Pasquill Roof Trusses Ltd 4 Salbrook Road Salfords Surrey RH1 5GJ
New extensions to North and South-West elevations of the existing industrial building. Extending internal mezzanine floor area. A new fire escape stair and staff only access stair and walkway, and external machine concrete slab with timber fence on two sides.
Suffolk Life Annuities Unit 3 Mapledean Works Maldon Road Mundon Essex
Variation of condition 4 on approved planning permission 22/00103/FUL (Removal of palisade fencing and storage container and erection of single storey E(g)(iii) (light industrial) and B8 (storage) industrial building. Variation: To allow extend working times to include Saturdays 8am-2pm.
Unit 2 Aztec Building West Street Glenfield Leicestershire LE3 8DT
Extension to the existing industrial unit and retention of palisade fencing.
B M Composites Station Nurseries Sutton Road Catfield Great Yarmouth NR29 5BG
Change of use of existing factory building from use class B2 (general industrial) to B1 uses (office, research and development) with ancillary stores and showroom and external alterations. Erection of extension to existing building to provide office space (B1 use) and additional factory space (B2 use) for manufacture, assembly, servicing, and testing of self-propelled crop sprayers. Erection of a new building for associated use as shot blasting and paint spray booth. Use of site area for product testing area. Formation of ancillary roadways, additional car parking, boundary fencing, landscaping and associated foul and surface water drainage.
Quatchem Ltd 1 - 4 Sandfield Industrial Park Dodgson Street Rochdale OL16 5SJ
Erection of an extension to an industrial building for Use Class B2 (General Industrial), Use Class B8 (Storage), Use Class B1 (Office & Lab), alterations to existing front and side elevation to form new visitor entrance and new car park to front with 2.4m high perimeter fence
Units 3 And 4 Sellick Industrial Units Gilston Road Saltash Cornwall PL12 6LF
Two storey extension to industrial unit raising yard level including retaining structure covered external storage, security gates and fence. Steps to allow western power access beyond site.