new shop front and internal layout, construction of a two storey rear extension and a loft conversion with rear dormer extension at the roof level including Juliet balcony to the front to create 1 x 1 bed and 2 x 2 bed residential units.
135 Park Street And 4-8 Emerson Street London SE1 9EA
Discharge of Schedule 4, Clause 1.2 'Delivery and Service Monitoring Plan' of the Section 106 Agreement attached to planning permission 19/AP/0240 [dated 27.08.2020] for: "Redevelopment of the site including the demolition of the existing buildings and construction of a 12 storey building (plus basement and roof top plant enclosure) with a maximum height of 50.707m AOD, comprising office (Class B1) floorspace on all floors with a flexible retail/café (Class A1/A3) unit at ground floor level. The development will include cycle parking, servicing, refuse and plant areas, hard- and soft-landscaped public realm improvements and other associated works".
51 East Street London Southwark SE17 2DJ
Demolition of existing building and construction of a four-storey building with basement and roof accommodation to comprise a 41 room hotel with a ground floor and basement retail unit.
Acton Post Office 23-31 King Street Acton London W3 9LA
Application for Minor Material Amendment (S73) to vary Condition 2 of planning permission ref: 173577FUL, dated: 25/04/2018 for "Construction of a third, fourth and fifth roof level extension and part four and five storey rear extension (following demolition of the existing three storey rear extension) for the creation of ten self-contained residential units; 440.5sqm of retail floorspace (Use Class A1); 68sqm of flexible use floorspace (Use Class A1, A2 or B1a); cycle and refuse/recycling storage". Amendment seeking to incorporate new columns at either end of the front elevation