1 Station Road Southwold Suffolk IP18 6AX
Discharge of Condition No13 of DC/21/5052/VOC - Variation of Condition Nos 2 and 4 of DC/18/2406/FUL - The demolition of the existing buildings and re-development of the site to create a mixed use development consisting of flexible office space, retail units and residential accommodation - 2: Amendments required to the approved scheme to reflect market changes and to make the scheme viable as an Employment Hub following market testing. 4: Amendment requested to wording of car parking condition to allow for the area of the proposed car parking to have temporary surfacing to allow use as contractors parking for the duration of the contract with the final car park with its final kerbs, finishes, etc to be constructed as part of the construction project and to be ready by completion of the project / before occupation of the building. This to provide a contractors car parking area for the duration of the contract and avoid damage to the final finishes by such use during the construction project. Also, to allow time for co ordination with the proposed larger car parking provision within the site of the 10 spaces related to this development. In addition the 10 spaces are to be provided for the use of the users of the Employment Hub and the users will not be using this until they have occupied the premises so there is no advantage in having the final car park earlier. 2: Condition to be changed to replace list of previously approved drawings with amended drawings as included within this application to reflect amendments to the proposed scheme 4: Amendment requested to wording of car parking condition to allow for the area of the proposed car parking to have temporary surfacing to allow use as contractors parking for the duration of the contract with the final car park with its final kerbs, finishes, etc to be constructed as part of the construction project and to be ready by completion of the project / before occupation of the b - Sustainable Urban Drainage System
Canada Water Masterplan - Land Bounded By Lower Road (West), Redriff Road (South), Quebec Way (East) Surrey Quays Road And Canada Water Dock (North) And Site At Roberts Close London SE16
Partial Discharge of Condition 45 (Archaelogical Reporting) in relation to plot A2 only pursant to planning permission ref no. 18/AP/1604 - Hybrid application seeking detailed planning permission for Phase 1 and outline planning permission for future phases, comprising: Outline planning permission (all matters reserved) for demolition of all existing structures and redevelopment to include a number of tall buildings comprising the following mix of uses: retail (Use Classes A1-A5), workspace (B1), hotel (C1), residential (C3), assisted living (C2), student accommodation, leisure (including a cinema)(D2), community facilities (including health and education uses)(D1), public toilets, nightclub, flexible events space, an energy centre, an interim and permanent petrol filling station, a primary electricity substation, a secondary entrance for Surrey Quays Rail Station, a Park Pavilion, landscaping including open spaces and public realm, works to Canada Water Dock, car parking, means of access, associated infrastructure and highways works, demolition or retention with alterations to the Press Hall and/or Spine Building of the Printworks; and Detailed planning permission for the following Development Plots in Phase 1: Plot A1 (south of Surrey Quays Road and west of Deal Porters Way) to provide uses comprising retail (A1-A5), workspace (B1) and 186 residential units (C3) in a 6 and 34 storey building, plus basement; Plot A2 (east of Lower Road and west of Canada Water Dock) to provide a leisure centre (D2), retail (A1-A5), and workspace (B1) in a 4, 5 and 6 storey building, plus basement; Plot K1 (east of Roberts Close) to provide 79 residential units (C3) in a 5 and 6 storey building; Interim Petrol Filling Station (north of Redriff Road and east of Lower Road) to provide a petrol filling station with kiosk, canopy and forecourt area. Each Development Plot with associated car parking, cycle parking, landscaping, public realm, plant and other relevant works.
13-14 Whitefriargate (Rear) Kingston Upon Hull HU1 2ER
Discharge of condition 3 for approval ref 21/001708/FULL - Change of use of first and second floor from vacant retail office accommodation to three x one bedroom apartments - condition 3
Legal And General Kingswood House St Monicas Road Kingswood Surrey KT20 6EU
Submission of the discharge of all prior to commencement S106 obligations pursuant to S106 of permission 19/01548/F. Redevelopment of the site to create a Continuing Care Retirement Community (Use Class C2), comprising refurbishment and conversion of Legal & General House (Grade II* Listed) to provide 130 no. Assisted Living Units and respite units, Assisted Living support facilities in the rotunda to include a cafe, cinema/theatre and library, creche, ancillary on-site shop/store units at lower ground floor level, a restaurant and wellness centre including refurbishment of the existing swimming pool and car parking internally at lower ground levels, refurbishment and conversion of St Monica's House to provide 19 no. Assisted Living Units, erection of new build accommodation on existing hard-standing/parking areas to provide 131 no. Assisted Living Units, creation of a new access point from St Monica's Road, with associated parking, landscaping and open space including retention of green space on land to the east.
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London N18 3BZ
Details pursuant to ref 19/02718/RE3 PARTIAL DISCHARGE (Plot Z02-01 Phase one) for Impact studies of existing foul, surface and water supply infrastructure (Part A of 64) in respect of the development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to thrdee forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London N18 3BZ
PARTIAL DISCHARGE Details pursuant to Ref: 19/02718/RE3 for Long term monitoring/maintenance plan (18) in respect of the Development of Phase 2 Plot Z02-01 only of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to three forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).
Capital House 42 Weston Street London Southwark SE1 3QD
Details of Condition 43 for partial discharge of six month time limit only'Archaeological Assessment Report' pursuant to planning permission ref. no. 18/AP/0900: Redevelopment of the site to include the demolition of Capital House 42-46 Weston Street SE1 with the erection of a 39-storey building (3 basement levels and ground with mezzanine and 38 storeys) of a maximum height of 137.9m (AOD) to provide up to 905 student accommodation units (Sui Generis use), flexible retail/café/office floorspace (Class A1/A3/B1), cycle parking, servicing, refuse and plant areas, public realm improvements and other associated works incidental to the development. The application is accompanied by an Environmental Statement submitted pursuant to the Town and Country Planning (Environmental Impact Assessment) Regulations 2017.
The Boatyard Bolton Road Hoghton
Application to discharge condition nos. 5 (materials), 6 (construction management plan), 13 (method statement for biosecurity measures), 14 (foul and surface water treatment), 15 (construction environmental management plan), 17 (landscaping scheme), 20 (drainage strategy), 21 (construction surface water management plan), 22 (operation and maintenance manual for surface water drainage), 24 (canal risk assessment and method statement) and 25 (ground contamination) of planning permission ref: 21/01473/FULMAJ (Demolition of the former Grill & Grain Public House and erection of a two storey office building and change of use of the former annex building from ancillary accommodation to commercial use (falling within Use Classes E(a) display or retail sale of goods, other than hot food, E(b) sale of food and drink for consumption (mostly) on the premises, E(c) i financial services, E(c)ii professional services (other than medical services) and/or E(g)i office) with associated car parking, landscaping and works)
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London
Details pursuant to ref: 19/02718/RE3: PARTIAL DISCHARGE for Plot Z02-01 only - Telecommunication/Satellite Strategy (30) for Development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to thrdee forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road)
PARTIAL DISCHARGE PLOT Z02-01 Details pursuant to ref: 19/02718/RE3: Feasibility - Navigation For Transport (79) for plot Z02-01 Development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to three forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).