The Corner House 40 Abenberg Way Hutton Essex CM13 2UG
Proposed porch to front elevation. Construction of single storey rear and side extension, and alterations to fenestration to include the installation of weatherboard to front, rear & side elevations of house.
New Avenue Estate, Including Shepcot House, Beardow Grove, Coverack Close, Oakwood Lodge, Garages To The Rear Of The Lousada Lodge, Hood Avenue Open Space And Cowper Gardens Open Space, London, N14.
Details submitted pursuant to reference 20/00037/VAR: travel plan (47) in respect of variation of condition granted under planning application 16/01578/FUL (as amended by 18/02662/NMA and 19/03917/NMA for drawings (3) levels (5), materials (8), parking and turning areas (14), privacy screens (26), drainage (28) and unit mix and numbers (53), and removal of condition 11 (accommodation schedule) and condition 44 (former mews site) in relation to the Demolition of Shepcot House, Oakwood Lodge, Beardow Grove, Coverack Close and garages rear of Lousada Lodge and phased redevelopment of site involving construction of new road to provide new residential accommodation (Class C3) within a mix of buildings up to 9 storeys, erection of a nursery and community building (Class D1), construction of an energy centre, formation of play space including play area at Cowper Gardens open space and provision of surface and undercroft car parking spaces. The minor material amendments include: increase in residential units numbers, alterations to unit mix, changes to the design of Blocks A1, A2, A3, A4, B1, B2, C1, D1, D2, D3, D4, E1, E2 and removal of Block E3, changes to tenure of blocks, amendments to building heights, landscaping and play provision and parking and cycle parking in relation to Phases 2 and 3.
Ashbourne Methodist Church Church Street Ashbourne Derbyshire DE6 1AE
Construction of extensions, internal and external alterations to existing church, associated buildings and Chapel House including demolition, creation of community garden and associated works.
Craven Heifer Main Street Addingham West Yorkshire LS29 0PL
Variation of condition 2 (plans) of planning application ref: 22/05117/FUL for the construction of a detached house. Alterations to the house type, inclusion of solar panels on southern roofslope and reduction in height of rear boundary wall.
Chadlington Manor House East End Chadlington Chipping Norton Oxfordshire OX7 3LX
Alterations to main dwelling including construction of replacement porch, works to roof to include replacement and additional dormer windows. Re roofing of existing gardeners room. Erection of a greenhouse, a Summer house and an agricultural barn along with the refurbishment of the existing stables and garage. Refurbishment of existing lake with the installation of a Water Source Heat Pump and the addition of solar panels to the South side of the lake and associated works (Amended Plans).
9 Arundel Street Portsmouth PO1 1NB
Conversion of first floor offices (Class E) and construction of additional floors to form 9 bed/9 person House in Multiple Occupation; alterations include changes to fenestration and provision for refuse and bike storage.
Dragon School Bardwell Road Oxford Oxfordshire OX2 6SS
Variation of condition 2 (Develop in accordance with approved plns), 4 (Landscape plan carry out by completion) and 8 (Hard surfaces) of planning permission 23/00099/VAR (Variation of Condition 2 (Develop in accordance with approved plns) of planning permission 17/02419/FUL (Erection of new Music School, construction of link to Lynam Hall, landscaping including the formation of a new courtyard, garden area to Lane House and entrance courtyard. (Amended plans)(Additional information-Acoustic Report and Engineering Report)) to allow revisions of the window details and the extent and siting of solar panels on the roof.) to allow changes to the internal arrangement of the main hall including a new fire door to north west elevation with steps and ramp access, formation of planters between the new music facility and the existing Lynam Hall, omitting of 1no east facing fire door and alterations to landscaping.
The Grange Newtown Lane West Pennard Glastonbury Somerset BA6 8NL
Addition of first floor onto the existing annexe; alterations to the house and construction of a new terrace
15 Brook Gardens Kingston Upon Thames KT2 7ET
Details required for Condition 6 (Construction Management Plan), 17 (Drainage Scheme) & 19 (Foul water scheme details) of Planning Permission ref: 22/02422/FUL (Erection of new dwelling house to rear of 15 Brook Gardens with associated landscaping, cycle storage and alteration to existing coach house.)
New Avenue Estate, Including Shepcot House, Beardow Grove, Coverack Close, Oakwood Lodge, Garages To The Rear Of The Lousada Lodge, Hood Avenue Open Space And Cowper Gardens Open Space, London, N14.
Details pursuant to ref 20/00037/VAR for requirement M4(2) (12) Phase 2, in respect of the variation of condition granted under planning application 16/01578/FUL (as amended by 18/02662/NMA and 19/03917/NMA for drawings (3) levels (5), materials (8), parking and turning areas (14), privacy screens (26), drainage (28) and unit mix and numbers (53), and removal of condition 11 (accommodation schedule) and condition 44 (former mews site) in relation to the Demolition of Shepcot House, Oakwood Lodge, Beardow Grove, Coverack Close and garages rear of Lousada Lodge and phased redevelopment of site involving construction of new road to provide new residential accommodation (Class C3) within a mix of buildings up to 9 storeys, erection of a nursery and community building (Class D1), construction of an energy centre, formation of play space including play area at Cowper Gardens open space and provision of surface and undercroft car parking spaces. The minor material amendments include: increase in residential units numbers, alterations to unit mix, changes to the design of Blocks A1, A2, A3, A4, B1, B2, C1, D1, D2, D3, D4, E1, E2 and removal of Block E3, changes to tenure of blocks, amendments to building heights, landscaping and play provision and parking and cycle parking in relation to Phases 2 and 3.