The Poplars 2 Lilian Board Way Greenford UB6 0SB
Details trees, shrubs and hedgerows pursuant to condition 4 of planning permission ref: PP/2014/6582 dated 20/01/2016 for: Redevelopment and single and two storey extensions of C2 hostel, increasing existing building footprint by 327sqm and gross internal floor space by 1,566sqm. Development works to include: formation of Community Hub (Class D2); construction of a second storey; internal configuration; formation of additional 28 self-contained units (total 60 self-contained units and 217 beds up from 85 beds), vehicle and cycle parking, refuse and recycling store, boundary fencing, walling and landscape enhancements (Regulation 3 - Council's own development)
Unit 3A East Horndon Business Park Tilbury Road West Horndon Brentwood Essex CM13 3LR
Discharge of conditions 6 (Surface water drainage scheme), 7 (Scheme to minimise risk of offsite flooding), 8 (Maintenance Plan) and 12 (Fencing for trees and hedges), of application 22/01751/FUL (Full planning application for the development of a Class B2 / B8 building (industrial and storage and distribution including ancillary office provision), with associated access, vehicle and cycle parking, servicing, landscaping, and infrastructure.)
Hartland Park Ively Road Fleet Hampshire
Discharge of conditions concerning Development Phase 3: 14 - Woodland Management Plan - 15 - Arboricultural Implications Assessment and Arboricultural Method Statement - 16 - Tree Protection Fencing - 17 - Foul Drainage - 18 - Sustainable Urban Drainage System - 19 - Surface Water Drainage - 20 - Surface Water, Groundwater and Drainage - 26 - Management and Maintenance of Streets - 28 - Pedestrian and Cycleway Provision Along Principal Roads - and 32(a) - Energy and Sustainability Strategy, pursuant to 17/00471/OUT, Hybrid Planning Application (part full, part outline) for a residential-led mixed use redevelopment.
Land Off Charlton Road Filton Bristol South Gloucestershire BS10 6LB
Discharge of conditions 3 (street lighting), 20 (knee rail fencing) and 21 (highway verge tree pits) attached to planning permission PT15/4165/F. Proposed development of 80 dwellings (use class C3 including affordable homes), open space (including children's play space and improvements to Charlto...
17 Woodlands Court Walsoken WISBECH Norfolk PE13 3SD
Willow / salix. Circumstances approx 100cm Height approx - 40ft Tree is becoming to large / overgrown. The branches are now bending from the being to long and overweight l. Damage to fence line is highly likely. The hazard and risk has increased since we have been here, I am also concerned of any damage it could cause to myself and the family. I wish to fell the tree / reduce to a large stump or to prune the tree very far back to stunt growth. The only access to remove this is in a plot of waste land behind me, but the area will be blocked in by development soon.
Sedgefield Squash Club Ceddesfield Hall Rectory Row Sedgefield Stockton On Tees TS21 2AE
Non-material amendment pursuant to planning permission DM/17/02900/FPA to allow changes to the wording of condition 3 (to allow for development to commence upto damp proof course before details of walling and roofing materials are submitted) and condition 4 (to allow hand digging of trench only before the erection and inspection of tree protection fencing and measures)
Former H M Prison Blundeston Lakeside Rise Blundeston Suffolk NR32 5BE
Discharge of Condition Nos. 5, 6, 7, 9 and 10 of DC/18/4033/VOC - Variation of Condition No.2 of DC/17/2675/ARM - Approval of Reserved Matters of DC/16/2157/FUL - Hybrid planning application for demolition of prison and construction of 2no shop units with 4no flats, and 3no office units with car parking, 16no affordable housing units (full submission), and residential development including care home, roads and open space (outline submission) (Construction of 38 houses with access roads). - To provide a better layout incorporating improved car parking provision and additional space for soakaways. Replacement of drawings identified in Condition 2 of the Approval Notice for Application Reference DC/17/2675/ARM with those submitted with this application - Protection Fencing to Trees and Hedgerows, Hard Landscaping, Landscaping, Bin Storage and Highways Access Details
Land North West Of Maldon Hall Farm Spital Road Maldon Essex
Variation of condition 3 (approved drawings) & removal of conditions 4 (Construction Method Statement), 8 (soft landscaping details) and 9 (hard surfacing details) on planning permission 17/01106/FUL (allowed on appeal APP/X1545/W/18/3204562) ( Proposed development of an energy storage system for a temporary period of 20 years from the date of first import/export of electricity comprising a battery compound with battery storage and ancillary equipment, two electricity compounds with ancillary equipment, fencing, access track, underground cabling and other associated works and infrastructure including hedgerow and tree planting.)
Bickley Park School 24 Page Heath Lane Bickley Bromley BR1 2DS
Confirmation of commencement of development of planning permission reference 18/04267/FULL1 dated 20.03.2019 for demolition of the existing 2 storey theatre building, single storey classrooms and stores and erection of 2 storey performing arts centre together with removal of trees and replacement fencing and temporary classroom building. Lawful Development Certificate (Proposed)
Land At Hillborough Sweechbridge Road Herne Bay Kent CT6 6TE
Non-material amendment to planning permission CA//17/01866/FOS a mixed use development including up to 900 dwellings; to allow alterations to 5 house types, minor amendments to phase 1 layout, including reduction in parking spaces by 2, amended bus stop location, alterations to locations of lighting columns, addition of bollard lighting, alterations to landscaping including trees, ditches and fences/walls.