Bairstow Eves 20 High Street Maldon Essex CM9 5PJ
Compliance with conditions notification of application 23/00464/VAR (Variation of condition 2 on approved planning permission 21/01064/FUL (Refurbishment and extension of historic high street building to create ground floor work unit (Use Class E), 1 bedroom ground floor flat and 2 no. 1 bedroom first floor flats.). Condition 5 - Timber frame walls/ roof repair and installation.
Bairstow Eves 20 High Street Maldon Essex CM9 5PJ
Compliance with conditions notification 23/00464/VAR (Variation of condition 2 on approved planning permission 21/01064/FUL (Refurbishment and extension of historic high street building to create ground floor work unit (Use Class E), 1 bedroom ground floor flat and 2 no. 1 bedroom first floor flats.)) Condition 3 - Shopfront, windows & doors plans. Condtion 4 - Extraction/ventilation details. Condition 5 - Timber walls & roof repair/instulation details. Condition 6 - External plastering specification. Condition 7 - High quality photographs of the tile. Condition 8 - Cast metal rainwater goods. Condition 9 - Painted timber external joinery. Condition 10 - Archaeological assessment. Conditon 11 - Archaeological building recording. Condition 12 - Storage of building materials. Condition 13 - Residential Travel Information Pack for sustainable transport. Condition 14 - Cycle parking facilities. Condition 16 - Surface water drainage scheme. Condition 17 - Foul drainage scheme.
65 Chapel Lane High Wycombe Buckinghamshire HP12 4BS
Submission of details of landscaping pursuant to outline permission 20/06916/OUT varied under variation of condition application 21/08537/VCDN (Variation of condition 3 (plans) attached to outline planning permission 20/06916/OUT (Outline application (including details of access, appearance, layout and scale) for demolition of existing semi detached properties and construction of apartment comprising 6 x residential units, construction of 1 x detached dwelling and associated parking with details of landscaping matters reserved) to allow for amendment to detached property and car parking layout)
Leisure Caravan Site Goldhanger Road Heybridge Maldon Essex CM9 4RA
Discharge of conditions notification FUL/MAL/20/01216 (Removal of condition 5 and variation of conditions 2 and 6 on approved planning application 19/01164/FUL (Demolition of existing and erection of a replacement public house (class A4), with a first-floor apartment, and change of use of land for the siting of 12 holiday lodge caravans.) Condition 23 - Drainage Maintenance Plan
Site R4 Local Centre W North Niort Way Wellingborough
Reserved matters application pursuant variation to planning permission reference WP/16/00271/VAR, specifically conditions 4 (a) (the layout, scale, appearance); 4 (b) vehicle, cycle and foot 4 (d) layout and design of public open space; 4A (a) layout, design and specification of drainage infrastructure; 4 (A) (b) (detailed survey of existing ground level, details of proposed alterations to existing ground levels, the final ground level of the development and finished floor levels of buildings) 4A (c) waste management facilities strategy and waste audit, including arrangements for the provision of waste collection receptacles; 6 (accordance with the planning application development framework plan); 10 (structural landscape scheme); 19 (foul water drainage); 20 (surface water drainage); 23 (sustainability statement/assessment), for proposed local centre, comprising 1,705m2 of Use Class E (a) E (b) and E (c) (i), E (c) (ii) and E (c) (iii) / sui generis (takeaway and drive thru) and 6 no. apartments of Use Class C3, with associated parking, landscape works, at Glenvale Park (Wellingborough North) (Amended Description)
New Site At Former Mill Beach Goldhanger Road Heybridge Essex
Compliance with conditions notification 20/01216/FUL (Removal of condition 5 and variation of conditions 2 and 6 on approved planning application 19/01164/FUL (Demolition of existing and erection of a replacement public house (class A4), with a first-floor apartment, and change of use of land for the siting of 12 holiday lodge caravans.) Condition 22 - Surface Water Drainage Condition 33- External Lighting
Central Garage Lampits Hill Corringham Essex SS17 9AA
Application for the approval of reserved matters (landscaping) for the grant of outline planning permission ref. 21/01320/CV Application for the variation of condition no. 4 (approved plans) of planning permission ref. 20/00564/OUT (Outline planning application for demolition of the former car showroom and petrol station and the erection of a new 3 storey block containing 16 flats (8 no. 1 bed and 8 no. 2 bed) with associated car parking, cycle parking and refuse storage. To include determina...
Milestone House London Road Fairford Gloucestershire GL7 4DS
Variation of condition 2 (approved plan numbers) re permission 12/05034/REM - Reserved Matters application for the erection of 63 apartments and 18 units including details of appearance and landscaping pursuant to Outline permission (ref. 09/00872/OUT)
Mill Beach Public House Goldhanger Road Heybridge Essex CM9 4RA
Compliance with conditions notification 20/01216/FUL (Removal of condition 5 and variation of conditions 2 and 6 on approved planning application 19/01164/FUL (Demolition of existing and erection of a replacement public house (class A4), with a first-floor apartment, and change of use of land for the siting of 12 holiday lodge caravans.)) Condition 9 - Hard & soft landscape works. Condition 10 - Refuse storage.
Alma Estate EN3
Details pursuant to condition 5 of outline planning permission ref: 15/2039/OUT and as amended by 17/04670/VAR, and proposed variation by 19/03624/VAR in respect of layout, scale, appearance, access, landscaping in relation to Phases 2A and 4 of Alma Estate for the construction of 3 apartment buildings and 13 houses varying between 3 and 7 storeys in height, comprising 303 residential units in total, Class A1 retail units uses and provision of public open space, private and semi-private amenity space, refuse/recycling and bicycle storage, on and off street car parking together with conditions for tree protection (9), ecology and biodiversity strategy (31), drainage strategy (35), green roofs (36), living walls (37), energy strategy (38), green procurement plan (43), SWMP (44), parking (52), loading/unloading (54), delivery and servicing (57), car park management (58), traffic calming (59), cycle parking (60).