Search Results

Found 8 planning applications

S.23/2471/LAC | Consultation

Pine End Works & Land To The North Harbour Road Lydney

A hybrid planning application comprising of all existing structures and their demolition and mixed use development and associated infrastructure and works comprising of fish processing building (20,600m2 B2 use), Building consisting of an eel farm (8,000m2 of B2 use), plus 1,300m2 restaurant/cafe (A3 use) and 700m2 visitor centre (D1 use). Energy centre (800m2 B2 use), storage building (500m2 ancillary to B2 use), Amenity building for HGV drivers (150m2 ancillary to B2 use), Generator building/substations (500m2 ancillary to B2 use), staff accommodation consisting of 3 No. 3 bed dwelling houses, 8 No. 1 bed apartments, 4 No. 2 bed apartments and 18 shared units of accommodation for seasonal staff. New pedestrian, cycle and vehicular accesses onto Harbour road and a network of internal routes. 2 No water treatment lagoons, parking areas for visitors, staff and HGVs. Landscaping and planting and associated development and works. Utilities infrastructure including water supply, foul and surface water sewers and underground tanks, electrical supply (including substations), telecommunications equipment, on site renewable energy and associated works. Outline application (all reserved matters for approval other than external appearance) for the erection of a building containing up to 2,500m2 of A1,A2,A3,A4 and A5 uses. (Revised description.)

Local Authority
Stroud District Council
Type
Other (Consultation)
Decision
Approved (No Objections)
Application Received
07/12/2023
Application Validated
07/12/2023
Erection Demolition Development Dwelling Agricultural Landscaping Flat Accommodation Telecommunications
S.23/1578/LAC | Consultation

Pine End Works & Land To The North Harbour Road Lydney

A hybrid planning application comprising of all existing structures and their demolition and mixed use development and associated infrastructure and works comprising of fish processing building (20,600m2 B2 use), Building consisting of an eel farm (8,000m2 of B2 use), plus 1,300m2 restaurant/cafe (A3 use) and 700m2 visitor centre (D1 use). Energy centre (800m2 B2 use), storage building (500m2 ancillary to B2 use), Amenity building for HGV drivers (150m2 ancillary to B2 use), Generator building/substations (500m2 ancillary to B2 use), staff accommodation consisting of 3 No. 3 bed dwelling houses, 8 No. 1 bed apartments, 4 No. 2 bed apartments and 18 shared units of accommodation for seasonal staff. New pedestrian, cycle and vehicular accesses onto Harbour road and a network of internal routes. 2 No water treatment lagoons, parking areas for visitors, staff and HGVs. Landscaping and planting and associated development and works. Utilities infrastructure including water supply, foul and surface water sewers and underground tanks, electrical supply (including substations), telecommunications equipment, on site renewable energy and associated works. Outline application (all reserved matters for approval other than external appearance) for the erection of a building containing up to 2,500m2 of A1,A2,A3,A4 and A5 uses. (Revised description.)

Local Authority
Stroud District Council
Type
Other (Consultation)
Decision
Approved (No Objections)
Application Received
03/08/2023
Application Validated
03/08/2023
Erection Demolition Development Dwelling Agricultural Landscaping Flat Accommodation Telecommunications
CA/23/00395 | Conservation Area Notice

Great Bossingham Farmhouse Manns Hill Bossingham Canterbury Kent CT4 6EB

T1 - Willow, reduce height and crown to top of trunk removing all branches and leaving approximate tree height of 18ft. Reasons- to reduce sway of trunk and improve health of tree. Tree is oversized for location close to domestic dwellings and overhanging telecommunications line. Tree located to rear side boundary.

Local Authority
Canterbury City Council
Type
Other (Conservation Area Notice)
Decision
Approved (NO OBJECTION)
Application Validated
08/03/2023
Dwelling Trees Boundary Telecommunications
19/AP/1867 | Major application

Dulwich Hamlet Football Club Edgar Kail Way London SE22 8BD And Neighbouring Artificial Pitch At Greendale

Redevelopment of the Dulwich Hamlet Football (Champion Hill) Stadium, including the demolition of existing buildings, and use of land at Greendale, to provide: - the erection of a new stadium with relocated playing pitch with associated floodlighting and boundary treatment, and part two-part three storey clubhouse building with sports and leisure facilities, with capacity for 4,000 spectators (Use Class D2); - the construction of a multi-functional kickabout space and associated boundary treatment; - the erection of a series of buildings between four and six storeys in height to provide 219 residential dwellings, (Use Class C3); - associated car parking, cycle parking, refuse storage and access road; - the widening and greening of a public route with associated hard and soft landscaping; - the relocation of telecommunications equipment and re-provision of the substation together with plant and equipment.

Local Authority
Southwark Council
Type
Other (Major application)
Decision
Approved (Major - GRANTED)
Application Received
18/06/2019
Application Validated
12/07/2019
Erection Demolition Construction Dwelling Landscaping Residential Boundary Telecommunications
NW/21/00818/CND | Condition(s) Discharge

Land Area 20 Residential Stanton Cross Irthlingborough Road North Wellingborough Northamptonshire

Application for approval of details reserved by condition pursuant to conditions 13 (all public footpath routes through the site shall be protected and/or diverted in accordance with statutory procedures), 22 (a 'soil reuse strategy'), 23 (details of soft landscaped areas), 30 (details of badger appropriate mitigation scheme), 32 (a detailed method statement identifying whether trees have potential for bat roosts), 34 (details of the position of existing landscape features including trees, large shrubs and hedges both within the site and overhanging the site boundary), 35 (Landscape scheme), 36 (a detailed scheme for the future maintenance and management of the proposed amenity and landscape area(s)), 40 (a scheme for noise mitigation measures to protect occupiers of the proposed dwellings from the access roads and/or rail noise), 43 (Lighting strategy), 44 (details of all external materials relating to that specific sub-area), 45 (Surface finishes), 47 (a scheme detailing the foul drainage), 48 (Surface water drainage), 51 (a utilities strategy to set out a programme for the provision of water, gas, and electricity supplies and telecommunications), 52 (details of the strategy for the provision of underground utility services within the sub area) of variation to planning permission WP/15/00605/VAR.

Local Authority
Wellingborough Borough Council
Type
Approval (Discharge) of conditions (Condition(s) Discharge)
Decision
(Discharged Part)
Application Received
21/09/2021
Application Validated
21/09/2021
Variation Dwelling Landscaping Trees Boundary Telecommunications
P0688/19/OUT | Outline Application

Pine End Works & Land To The North Harbour Road Lydney Gloucestershire GL15 4ER

A hybrid planning application comprising of all existing structures and their demolition and mixed use development and associated infrastructure and works comprising of fish processing building (20,600m2 B2 use), Building consisting of an eel farm (8,000m2 of B2 use), plus 1,300m2 restaurant/cafe (A3 use) and 700m2 visitor centre (D1 use). Energy centre (800m2 B2 use), storage building (500m2 ancillary to B2 use), Amenity building for HGV drivers (150m2 ancillary to B2 use), Generator building/substations (500m2 ancillary to B2 use), staff accommodation consisting of 3 No. 3 bed dwelling houses, 8 No. 1 bed apartments, 4 No. 2 bed apartments and 18 shared units of accommodation for seasonal staff. New pedestrian, cycle and vehicular accesses onto Harbour road and a network of internal routes. 2 No water treatment lagoons, parking areas for visitors, staff and HGVs. Landscaping and planting and associated development and works. Utilities infrastructure including water supply, foul and surface water sewers and underground tanks, electrical supply (including substations), telecommunications equipment, on site renewable energy and associated works. Outline application (all reserved matters for approval other than external appearance) for the erection of a building containing up to 2,500m2 of A1,A2,A3,A4 and A5 uses. (Revised description.)

Local Authority
Forest of Dean District Council
Type
Outline planning consent (Outline Application)
Decision
Approved (Granted Permission)
Application Received
30/04/2019
Application Validated
09/05/2019
Erection Demolition Development Dwelling Agricultural Landscaping Flat Accommodation Telecommunications
205162CND | Discharge Condition

Land Adjacent To Whitton Avenue West Greenford UB6 0DR

Details of certificate declaring full conformity with the requirements of the radio frequency guide levels by the International Commission on Non-Ionizing Radiation Protection (ICNIRP) for public radiation exposure at potentially exposed dwellings, workplaces and schools pursuant to condition 4 of planning permission Ref: 201274FUL dated 24.09.2020 for: 'Installation of 20m high telecommunications monopole incorporating 12 apertures; and 7 ancillary equipment cabinets; following removal of existing telecommunications monopole and associated cabinets'

Local Authority
Ealing Council
Type
Approval (Discharge) of conditions (Discharge Condition)
Decision
Approved (Approved)
Application Received
16/12/2020
Application Validated
16/12/2020
Dwelling Telecommunications
S.20/1373/LAC | Consultation to Local Authority -Not CM

Pine End Works Land To The North Harbour Road Lydney

A hybrid planning application comprising of all existing structures and their demolition and mixed use development and associated infrastructure and works comprising of fish processing building (20,600m2 B2 use), Building consisting of an eel farm (8,000m2 of B2 use), plus 1,300m2 restaurant/cafe (A3 use) and 700m2 visitor centre (D1 use). Energy centre (800m2 B2 use), storage building (500m2 ancillary to B2 use), Amenity building for HGV drivers (150m2 ancillary to B2 use), Generator building/substations (500m2 ancillary to B2 use), staff accommodation consisting of 3 No. 3 bed dwelling houses, 8 No. 1 bed apartments, 4 No. 2 bed apartments and 18 shared units of accommodation for seasonal staff. New pedestrian, cycle and vehicular accesses onto Harbour road and a network of internal routes. 2 No water treatment lagoons, parking areas for visitors, staff and HGVs. Landscaping and planting and associated development and works. Utilities infrastructure including water supply, foul and surface water sewers and underground tanks, electrical supply (including substations), telecommunications equipment, on site renewable energy and associated works. Outline application (all reserved matters for approval other than external appearance) for the erection of a building containing up to 2,500m2 of A1,A2,A3,A4 and A5 uses. (Revised description.)

Local Authority
Stroud District Council
Type
Other (Consultation to Local Authority -Not CM)
Decision
Approved (No Objections)
Application Received
07/07/2020
Application Validated
07/07/2020
Erection Demolition Development Dwelling Agricultural Landscaping Flat Accommodation Telecommunications