Land North Of College Farm Green Lane Clapham Bedfordshire
Construction and operation of a solar photovoltaic farm including fencing, internal service tracks, inverters, transformer stations, cabling, CCTV, landscaping, substations and ancillary cabins, including variation of approved plans condition 1 attached to 22/01581/MAF, to allow for exclusion of solar panels from an area of significant archaeological interest and relocation to the southern extent of the panel deployment area, use of a ground intrusive panel frame mounting system to replace the approved sleeper system with all cables to be buried underground and removal of the maximum 10 work personnel on site, as referred to in the approved Planning Statement.
Darenth Grange Darenth Hill Darenth Kent DA2 7QR
Change of use of the former care home (Use Class C2) to a mixed use comprising residential accommodation for employees of Vineyard Farms Ltd as well as for a residential training centre for the same persons. Erection of a new screening wall to the front of the property, new fence and gate to the rear, formalised parking areas and pedestrian routes. (Variation of conditions 1 and 2 of planning permission DA/22/01274/FUL in relation to the provision of an acoustic fence in lieu of a screening wall.)
Axe View Solar Farm Wadbrook EX13 7AS
Installation of ground mounted photovoltaic solar arrays with transformer stations; internal access track; biodiversity enhancement; landscaping; fencing; security measures; access gate; and ancillary infrastructure (without complying with conditions 1 and 12 of planning permission 20/2551/VAR to amend the approved landscaping details for the operational solar farm)
Land At Thrift Farm Moulsham Thrift Chelmsford Essex
Variation of Condition 10 to approved planning application 20/00688/FUL (Conversion of former agricultural buildings to one residential unit, single storey extension, demolition of existing storage buildings with associated parking and landscaping and the installation of a new gate and fence. hard surfacing and alterations to access road) to remove access road from mitigation strategy.
Five Oaks Farm Haven Road Five Oaks West Sussex
Amendment of Condition 2 of previously approved application DC/11/0090 (Installation of a solar farm with a power capacity of up to 5MWp, comprising the installation of photovoltaic panels, associated boundary fencing, security and CCTV cameras, landscape planting, site access and associated electrical infrastructure - including 4 No. inverter units and a transformer compound) Relating to the extension of planning permission to 2062.
The Old Dairy Pastures View Stockerston Road Blaston Leicestershire LE16 8DF
Conversion of agricultural buildings to a dwelling, including single storey extension (Variation of Condition 2 (Approved Plans) of 20/01978/FUL (Plot 3) for the installation of two air source heat pumps with fence screening and a change of an external door to a window - part retrospective)
Stowbridge Farm Green End Stretham CB6 3LF
To vary Conditions 1 (Approved drawings) and 6 (Landscape details) of decision 14/00839/ESF dated 11/11/2014 for the construction of a Solar Farm, to include PV Panels and supports, transformers/inverters, monitoring equipment, security fencing/CCTV, landscaping and ancillary works
Field At Grid Reference 504139 456454 Back Lane Skerne East Riding Of Yorkshire YO25 8NQ
Variation of conditions 3 (approved plans) and 9 (cable route) of planning permission 20/01962/STPLF (Installation and operation of a solar farm with associated infrastructure, including photovoltaic panels, mounting frames, transformers/inverters, substation, access tracks, pole mounted CCTV cameras and fencing)
Land Part OS 7880 Mowsley Lane Laughton Leicestershire
Change of use of agricultural land and the erection of two timber cabins for short-term holiday lets with associated post and rail fencing and car parking (Variation of Condition 7 (permitted plans) of 19/01370/FUL to amend design and location of cabins)
Land North Of And Including The Baulk Clapham Bedfordshire
Construction and operation of a solar photovoltaic farm including improvements to site access, fencing, inverter and transformer stations, cabling, CCTV, landscaping and substations, including variation of condition 3 attached to 14/01789/MAF, to extend the potential lifetime of the solar farm to 50 years from grid connection date.