Towerlands Panfield Road Braintree Essex CM7 5BJ
Non-Material Amendment to approved application 19/00786/OUT granted 09.04.2021 for: Outline planning application for up to 575 homes together with a 0.13ha site for early years and childcare nursery (D1), Up to 250sqm of local retail (A1) and up to 250sqm of community facilities (D1), green infrastructure including formal/informal open space and amenity space, provision of ecological mitigation area to north-west of developable area, landscaping including woodland and hedgerow planting, new vehicular accesses from the B1053 and Panfield Lane, closure of existing access from Deanery Hill (south), footway and cycleway network, supporting infrastructure (utilities including gas, electricity, water, sewerage, telecommunications (and diversions as necessary), diversion of public right of way, sustainable drainage systems, any necessary demolition and ground remodelling. Amendment would allow for: - Amendment to the wording of the approved Parameter Plan: Development Framework (UNX003/PP/001 rev F) and the Design Code to reflect the use of the upper floors of the Neighbourhood Centre as office space rather than residential use, as proposed by application 22/02084/FUL.
Towerlands Panfield Road Braintree Essex CM7 5BJ
Non-Material Amendment to permission 19/00786/OUT granted 09.04.2021 for: Outline planning application for up to 575 homes together with a 0.13ha site for early years and childcare nursery (D1), Up to 250sqm of local retail (A1) and up to 250sqm of community facilities (D1), green infrastructure including formal/informal open space and amenity space, provision of ecological mitigation area to north-west of developable area, landscaping including woodland and hedgerow planting, new vehicular accesses from the B1053 and Panfield Lane, closure of existing access from Deanery Hill (south), footway and cycleway network, supporting infrastructure (utilities including gas, electricity, water, sewerage, telecommunications (and diversions as necessary), diversion of public right of way, sustainable drainage systems, any necessary demolition and ground remodelling. Amendment would allow:-Update to the text of condition 15 to specifically exclude the ecological mitigation area (Phase 0) from the restriction on the commencement of development.
Towerlands Panfield Road Braintree Essex CM7 5BJ
Non-Material Amendment to permission 19/00786/OUT granted 09.04.2021 for: Outline planning application for up to 575 homes together with a 0.13ha site for early years and childcare nursery (D1), Up to 250sqm of local retail (A1) and up to 250sqm of community facilities (D1), green infrastructure including formal/informal open space and amenity space, provision of ecological mitigation area to north-west of developable area, landscaping including woodland and hedgerow planting, new vehicular accesses from the B1053 and Panfield Lane, closure of existing access from Deanery Hill (south), footway and cycleway network, supporting infrastructure (utilities including gas, electricity, water, sewerage, telecommunications (and diversions as necessary), diversion of public right of way, sustainable drainage systems, any necessary demolition and ground remodelling. Amendment would allow for: Change in parameter plan to reflect the form of development approved for the Parkland Edge - South Character Area.
Willowbridge Lane (Land At) Castleford WF10 5NW
Non material amendment to approved planning application 19/00308/FUL dated 05.04.2019 (for the removal of existing 3no antennas & 3no Remote Radio Masts and replacement with the installation of 6no antennas, 15no Remote Radio Units Installation of 1no GPS Module, 6no Combiners and Ancillary Development Thread) relating to smaller antennas and the removal of dishes from the telecommunications infrastructure.
Hollinghurst Farm Green Lane Netherton Wakefield WF4 4EU
Non-material amendment to approved application 20/00606/FUL dated 21/07/2020 [for the replacement of existing 15m high mast with 25m mast, 12no. antennas, 2no. additional dishes and upgraded ancillary equipment together with ancillary development at the telecommunications facility] to increase the width of the base by 0.5m, to reconfigure the antenna/dish arrangement, to reduce the headframe height and width and to install 2no. small GPS antenna on the top of the antenna support poles