The Friary Carmelite Way Maldon Essex CM9 5FJ
Compliance with conditions notification 17/00764/LBC (Residential redevelopment for 28 dwellings comprising conversion of listed building to 7 apartments, demolition of unsympathetic 1960s extension and replacement with 2 townhouses, construction of new build development within the grounds to the south comprising 19 apartments, hard and soft landscaping and associated parking and infrastructure.) Condition 2 - Demolition Method Statement, 7 - Glazed Screens and 8 - Boundary Wall
Waterbeach Barracks, Key Phase 1 East Denny End Road Waterbeach Cambridge Cambridgeshire CB25 9PA
Reserved matters application for approval of appearance, landscape, layout and scale in respect of strategic green, grey and blue infrastructure, ground remodelling and associated works at Key Phase 1 of the Waterbeach Barracks and Airfield development (Ref: S/0559/17/OL), comprising: internal primary, secondary and tertiary streets, junctions and turning heads (including temporary bus turning area), land reprofiling (including creation of a landscaped bund), utilities infrastructure (including alignment of service runs and location of substations), foul and surface water drainage infrastructure (including pumping station and connection to existing ditch course), street lighting, areas of common or strategic green infrastructure, open space and public realm (including ecological mitigation, planting, productive landscape, footways / cycleways and necessary bridge structures), lighting, boundary treatments, sustainable drainage features, street furniture, allotments (including parking and temporary access), any necessary temporary stockpiling of construction materials, areas for construction use, temporary haul routes and any necessary demolition.
Waterbeach Barracks Key Phase 1 Lake Spur Denny End Road Waterbeach Cambridgeshire
Approval of access, appearance, landscape, layout and scale in respect of strategic green, grey and blue infrastructure, ground remodelling and associated works at Key Phase 1 of the Waterbeach Barracks and Airfield development (Ref: S/0559/17/OL), comprising: internal primary, secondary and tertiary streets, parcel access junctions, land reprofiling, utilities infrastructure including alignment of service runs, foul and surface water drainage infrastructure, street lighting, areas of common or strategic green infrastructure, open space and public realm including ecological mitigation, soft and hard landscaping, planting, productive landscape, footways / cycleways and necessary bridge structures, lighting, boundary treatments, sustainable drainage features, street furniture, any necessary temporary stockpiling of construction materials, areas for construction use, temporary haul routes and any necessary demolition.
Clayton Hospital Northgate Wakefield WF1 3JS
Reserved matters for Enabling Phase (retention and making good of pavilion building, demolition of remaining hospital buildings, main boulevard and associated hard and soft landscaping, boundary treatment, car parking, Muti Use Games Area and laying of development plots to seed) relating to Access, Appearance, Landscaping, Layout and Scale pursuant to outline approval 16/00798/OUT