1B Castle Street Southport
Change of use from light industrial premises to two dwellings and the erection of single storey extensions to the side and front elevations including alterations to the existing single storey roof to form a mansard roof with roof windows (Retrospective) (alternative to DC/2016/02348 approved 29 March 2017).
Olivers Yard New Road Barton In Fabis Nottinghamshire
Change of use from agriculture to light industrial including replacement of wall and roof materials with new cladding and blockwork (Retrospective)
Bucks Recycling Ltd Building 214 Hangar 5 Westcott Venture Park Westcott Buckinghamshire HP18 0XB
Change of use of an existing industrial premises at Bucks Recycling Ltd, Unit 214, from a maintenance, storage and repair workshop and to install a biomass boiler into the building as a renewable energy source. There is one 300mm diameter hole cut into the roof for an exhaust chimney stack and three small holes cut into the rear for water pipes (Retrospective).
Interpower International Ltd Outgang Lane Pickering North Yorkshire YO18 7JA
Erection of 2no.adjoining industrial buildings for use as a manufacturing workshop and for storage/distribution with associated parking and loading/unloading areas with solar panels to the roof and connections to existing buildings(Retrospective)
5 Delaware Drive Tongwell Milton Keynes MK15 8HG
Installation of 13 x ventilation flues to roof of existing industrial unit (part retrospective).
Building 8 Bradbourne Drive Tilbrook Milton Keynes MK7 8AT
Change of use of building 8 from B8 (Storage and workshop) to B2 (General Industrial) with ancillary office and meeting space and partial demolition and refurbishment incorporating the creation of a new entrance, the erection of a two storey front extension, recladding of the side elevations and replacement of the existing roof with new metal roof for use as part of the Red Bull Technology Hub (retrospective)
Erlings Works Half Acre Road Denholme Bradford West Yorkshire BD13 3SG
Building operations to reinstate animal by-products process plant and roof mounted solar PV equipment following fire damage, demolition of outrigger extension at rear and shelter roof structures on west side, structural alterations to create extensions to front and west side, replacement and resizing of industrial access doors, installation of concrete wall sections to replace blockwork walls, installation of new wall and roof cladding, re-siting of two silo tanks (retrospective)