57 South Park Gardens Berkhamsted Hertfordshire HP4 1HZ
Details as required by conditions 3 (materials), 4 (Tree report), 5 (Landscaping) , 6 (EV charging point) , 8 , 9, 10, (Acoustic fencing and Noise mitigation), 11 (Construction management plan) attached to planning permission 22/01555/FUL (Construction of six detached houses)
The Poplars 2 Lilian Board Way Greenford UB6 0SB
Details trees, shrubs and hedgerows pursuant to condition 4 of planning permission ref: PP/2014/6582 dated 20/01/2016 for: Redevelopment and single and two storey extensions of C2 hostel, increasing existing building footprint by 327sqm and gross internal floor space by 1,566sqm. Development works to include: formation of Community Hub (Class D2); construction of a second storey; internal configuration; formation of additional 28 self-contained units (total 60 self-contained units and 217 beds up from 85 beds), vehicle and cycle parking, refuse and recycling store, boundary fencing, walling and landscape enhancements (Regulation 3 - Council's own development)
Land At Moor Road Yatton
Request to discharge conditions 4 (Tree protection plan and Arboricultural method statement), 5 (Phasing Plan), 6 (Construction Environmental Management Plan), 7 (Biodiversity Protection Plan), 9 (Sample of materials), 11 (Landscape Ecological Management Plan), 12 (Landscape 'Phasing' Planting Plan), 13 (Landscape Scheme), 21 (Generation of up to 15% energy), 24 (Bird nesting and Bat roosting Strategy), 26 (Travel Plan), 27 (Proposed Fencing), 28 (Orchard Management Plan) and 29 (Proposed Play Area) from application no. 19/P/3197/FUL
Land At Mill Hill North West Industrial Estate Peterlee SR8 2HR
Discharge of Conditions 4 (Construction Management Plan), 5 (Tree Protection Plan), 6 (Details of fencing gates, lighting and finishes of buildings etc) and 7 (Landscaping Scheme) pursuant to Planning Permission No. DM/22/01756/FPA
Site For Community Facilities West Of Parcel H13 Great Oldbury Drive Great Oldbury Gloucestershire
Discharge of Conditions 7 (Fencing for trees), 10 (Landscaping/biodiversity), 13 (Parking) , 21 (Public Transport Infrastructure), 28 (Fire Hydrants), 29 (Highway Management), 32 (Flooding), 37 (Construction Method Statement & Transport Plan), 38 (Construction Environmental Management Plan) of S.14/0810/OUT
Site Of Former 90 Asheridge Road Chesham Buckinghamshire
Approval of conditions 1 (Construction Environment Management Plan), 2(Tree Protection Plan), 3(Site Operatives Parking), 5(Travel Plan Framework), 6(Biodiversity Scheme) and 31(Piling) of planning permission PL/22/0864/VRC - Variation of conditions 2 (Materials), 3 (Floor levels), 4 (Additional floor space), 5 (Fencing), 6 (Parking), 7 (Site operatives and visitors), 8 (Landscaping) and 9 (Noise) of planning permission CH/2008/0629/FA (Redevelopment of site to provide detached building comprising technical services centre, offices, internal plant and I.T facilities, together with detached substation, external plant enclosures, parking, fence surround, closure of three accesses and alterations to one access.)
Frank Banfield Park Chancellors Road London
Non-material amendment to planning permission ref: 2019/03265/FR3 granted 13th May 2022 for the 'Construction of a community garden within Frank Banfield Park, including construction of new part habitat wall boundary to Millie's Nursery, installation of a community store, shelter and accessible toilet, construction of new hard landscape footpaths to connect to existing park path network, installation of new site boundary fencing, internal site fencing, associated hard and soft landscaping.' Amendments to include: Community Garden Building 'Minor adjustment to container building footprint, to two standard containers, including accessible toilet within one of the containers, amendments to the external elevations including door and shutter window positions; Tiny Forest 'Change of native boundary planting to an Earthwatch 'Tiny Forest' specification with native tree planting; Earthworks 'Extended soil capping to area of imported topsoil capping extended to include the Tiny Forest area.
Park And Ride Portway Bristol
Application for the removal of condition 4 (Fence foundation) and variation of condition 7 (List of approved plans and drawings) following grant of planning permission 22/01579/FB for the construction of new access to Portway Park and Ride for non-motorised users. - Revisions to the landscape including the removal of trees.
Land At Grid Reference 398111 195688 Kemble Wick Kemble Gloucestershire
Compliance with Conditions 5 (Traffic Management), 6 (Construction Management), 8 (Access Solar Farm), 13 (Tree Hedgerow Protection), 14 (Arboricultural Method Statement), 20 (Biodiversity Monitoring Strategy) and partial compliance with Condition 21 (Archaeology) of permission 22/04161/FUL - Installation of a solar farm comprising an array of ground mounted solar PV panels with associated infrastructure including housing for inverters, transformers and electrical equipment, a substation compound, fencing, security cameras, access tracks, associated landscaping and cabling for grid route of approx. 7.9 kilometres in length
1 The Spinney Wolverhampton West Midlands WV3 9HE
3, Facing brick to be Weinerberger Apollow Red Multi Roof tiles to be Marley Ashmore Smooth Grey Windows, White uPVC Rainwter goods, White uPVC 4, Landscape details are indicated on drawing no 2242/BR004 7, Protective tree fencing is indicated on drawing no 2241/BR004 8, EV charge point details indiocated on drawing no 2241/BR004 9, Construction Method Statement enclosed