41-52 Gilda Avenue Enfield EN3 7UJ
Details pursuant to ref: 20/01815/FUL for existing and proposed ground levels (5) in respect of demolition of the existing buildings to provide three buildings comprising residential dwellings (Class C3), new pedestrian link to Mollison Avenue, associated landscaping, car parking and amenity space. Existing Site Topographical Survey (Dwg.TS19-048-1-2D TS19-048-1) Proposed Landscape Plan (Dwg.GAE-ULA-00-00-DR-L-1000-P1-A1 Landscape) Proposed Landscape Levels Plan (Dwg.GAE-ULA-00-00-DR-L-1150-P1-A1 Landscape) Proposed Hard Landscape Plan (Dwg.GAE-ULA-00-00-DR-L-1250-P1-A1 Landscape) Proposed Landscape Sections (Dwg.GAE-ULA-00-00-DR-L-2000-P1-A1 Landscape)
922 - 930 Purley Way Purley CR8 2JL
Discharge of condition 24 (car park management plan) attached to planning permission 22/01141/CONR for Variation of Conditions 2 (plans), 3 (detailed description), 11 (Fire statement), 17 and 18 (soft landscaping), 26 (refuse storage and cycle parking), 28 (energy statement), 34 (air quality), 36 (trees) and 37 (wheelchair accessible dwellings) of planning permission 20/06224/FUL for the 'Demolition of existing residential dwellings and erection of a residential development, with associated landscaping, access, cycle and car parking.
922 Purley Way Purley CR8 2JL
Discharge of condition 16a (public art strategy) attached to planning permission 22/01141/CONR for Variation of Conditions 2 (plans), 3 (detailed description), 11 (Fire statement), 17 and 18 (soft landscaping), 26 (refuse storage and cycle parking), 28 (energy statement), 34 (air quality), 36 (trees) and 37 (wheelchair accessible dwellings) of planning permission 20/06224/FUL for the 'Demolition of existing residential dwellings and erection of a residential development, with associated landscaping, access, cycle and car parking.
Former Watch Tower House And Kingdom Hall Sites The Ridgeway London NW7 1RS
Demolition of existing buildings and structures, and redevelopment of the site including construction of 10no new buildings, ranging from 1 to 5 storeys (plus basement) in height and refurbishment of and extension to Bittacy Cottage - comprising 175 units of specialist older persons housing (Class C2) with ancillary communal facilities, 9no. residential dwellings (Class C3) and a community facility (Flexible Class F1/F2/E) alongside public open space, provision of car and cycle parking, associated landscaping and associated works (SUBJECT TO SECTION 106 LEGAL AGREEMENT DATED 22 DECEMBER 2023)
Farm Buildings At Tythe Farm Staploe Road Wyboston Bedfordshire MK44 3AT
Conversion of existing light industrial units to 7 residential dwellings and demolition of 3 no. light industrial units.
Star Barton Farm Cowley Devon EX5 5DG
Demolition of existing agricultural buildings, construction of one dwelling, change of use of land to residential and associated works
Land At Coopers Ash Lane Cockhill Castle Cary Somerset BA7 7NU
Proposed demolition of an existing agricultural building (with planning permission for residential conversion) and erection of a single dwelling, with associated parking and landscaping
Church Farm Church Hill Road Barnet EN4 8XE
Demolition of swimming pool and shed and the erection of a new shed and a part single storey/part two storey terraced development to provide 8no. residential dwellings. Associated car and cycle parking and landscaping (This is a revision to identify the phasing of development)
Church Farm Church Hill Road Barnet EN4 8XE
Demolition of swimming pool and shed and the erection of a new shed and a part single storey/part two storey terraced development to provide 8no. residential dwellings. Associated car and cycle parking and landscaping. (This is a revision to identify the phasing of development)
Site Of Former Blackwell Grange Golf Club (East) Carmel Road South Darlington
Residential development consisting 44 No. dwellings, with associated access, landscaping, SUDS pond and infrastructure, demolition of agricultural building and the regeneration of Blackwell Grange historic parkland (Amended CMP received 30th August 2023, Additional information regarding Vibration received 30th August 2023) (Amended plans / additional information received 28th September and 2nd October 2023)