Telephone Exchange Church Street Great Baddow Chelmsford Essex
Change of use of land for the purposes of secure storage and distribution of materials and equipment in support of the local telecoms infrastructure network. Including the siting of 3 storage containers and construction of fences and addition of hardstanding area.
Transmitting Station Wolston Close Luton LU1 5SS
Telecommunications Installation: Replacement of a 0.3m diameter transmission dish with a 0.4m transmission dish and additional ancillary electronic communications equipment on the existing 45m tower. - Discharge of Condition No. 4 (Construction Method Statement) of Planning Permission No. 22/00036/FUL dated 11th March 2022
Ladderswood Estate, Bounded By, Station Road, Palmers Road And Upper Park Road, London, N11
Non-Material Minor Amendment (S96a) application pursuant to 16/02673/FUL to amend the trigger point of Condition 3 (Materials), Condition 4 (Levels), Condition 5 (Enclosure), Condition 6 (Parking and Turning Facilities), Condition 7 (Loading/Unloading), Condition 8 (Construction Access Roads), Condition 10 (Refuse Storage Facilities), Condition 17 (External Lighting), Condition 19 (Recycling Infrastructure), Condition 20 (Covered Cycle Parking), Condition 21 (Details of Balconies), Condition 23 (Delivery and Servicing), Condition 24 (Electric Vehicle Charging), Condition 25 (Accessible Parking), Condition 28 (Homezones), Condition 29 (Temporary Vehicular Access), Condition 30 (Communal Telecommunications Equipment), Condition 31 (CCTV Network), Condition 33 (Means to ensure Inclusive Access), Condition 34 (Site Wide Landscaping Strategy), Condition 44 (Tree Protection), Condition 46 (Rainwater Recycling System), Condition 47 (Surface Water Drainage Strategy), Condition 48 (Bat/Bird Nesting Boxes/Bricks), Condition 49 (Green/Brown Roofs), Condition 51 (Renewable Energy), Condition 53 (Combined Heat and Power Facility), Condition 54 (CHSH), Condition 55 (BREEAM), Condition 56 (Green Procurement Plan), and Condition 60 (Contamination Remediation Strategy), to enable site preparation works and demolition works to take place prior to discharge.
Valley Farm Bucklesham Road Foxhall Ipswich Suffolk IP10 0AT
Change of use to B8 storage of distribution & class E (G) 1 offices to carry out any operational or administration functions. Erection of 2.4m high perimeter security fence, construction of storage bays for materials associated with telecommunications infrastructure construction. Erection of 2 storey porter cabin offices for operational and admin staff.
Burton Green Tunnel Kenilworth Coventry
County Consult from Warwick District Council on planning permission W/22/1662 HS2 for Plans and Specifications submission under Schedule 17 to the High Speed Rail (London West Midlands) Act 2017 for works comprising: - Earthworks: Construction of a 'cut and cover' tunnel with associated retaining structure, two porous portals and diversion of watercourse - Sight, noise or dust barriers: Upside and downside concrete noise barriers at north-western end of Burton green Tunnel - Transformers, telecommunications masts or pedestrian accesses to railway lines: Reinstatement of Cromwell Lane and creation of underpass allowing improved pedestrian access, and realignment of Kenilworth Greenway - Fences or walls: Retaining walls to Burton Green Tunnel and boundary and security fencing (location only) (herein referred to as 'the assets'
Dover House Anerley Road Penge London SE20 8EN
Construction of additional storey (5th floor) comprising 2 no. two bedroom and 1 no. one bedrooms flats, elevational alterations including extension of parapet and external stair, works to roof including relocation of water tanks and formation of lift shaft and relocation of existing telecommunications apparatus onto new roof, associated works including provision of cycle and refuse storage. and level access path from Anerley Road. (REVISED DRAWINGS RECEIVED 6.4.22 INDICATING BUILDING LAYOUTS AND ADDITION OF LEVEL ACCESS PATH FROM ANERLEY ROAD)
Dulwich Hamlet Football Club Edgar Kail Way London SE22 8BD And Neighbouring Artificial Pitch At Greendale
Redevelopment of the Dulwich Hamlet Football (Champion Hill) Stadium, including the demolition of existing buildings, and use of land at Greendale, to provide: - the erection of a new stadium with relocated playing pitch with associated floodlighting and boundary treatment, and part two-part three storey clubhouse building with sports and leisure facilities, with capacity for 4,000 spectators (Use Class D2); - the construction of a multi-functional kickabout space and associated boundary treatment; - the erection of a series of buildings between four and six storeys in height to provide 219 residential dwellings, (Use Class C3); - associated car parking, cycle parking, refuse storage and access road; - the widening and greening of a public route with associated hard and soft landscaping; - the relocation of telecommunications equipment and re-provision of the substation together with plant and equipment.
Area Of Footpath Dovercourt Road London Southwark
Prior approval notification for the construction of an 18 metre high Phase 8 telecommunications pole with built-in cabinet, 3no. separate cabinets and ancillary works
RSPB Minsmere Sheepwash Lane Westleton Saxmundham Suffolk IP17 3BY
Certificate of Lawful Development (Existing) - Telecoms Mast at TM469670 16m Lightweight demountable construction
Land Adjacent To Aberfeldy House John Ruskin Street Southwark London SE5 0RS
Prior approval notification for the proposed construction of a 15 metre high Phase 8 telecommunications pole with built-in cabinet, 3no. separate cabinets and ancillary works