Development Site Bounded By Ebury Street, Pimlico Road, Avery Farm Row, Ebury Square And Cundy Street London
Amendments to planning permission dated 18th October 2022 (RN:20/03307/FULL) for Comprehensive residential-led mixed-use redevelopment, including demolition of Kylestrome House, Lochmore House, Laxford House, Stack House, Walden House and structures attached to Coleshill Flats; tree removal and pollarding; erection of a partial sub-basement, basement and buildings varying in height from five to 11 storeys, to provide affordable homes (Class C3), market homes (Class C3), senior living accommodation (comprising Class C3 and / or Class C2), alongside a range of uses at partial sub-basement, basement and ground floor level including retail (Class A1), restaurants / cafes (Class A3), drinking establishments (Class A4); offices (Class B1), community space (Class D1), cinema (Class D2); use of the lower ground floor of the Coleshill Flats as retail and / or workspace (Class A1 and / or B1); provision of new pedestrian routes; basement car parking; basement and ground floor circulation, servicing, refuse, ancillary plant and storage; provision of hard and soft landscaping; landscaping works and creation of new play facilities at Ebury Square; rooftop PV panels; rooftop plant equipment; refurbishment and relocation of Arnrid Johnston obelisk to elsewhere within the site; refurbishment and relocation of the water fountain on Avery Farm Row; repair and relocation of the telephone boxes on Orange Square; and other associated works, namely to amend the wording of Condition 6 to allow for revised CIL phasing.
Pine End Works & Land To The North Harbour Road Lydney
A hybrid planning application comprising of all existing structures and their demolition and mixed use development and associated infrastructure and works comprising of fish processing building (20,600m2 B2 use), Building consisting of an eel farm (8,000m2 of B2 use), plus 1,300m2 restaurant/cafe (A3 use) and 700m2 visitor centre (D1 use). Energy centre (800m2 B2 use), storage building (500m2 ancillary to B2 use), Amenity building for HGV drivers (150m2 ancillary to B2 use), Generator building/substations (500m2 ancillary to B2 use), staff accommodation consisting of 3 No. 3 bed dwelling houses, 8 No. 1 bed apartments, 4 No. 2 bed apartments and 18 shared units of accommodation for seasonal staff. New pedestrian, cycle and vehicular accesses onto Harbour road and a network of internal routes. 2 No water treatment lagoons, parking areas for visitors, staff and HGVs. Landscaping and planting and associated development and works. Utilities infrastructure including water supply, foul and surface water sewers and underground tanks, electrical supply (including substations), telecommunications equipment, on site renewable energy and associated works. Outline application (all reserved matters for approval other than external appearance) for the erection of a building containing up to 2,500m2 of A1,A2,A3,A4 and A5 uses. (Revised description.)
Land To The Rear Of Hazelfield Cottage Elstob Lane Great Stainton STOCKTON-ON-TEES TS21 1HP
Change of use of agricultural land for tourist accommodation including the siting of 3 No. holiday lodges and 3 No. hot tub enclosures with car parking, associated landscaping and gravel pathways including the creation of secondary access. Conversion of store room to form kitchen/office and garage together with landscaping and associated works (Retrospective Application) (Amended plans / information received 5th October 2023)
Home Farm Barn Kencot Oxfordshire
Conversion of Home Farm Barn into a dwelling house/holiday accommodation with alterations to existing access, provision of car parking and associated landscape works.
Stable Block Borde Hill Garden Borde Hill Lane Haywards Heath West Sussex RH16 1XP
Extension and alterations to the existing Stables building to improve and expand the existing restaurant and café/tea house. Partial change of use of Stables from gym to new farm shop/ delicatessen with storage above. Change of use first floor from offices to 4 No. hotel rooms for visitor accommodation and associated parking and landscaping works (Amended plans, Design and Access Addendum, Bat Emergence Survey and Biodiversity Net Gain information received 20 June 2023)
Wellcross Farm Five Oaks Road Slinfold West Sussex
Reserved Matters application pursuant to condition 5 of outline planning permission DC/19/1897 for the provision of Phase 1 of Land at Wellcross Farm to provide a Continuing Care Retirement Community with 47 units of accommodation (C2), communal facilities and new ancillary buildings with access, infrastructure, open space, landscaping and associated works including an onsite borehole water supply.
Barn Off Wandale Lane Great Barugh Malton North Yorkshire
Change of use of agricultural barn to form 1no. one bedroom dwelling for holiday accommodation, the erection of a single storey side extension with timber cladding and associated parking and landscaping
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Condition 7, part discharge (Materials) and Condition 8, part discharge (Construction Environmental Management Plan) of planning permission 17/01878/OUT for a Hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.
Land Off Mottram Old Road Hyde SK14 3BE
Outline application with all matters reserved other than access for the erection of a new residential-led, mixed-use development comprising residential dwellings (up to 2,150), local centres (including up to 1,300 sqm of retail, 1,600 sqm of commercial uses and 1,000 sqm of local community uses), secondary school accommodation, sports facilities, new vehicle, cycle and pedestrian connections, new bridge connection to Hattersley, construction of new site accesses from Mottram Old Road, landscaping, demolition of arm/agricultural buildings and stables, and associated works
Oak Farm Tofts Lane Sheffield S6 5SL
Use of existing properties (Oak Farm and Oak House) as assisted living (Use Class C2) with ancillary facilities including storage, parking and landscaping (retrospective) and erection of side extension to Oak House to provide additional living accommodation