37 - 39 King Street Southall UB2 4DQ
Construction of five additional floors onto existing ground floor retail unit to provide total of twenty-five self-contained apartments (1 x 1 bed and 4 x 2 bed per each floor); associated internal and external alterations to ground floor retail unit (part to be retained) to facilitate entrance and staircase access to flats above, and integrated cycle space and refuse storage (Outline Planning Application - Details of Access, Appearance, Layout and Scale considered; with Landscaping as Reserved Matters)
16 Fairfield Road Ossett Wakefield WF5 0TF
Outline planning permission for 1no. detached dwelling an associated access. Construction of new garage to existing dwelling and alterations to accommodate new access (all matters reserved).
168A Du Cane Road London W12 0TX
Submission of details of detailed drawings of plan, section and elevation drawings (at a scale of 1:20) of external hard surfacing, paving, ramp and railings pursuant to condition 3; Construction Logistics Plan pursuant to condition 4; detailed drawings of plan, section and elevation drawings (at a scale of 1:20) of a typical bay (including details of panelling, entrances, canopies and brise soleil) pursuant to condition 6; Details of external materials to be used in the development (including details of panelling, glazing, framing, canopies and brise soleil, external access ramp and roofing material) pursuant to condition 7; Ventilation Strategy Report pursuant to condition 13; final Sustainable Drainage System pursuant to condition 21; details of temporary alterations to the brick boundary wall and front boundary railings (including method statement) pursuant to Condition 23 of planning permission ref: 2021/02282/FUL granted 14th December 2021.
264 Northfield Avenue Ealing W5 4UB
Change of Use from hostel (Sui Generis) to Hotel (Class C1), construction of four-storey side extension (including existing stair core enlargement); construction of four storey rear extension; enlargement to the existing fourth floor; construction of additional storey (fifth floor); internal alterations all to provide an additional 37 rooms to hotel (Use Class C1)(total 96 bedrooms); installation of canopy to main front entrance; alterations to front, rear, side fenestrations; external materials upgrade to existing front facade (Outline Planning Application - Details of Access, Landscaping, layout and scale sought only, with Appearance as matter reserved).
121 Elmers End Road Beckenham BR3 4SY
Construction of roof extension/alteration to No. 121 Elmers End Road to provide enlarged roof space in conjunction with existing flat, construction of part one/part three storey infill extension to No. 123 (with dormer projections to front and rear) to provide ground floor commercial space and three upper storeys of residential accommodation. Parking spaces at front and rear and cycle and refuse storage. (OUTLINE APPLICATION - IN RESPECT OF APPEARANCE AND SCALE OF PROPOSED DEVELOPMENT)
121 Elmers End Road Beckenham BR3 4SY
Construction of roof extension/alteration to No. 121 Elmers End Road to provide enlarged roof space in conjunction with existing flat, construction of part one/part three storey infill extension to No. 123 (with dormer projections to front and rear) to provide ground floor commercial space and three upper storeys of residential accommodation (3 no. flats), partial demolition of No. 125 Elmers End Road and construction of part one/part three storey side/rear extension with accommodation in roof space and front, side and rear dormers to provide enlarged ground floor commercial space and 3 no. flats above. Parking spaces at front and rear and cycle and refuse storage. (OUTLINE APPLICATION - IN RESPECT OF ACCESS, APPEARANCE, LAYOUT AND SCALE OF PROPOSED DEVELOPMENT)
North Westgate Development Area Westgate Peterborough
Comprehensive redevelopment for a mixed use scheme to include the demolition of existing buildings and structures, the construction of new buildings and structures, the stopping up, diversion and alteration of public highways and the internal and external alteration and change of use of buildings and structures to be retained on site to provide: (i) retail uses (Classes A1, A2, A3, A4 and A5), offices (Class B1), residential (Class C3), community uses (Class D1) and leisure uses including a cinema (Class D2) to the east of Bourges Boulevard;(ii) hotel (Class C1), offices (Class B1) or residential (Class C3) to the west of Bourges Boulevard; together with ancillary and associated development, pedestrian circulation and car parking (including two new multi-storey car parks), vehicular access, servicing facilities, highway works, plant and machinery, landscaping, a new bus lay over and bus station incorporating 19 stands, bus station facilities and all necessary enabling works
West Lodge Hammersmith Cemetery Margravine Road London W6 8HA
Variation of conditions 2 (approved drawings), 14 (demolition drawings) and 17 (doors and windows materials) of planning permission ref: 2019/00419/VAR granted 9th April 2019 for the 'Variation of condition 2 (approved drawings); and variation of condition 17 (doors and windows materials) of planning permission ref: 2016/00713/VAR granted 13th April 2016 to allow the lower ground floor windows to be aluminium framed, and replacement of a window at lower ground and a window at ground floor level in the north east elevation to be replaced with doors and windows.' Amendments sought are alterations to the south elevation to ensure symmetry from Margravine Road and better retain the existing form of this elevation's roof line, alterations to external steps, replace demolition plans to enable buildability of the loft and internal wall arrangements, alter the wording of condition 17 to read as follows 'The new and replaced doors and window frames hereby approved shall be timber frame construction, with the exception of the lower ground and ground floor doors with four vertical panes only in the north east elevation which shall be either timber or aluminium framed.'
168A Du Cane Road London W12 0TX
Submission of details of detailed drawings of plan, section and elevation drawings (at a scale of 1:20) of external hard surfacing, paving, ramp and railings pursuant to condition 3; Construction Logistics Plan pursuant to condition 4; detailed drawings of plan, section and elevation drawings (at a scale of 1:20) of a typical bay (including details of panelling, entrances, canopies and brise soleil) pursuant to condition 6; Details of external materials to be used in the development (including details of panelling, glazing, framing, canopies and brise soleil, external access ramp and roofing material) pursuant to condition 7; Ventilation Strategy Report pursuant to condition 13; final Sustainable Drainage System pursuant to condition 21; details of temporary alterations to the brick boundary wall and front boundary railings (including method statement) pursuant to Condition 23 of planning permission ref: 2021/02282/FUL granted 14th December 2021.
853 - 857 Harrow Road London NW10 5NH
Removal of condition 19 (Construction Logistics Plan), condition 20 (Construction Management Plan), conditions 28, 29, 30 and 31 (Contamination), condition 35 (Ventilation Strategy) and condition 36 (Air Quality Dust Management Plan) of planning permission ref: 2020/02652/VAR granted 17th June 2021 for the 'Variation of planning permission ref: 2019/01718/VAR granted 27th August 2020, to include: Variation of condition 2 (drawings) to allow: installation of new windows to rear elevation at ground floor level; alterations to approved windows to the rear elevation at first & second floor levels; removal of precast surround to windows at first and second floor level to the front elevation to match street scene; installation of new windows to rear and west elevation at first floor level, and relocation of approved window to east elevation at first floor level; replacement of approved velux rooflight with a dormer window at third floor (roof) level to west elevation; installation of 2no. additional velux rooflights to front elevation, 2no. additional rooflights on top of the main roof and 1no additional rooflight to roof at second floor level; alterations to approved external fire escape; internal alterations to include provide 1no. additional room at third floor level, changes to the stairs and removal of internal lightwell from first to third floor level, alterations to the layout of the commercial refuse space, and additional cycle storage at ground floor level; and Variation to Condition 43 (Student rooms) to include 1no. additional student room.'