21 Station Road Headcorn Kent TN27 9SB
Lawful Development Certificate (Proposed) for erection of replacement boundary fence, installation of hard surfaces and construction of a building for incidental use.
18 Austen Way Larkfield Aylesford Kent ME20 6UL
Lawful Development Certificate Proposed: Demolition of an existing uPVC conservatory and construction of a new brick-built single-storey 'orangery' type extension. New building work will be completely within the curtilage of the property and only partially visible from the estate access road due to the presence of a retained boundary fence line. The proposal has previously been endorsed by means of a Lawful Development Certificate (LDC) from Tonbridge & Malling BC, but a new application for a new LDC is requested due to the overall plan dimensions of the proposed extension requiring minor amendment due to site conditions
5 Dene Way Speldhurst Tunbridge Wells Kent TN3 0NX
Lawful Development Certificate (Proposed) - Construction of a garden outbuilding for a purpose incidental to the enjoyment of the dwellinghouse, measuring 7.36m long x 3.9m wide x 2.5m to the ridge set within the residential curtilage against the north western boundary fence, with the front elevation 9.50m from the rear wall of the dwellinghouse
113 Mount Grace Road Potters Bar Hertfordshire EN6 1QY
Installation of pool, patio, and soft landscaping, and construction of outbuilding to rear. Installation of hard landscaping to front boundary and new fencing. Certificate of Lawful Development (Proposed).
North Wing And West Wing Home Farm Manor Road Rowsham Buckinghamshire HP22 4QP
Application for a Lawful Development Certificate for the proposed construction of front porch, alterations to existing window and door openings, insertion of new window and door openings, insertion of roof windows to rear roof slope, hardstanding and boundary fencing, and removal of lean-to extension from rear elevation.
Geynwood 23 Woodham Road Horsell Woking Surrey GU21 4DP
Certificate of Proposed Lawful Development for the removal of existing boundary fence and construction of replacement boundary fence and planting.