Land Off Tenford Lane, Tenford Lane, Tean, Staffordshire,
Variation of Condition 1 relating to SMD/2021/0491 to allow following amendments: 1. The introduction of 2 new house types (bungalows) on plots 31-40, across the frontage of the site 2. Adjustment of the levels of the road 3. The relocation of plot 38 4. Reallocation of the land between plots 38 and 37 as public open space 5. Introduction of an attached garage on house type A 6. Removal of 1no. dormer on house type B 7. Rearrangement of plots 13, 14 and 17 8. The roof pitches on House types A,C,D,E,F & G have been dropped from 35 degrees to 30 9. House types B & C have changed from 3 beds to 4 Beds 10. Raised timber deckings have been added to the rear of the bungalows on plots 32 - 40 11. Some bungalows have been handed to facilitate vehicular access 12. Plots 18 and 23 & 24 have been swapped around 13. Addition of an ensuite above the porch on House Type C 14. Driveway alterations on plots 2 - 5 15. The 2 roads to the north of the site have been made private
Land East Of Limestone Grove Burniston Scarborough North Yorkshire
Variation of condition 1 on decision reference 21/02845/RM dated 13/05/2022 for Approval of reserved matters in relation to outline planning application 20/00394/OL for new housing development (incorporating footpaths/service strips to front of plots 5 and 6) to allow alterations to layout to house type 3 and private access
Land Field Head Road Laceby North East Lincolnshire DN37 7SS
Variation of Condition 1 (Approved Plans) of DM/0692/22/REM to amend the layout and house types for plots 19 to 29, remove northern buffer zone and Removal of Condition 9 (Air Quality Report).
Mount Shell Farmhouse Langford Road Wickham Bishops Witham Essex CM8 3JG
Compliance with conditions notification 22/01110/VAR (Variation of condition 2 on approved planning permission 22/00883/HOUSE (Partial demolition of existing dwelling with erection of two storey extension with retention of remaining dwelling as annexe accommodation and extensions to existing garage)) Condition 5 - Hard and soft landscaping
Scartho Top Matthew Telford Park Grimsby North East Lincolnshire
Variation of Condition 1 (Approved Plans) pursuant to DM/0110/22/REM to amend house types and alterations to site layout to provide additional parking on phase 5 only.
Land Field Head Road Laceby North East Lincolnshire DN37 7SS
Variation of Condition 1 (Approved Plans) following DM/0522/21/REM to amend house types on various plots
Land North Of Main Road (Plot 5 - Kings Chase) Barnoldby Le Beck North East Lincolnshire
Variation of Condition 1 (Approved Plans) following DM/1103/17/REM to amend position, design and layout of detached house and include a detached garage/home office - Plot 5 only
Leisure Caravan Site Goldhanger Road Heybridge Maldon Essex CM9 4RA
Discharge of conditions notification FUL/MAL/20/01216 (Removal of condition 5 and variation of conditions 2 and 6 on approved planning application 19/01164/FUL (Demolition of existing and erection of a replacement public house (class A4), with a first-floor apartment, and change of use of land for the siting of 12 holiday lodge caravans.) Condition 23 - Drainage Maintenance Plan
Land On The North Side Of Shopwhyke Road Shopwhyke West Sussex
Application for the Approval of Reserved Matters following Outline Planning Permission O/11/05283/OUT (as varied by O/18/02326/FUL) - relating to the site layout, scale, appearance and landscaping for 13 dwellings - Variation of Condition 1 of reserved matters approval O/19/01983/REM to change two plots from 2-bedroom houses to 3-bedroom houses (Plot 2 and 8), remove the car port associated with a 3-bedroom house (Plot 3) and add a chimney to Plot 6.
Scartho Top (Phase 4) Matthew Telford Park Grimsby North East Lincolnshire
Variation of Condition 1 (Approved Plans) for amended house types and site layout. Information supplied for the variation of conditions 2 (Materials), 3 (Landscaping), 5 (Drainage), 6 (Footpaths), 7 (Construction Management Plan), 8 (Ecology and Bio Diversity), 10 (Air Quality Improvement Plan), 11 (Highway Construction details) and 15 (Ecology) following DM/1049/16/REM. ALL RELATING TO PHASE 3 ONLY - Amended Landscaping Details July 2022