Hillside Farm Lancaster Road Heaton With Oxcliffe Morecambe Lancashire LA3 3ET
Erection of 100MW energy storage facility including 50 energy storage battery units within steel shipping containers, and ancillary development including substation, transformers, transformer compound, underground cabling, inverters, switchgear, control/switch room, office/site store building, creation of hardstanding, erection of 3m security fencing, access gates, seven 3m CCTV masts and associated balancing pond, landscaping, access track and parking and the change of use of existing farm house and farm building to ancillary offices
Northumbrian Water Boldon House Wheatlands Way Pity Me Durham DH1 5FA
Demolition of existing entrance and storage building, external building alterations and associated works including new entrance and first floor alterations (permitted development) replacement of windows and doors, alterations to mullions, repair of roof tiles, installation of Air Source Heat Pump and associated compound fence, hard surfacing, installation of 1 no. cycle storage shelter and electric charging, refuse storage area, landscaping, external lighting and CCTV, access ramp and steps, erection of electrical substation, boundary treatments and any other associated infrastructure.
46 Argyle Street Oxford Oxfordshire OX4 1SS
Application to certify that the proposed erection of a single storey garage, formation of new vehicle access, installation of fencing, plant beds and associated landscaping is lawful development
Rolls Royce Site Gloucester Road North Filton South Gloucestershire BS34 7QE
Demolition of existing buildings. Erection of a new research and development facility, external plant and tanks, and relocated site recycling centre, together with associated utilities diversions, internal access road realignment, erection of 2.4m-3m high fencing, and hard and soft landscaping.
College Farm Old Harrowden Road Harrowden Bedford Bedfordshire MK42 0TB
Erection of boundary fence with landscaping, 2 sheds to front/side of property and gates (Development already carried out)
6 Oaklands Gardens Kenley CR8 5DS
Discharge of condition 5 (hard and soft landscaping) of planning permission 19/01810/FUL (Alterations to land levels, erection of detached two storey 3 bedroom house with decking, associated bin and cycle stores) Car parking is no longer required in the area origionally planned therefore the area will propose that the area will be screened offf with a 1m high closed board fence and extra planting. The bin store will be relocated to alow access to the decked area and a step down to the existing drive. Development to be permitted to commence whilst this application is considdered
Site South East Of Hall Barn Road Industrial Estate Hall Barn Road Isleham Cambridgeshire
To discharge conditions 2 (scheme detailing fence, gated access and arrangements to the land), 9 (Road surface material) and 12 (timber boarding details) of decision dated 01/12/2022 for 22/00316/RMM for the reserved matters for appearance, landscaping and layout of previously approved 16/00629/OUM for the erection of buildings to accommodate up to 4,160 square metres for B1, B2 and B8 uses and associated development on land allocated by Policy ISL6 of the adopted Local Plan, adjacent to Hall Barn Road Industrial Estate
The Oast Norton Road Sutton Valence Maidstone Kent ME17 3RT
Section 73 - Application for Variation of condition iv (Permitted development rights) (to allow certain permitted development rights, in particular for Part 1, Class E (buildings etc incidental to the enjoyment of a dwellinghouse) and Part 2, Class A (gates, fences, walls etc) and other small scale domestic developments such as electric charging points to be carried out by the owners of the property without requiring planning permission) pursuant to application 74/0065 for Conversion of oasthouse into single dwelling unit, erection of double garage and landscaping details as amended by additional plans received 11/07 and 07/08/74.
Land Adjacent To East Croydon Station And Land At Cherry Orchard Road, Cherry Orchard Gardens, Billington Hill, Croydon.
Partial discharge of condition 3 (Landscaping - part of the fence/railing treatment on the corner of Oval Road and Cherry Orchard Road, adjacent to Cherry Orchard Garden element of the development) attached to planning permission 17/05046/FUL for the Erection of two 25 storey towers (plus plant) and a single building ranging from 5 to 9 storeys (plus plant) to provide a total of 445 residential units, with flexible commercial, retail and community floorspace (A1/A2/A3/A4/B1a/D1/D2) at ground and first floor level of the two towers and associated amenity, play space, hard and soft landscaping, public realm, cycle parking and car parking with associated vehicle accesses
Longcross North Chobham Lane Longcross Chertsey KT16 0EE
Section 73 application for Variation of Condition 10 (approved plans) of planning permission RU.21/0780 [(Phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus. The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)] to seek amendments to the approved plans including relocation of the energy centre, changes to the data centre building, re-positioning of the HV substation and re-siting and redesign of the back up generators.