Pine End Works & Land To The North Harbour Road Lydney
A hybrid planning application comprising of all existing structures and their demolition and mixed use development and associated infrastructure and works comprising of fish processing building (20,600m2 B2 use), Building consisting of an eel farm (8,000m2 of B2 use), plus 1,300m2 restaurant/cafe (A3 use) and 700m2 visitor centre (D1 use). Energy centre (800m2 B2 use), storage building (500m2 ancillary to B2 use), Amenity building for HGV drivers (150m2 ancillary to B2 use), Generator building/substations (500m2 ancillary to B2 use), staff accommodation consisting of 3 No. 3 bed dwelling houses, 8 No. 1 bed apartments, 4 No. 2 bed apartments and 18 shared units of accommodation for seasonal staff. New pedestrian, cycle and vehicular accesses onto Harbour road and a network of internal routes. 2 No water treatment lagoons, parking areas for visitors, staff and HGVs. Landscaping and planting and associated development and works. Utilities infrastructure including water supply, foul and surface water sewers and underground tanks, electrical supply (including substations), telecommunications equipment, on site renewable energy and associated works. Outline application (all reserved matters for approval other than external appearance) for the erection of a building containing up to 2,500m2 of A1,A2,A3,A4 and A5 uses. (Revised description.)
Pine End Works & Land To The North Harbour Road Lydney
A hybrid planning application comprising of all existing structures and their demolition and mixed use development and associated infrastructure and works comprising of fish processing building (20,600m2 B2 use), Building consisting of an eel farm (8,000m2 of B2 use), plus 1,300m2 restaurant/cafe (A3 use) and 700m2 visitor centre (D1 use). Energy centre (800m2 B2 use), storage building (500m2 ancillary to B2 use), Amenity building for HGV drivers (150m2 ancillary to B2 use), Generator building/substations (500m2 ancillary to B2 use), staff accommodation consisting of 3 No. 3 bed dwelling houses, 8 No. 1 bed apartments, 4 No. 2 bed apartments and 18 shared units of accommodation for seasonal staff. New pedestrian, cycle and vehicular accesses onto Harbour road and a network of internal routes. 2 No water treatment lagoons, parking areas for visitors, staff and HGVs. Landscaping and planting and associated development and works. Utilities infrastructure including water supply, foul and surface water sewers and underground tanks, electrical supply (including substations), telecommunications equipment, on site renewable energy and associated works. Outline application (all reserved matters for approval other than external appearance) for the erection of a building containing up to 2,500m2 of A1,A2,A3,A4 and A5 uses. (Revised description.)
Adjoining Borough Observations Within Wandsworth
Observations on a proposed development within the adjoining Borough of Wandsworth with respect to "Demolition of existing two storey plant and telecommunications structure and redevelopment of part of the site to provide a 10 storey building (41.8 metres), plus basement, comprising 5,576 sqm of Class E floorspace, including light industrial use at ground floor level, flexible office floorspace to the 9 upper floors, and ancillary facilities, including a communal roof terrace. Erection of roof extension to existing two storey television studio building (BS1) and conversion of existing double height tv studio to create an energy centre serving the existing and proposed buildings and the installation of new plant. The erection of a single storey building comprising a substation, switch room, waste storage and waste compactor. Alterations to existing plant serving an existing five storey building (BS2). Cycle parking, disabled car parking space and public realm improvements, including landscaping and alterations to pedestrian and cycle access.", at: Battersea Studios, 80 Silverthorne Road, SW8 3HE.
Towerlands Panfield Road Braintree Essex CM7 5BJ
Non-Material Amendment to approved application 19/00786/OUT granted 09.04.2021 for: Outline planning application for up to 575 homes together with a 0.13ha site for early years and childcare nursery (D1), Up to 250sqm of local retail (A1) and up to 250sqm of community facilities (D1), green infrastructure including formal/informal open space and amenity space, provision of ecological mitigation area to north-west of developable area, landscaping including woodland and hedgerow planting, new vehicular accesses from the B1053 and Panfield Lane, closure of existing access from Deanery Hill (south), footway and cycleway network, supporting infrastructure (utilities including gas, electricity, water, sewerage, telecommunications (and diversions as necessary), diversion of public right of way, sustainable drainage systems, any necessary demolition and ground remodelling. Amendment would allow for: - Amendment to the wording of the approved Parameter Plan: Development Framework (UNX003/PP/001 rev F) and the Design Code to reflect the use of the upper floors of the Neighbourhood Centre as office space rather than residential use, as proposed by application 22/02084/FUL.
Alma Estate EN3
Details pursuant to ref: 19/03624/VAR: Telecommunications (14), Phase 2A for submission of planning application under Section 73 to amend conditions 2 (approved drawings), 3 (phasing plan), 7 (residential units), 8 (non-residential floorspace) and 52 (car parking provision) of outline planning permission 15/02039/OUT, as amended by 17/04670/VAR, to facilitate minor changes to residential unit numbers from 993 to 1,080, building heights, development zones, non residential floorspace, landscaping and play provision and parking provision in relation to Phases 2A and 4 of the Alma Estate, Enfield,EN3. Submission of Environmental Statement Addendum.
Alma Estate EN3
Details pursuant to ref: 19/03624/VAR: Telecommunications (14), Phase 4, for the submission of planning application under Section 73 to amend conditions 2 (approved drawings), 3 (phasing plan), 7 (residential units), 8 (non-residential floorspace) and 52 (car parking provision) of outline planning permission 15/02039/OUT, as amended by 17/04670/VAR, to facilitate minor changes to residential unit numbers from 993 to 1,080, building heights, development zones, non residential floorspace, landscaping and play provision and parking provision in relation to Phases 2A and 4 of the Alma Estate, Enfield,EN3. Submission of Environmental Statement Addendum.
25-33 Parkhouse Street London Southwark SE5 7TQ
Details of Condition 19 - Details of the Impact on Telecommunications Services as required by planning permission the redevelopment of the site to provide a mixed-use development comprising buildings up to 11 storeys in height and accommodating new homes (Use Class C3) and commercial floorspace (Use Class B1c), car parking, cycle parking and associated landscaping.
Towerlands Panfield Road Braintree Essex CM7 5BJ
Non-Material Amendment to permission 19/00786/OUT granted 09.04.2021 for: Outline planning application for up to 575 homes together with a 0.13ha site for early years and childcare nursery (D1), Up to 250sqm of local retail (A1) and up to 250sqm of community facilities (D1), green infrastructure including formal/informal open space and amenity space, provision of ecological mitigation area to north-west of developable area, landscaping including woodland and hedgerow planting, new vehicular accesses from the B1053 and Panfield Lane, closure of existing access from Deanery Hill (south), footway and cycleway network, supporting infrastructure (utilities including gas, electricity, water, sewerage, telecommunications (and diversions as necessary), diversion of public right of way, sustainable drainage systems, any necessary demolition and ground remodelling. Amendment would allow:-Update to the text of condition 15 to specifically exclude the ecological mitigation area (Phase 0) from the restriction on the commencement of development.
21 Miles Way Thanington Without Kent CT1 3ZE
Non-material amendment to planning permission CA/15/01479/OUT for comprehensive mixed use development comprising: up to 750 residential units, in a mix of sizes, types and tenures; up to 4,000 m2 (gross internal floorspace) of Class B1 floorspace; up to 1,000 m2 (gross internal floorspace) of Class A1 to A5 uses; Primary School; up to 5,000 m2 (gross internal area) of residential institutions, including a building for the Pilgrims Hospices with up to 30 beds and a 60 bed Nursing Home (Class C2); up to 2,000 m2 (gross internal area of Community and Leisure Uses (Classes D1 and D2); Provision of local recycling facilities; Provision of areas of formal and informal open space; Installation of utilities infrastructure to serve the development, including flood attenuation works, surface water attenuation, water supply, waste water facilities, gas supply, electricity supply (including substations), telecommunications infrastructure and renewable energy;Transport infrastructure, including an extended westbound slip road on the A2, accesses onto the Cockering Road plus a network of internal roads, footpaths and cycle routes; New planting and landscaping, both within the Proposed Development and on its boundaries as well as ecological enhancement works; and associated groundworks. All matters except for access are reserved; to allow door to car port.
Towerlands Panfield Road Braintree Essex CM7 5BJ
Non-Material Amendment to permission 19/00786/OUT granted 09.04.2021 for: Outline planning application for up to 575 homes together with a 0.13ha site for early years and childcare nursery (D1), Up to 250sqm of local retail (A1) and up to 250sqm of community facilities (D1), green infrastructure including formal/informal open space and amenity space, provision of ecological mitigation area to north-west of developable area, landscaping including woodland and hedgerow planting, new vehicular accesses from the B1053 and Panfield Lane, closure of existing access from Deanery Hill (south), footway and cycleway network, supporting infrastructure (utilities including gas, electricity, water, sewerage, telecommunications (and diversions as necessary), diversion of public right of way, sustainable drainage systems, any necessary demolition and ground remodelling. Amendment would allow for: Change in parameter plan to reflect the form of development approved for the Parkland Edge - South Character Area.