Pine End Works & Land To The North Harbour Road Lydney
A hybrid planning application comprising of all existing structures and their demolition and mixed use development and associated infrastructure and works comprising of fish processing building (20,600m2 B2 use), Building consisting of an eel farm (8,000m2 of B2 use), plus 1,300m2 restaurant/cafe (A3 use) and 700m2 visitor centre (D1 use). Energy centre (800m2 B2 use), storage building (500m2 ancillary to B2 use), Amenity building for HGV drivers (150m2 ancillary to B2 use), Generator building/substations (500m2 ancillary to B2 use), staff accommodation consisting of 3 No. 3 bed dwelling houses, 8 No. 1 bed apartments, 4 No. 2 bed apartments and 18 shared units of accommodation for seasonal staff. New pedestrian, cycle and vehicular accesses onto Harbour road and a network of internal routes. 2 No water treatment lagoons, parking areas for visitors, staff and HGVs. Landscaping and planting and associated development and works. Utilities infrastructure including water supply, foul and surface water sewers and underground tanks, electrical supply (including substations), telecommunications equipment, on site renewable energy and associated works. Outline application (all reserved matters for approval other than external appearance) for the erection of a building containing up to 2,500m2 of A1,A2,A3,A4 and A5 uses. (Revised description.)
Pine End Works & Land To The North Harbour Road Lydney
A hybrid planning application comprising of all existing structures and their demolition and mixed use development and associated infrastructure and works comprising of fish processing building (20,600m2 B2 use), Building consisting of an eel farm (8,000m2 of B2 use), plus 1,300m2 restaurant/cafe (A3 use) and 700m2 visitor centre (D1 use). Energy centre (800m2 B2 use), storage building (500m2 ancillary to B2 use), Amenity building for HGV drivers (150m2 ancillary to B2 use), Generator building/substations (500m2 ancillary to B2 use), staff accommodation consisting of 3 No. 3 bed dwelling houses, 8 No. 1 bed apartments, 4 No. 2 bed apartments and 18 shared units of accommodation for seasonal staff. New pedestrian, cycle and vehicular accesses onto Harbour road and a network of internal routes. 2 No water treatment lagoons, parking areas for visitors, staff and HGVs. Landscaping and planting and associated development and works. Utilities infrastructure including water supply, foul and surface water sewers and underground tanks, electrical supply (including substations), telecommunications equipment, on site renewable energy and associated works. Outline application (all reserved matters for approval other than external appearance) for the erection of a building containing up to 2,500m2 of A1,A2,A3,A4 and A5 uses. (Revised description.)
Dulwich Hamlet Football Club Edgar Kail Way London SE22 8BD And Neighbouring Artificial Pitch At Greendale
Redevelopment of the Dulwich Hamlet Football (Champion Hill) Stadium, including the demolition of existing buildings, and use of land at Greendale, to provide: - the erection of a new stadium with relocated playing pitch with associated floodlighting and boundary treatment, and part two-part three storey clubhouse building with sports and leisure facilities, with capacity for 4,000 spectators (Use Class D2); - the construction of a multi-functional kickabout space and associated boundary treatment; - the erection of a series of buildings between four and six storeys in height to provide 219 residential dwellings, (Use Class C3); - associated car parking, cycle parking, refuse storage and access road; - the widening and greening of a public route with associated hard and soft landscaping; - the relocation of telecommunications equipment and re-provision of the substation together with plant and equipment.
Land Area 20 Residential Stanton Cross Irthlingborough Road North Wellingborough Northamptonshire
Application for approval of details reserved by condition pursuant to conditions 13 (all public footpath routes through the site shall be protected and/or diverted in accordance with statutory procedures), 22 (a 'soil reuse strategy'), 23 (details of soft landscaped areas), 30 (details of badger appropriate mitigation scheme), 32 (a detailed method statement identifying whether trees have potential for bat roosts), 34 (details of the position of existing landscape features including trees, large shrubs and hedges both within the site and overhanging the site boundary), 35 (Landscape scheme), 36 (a detailed scheme for the future maintenance and management of the proposed amenity and landscape area(s)), 40 (a scheme for noise mitigation measures to protect occupiers of the proposed dwellings from the access roads and/or rail noise), 43 (Lighting strategy), 44 (details of all external materials relating to that specific sub-area), 45 (Surface finishes), 47 (a scheme detailing the foul drainage), 48 (Surface water drainage), 51 (a utilities strategy to set out a programme for the provision of water, gas, and electricity supplies and telecommunications), 52 (details of the strategy for the provision of underground utility services within the sub area) of variation to planning permission WP/15/00605/VAR.
Pine End Works & Land To The North Harbour Road Lydney Gloucestershire GL15 4ER
A hybrid planning application comprising of all existing structures and their demolition and mixed use development and associated infrastructure and works comprising of fish processing building (20,600m2 B2 use), Building consisting of an eel farm (8,000m2 of B2 use), plus 1,300m2 restaurant/cafe (A3 use) and 700m2 visitor centre (D1 use). Energy centre (800m2 B2 use), storage building (500m2 ancillary to B2 use), Amenity building for HGV drivers (150m2 ancillary to B2 use), Generator building/substations (500m2 ancillary to B2 use), staff accommodation consisting of 3 No. 3 bed dwelling houses, 8 No. 1 bed apartments, 4 No. 2 bed apartments and 18 shared units of accommodation for seasonal staff. New pedestrian, cycle and vehicular accesses onto Harbour road and a network of internal routes. 2 No water treatment lagoons, parking areas for visitors, staff and HGVs. Landscaping and planting and associated development and works. Utilities infrastructure including water supply, foul and surface water sewers and underground tanks, electrical supply (including substations), telecommunications equipment, on site renewable energy and associated works. Outline application (all reserved matters for approval other than external appearance) for the erection of a building containing up to 2,500m2 of A1,A2,A3,A4 and A5 uses. (Revised description.)
Pine End Works Land To The North Harbour Road Lydney
A hybrid planning application comprising of all existing structures and their demolition and mixed use development and associated infrastructure and works comprising of fish processing building (20,600m2 B2 use), Building consisting of an eel farm (8,000m2 of B2 use), plus 1,300m2 restaurant/cafe (A3 use) and 700m2 visitor centre (D1 use). Energy centre (800m2 B2 use), storage building (500m2 ancillary to B2 use), Amenity building for HGV drivers (150m2 ancillary to B2 use), Generator building/substations (500m2 ancillary to B2 use), staff accommodation consisting of 3 No. 3 bed dwelling houses, 8 No. 1 bed apartments, 4 No. 2 bed apartments and 18 shared units of accommodation for seasonal staff. New pedestrian, cycle and vehicular accesses onto Harbour road and a network of internal routes. 2 No water treatment lagoons, parking areas for visitors, staff and HGVs. Landscaping and planting and associated development and works. Utilities infrastructure including water supply, foul and surface water sewers and underground tanks, electrical supply (including substations), telecommunications equipment, on site renewable energy and associated works. Outline application (all reserved matters for approval other than external appearance) for the erection of a building containing up to 2,500m2 of A1,A2,A3,A4 and A5 uses. (Revised description.)