47 Oving Road Whitchurch Buckinghamshire HP22 4JF
Variation of Condition 9 (materials) attached to planning permission 20/04200/ADP (Approval of reserved matters pursuant to outline permission 18/04528/AOP for appearance and landscaping of demolition of existing industrial building, change of use and construction of two houses with open carports and associated external works as covered by conditions 1 to 14. Discharge of Condition 1 - Appearance, Condition 4 - Phase 1 and 2 Geotechnical Report, Condition 5 - Transport and Environmental Management Plan, Condition 6 - Tree Protection Plan, Condition 7 - Vision spalys, Condition 9 - Cycle parking, Condition 11 - Landscaping, Condition 13 - Disposal of surface and foul water , Condition 14 - Means of enclosure)
47 Oving Road Whitchurch Buckinghamshire HP22 4JF
Approval of reserved matters pursuant to outline permission 18/04528/AOP for appearance and landscaping of demolition of existing industrial building, change of use and construction of two houses with open carports and associated external works as covered by conditions 1 to 14. Discharge of Condition 1 - Appearance, Condition 4 - Phase 1 and 2 Geotechnical Report, Condition 5 - Transport and Environmental Management Plan, Condition 6 - Tree Protection Plan, Condition 7 - Vision spalys, Condition 9 - Cycle parking, Condition 11 - Landscaping, Condition 13 - Disposal of surface and foul water , Condition 14 - Means of enclosure.
102 Aylesbury Road Bierton Buckinghamshire HP22 5DL
Variation and discharge relating to application 19/03891/APP Variation - move the 2 houses that were approved in the plot to be futher away from barnett way - Discharge conditions 2 (construction method statement) 3 (tree protection plan) 4 (foul and surface water) 5 (slab levels) 13 (landscape) 6 and 19 (build in accordance with approved site plan)
Land Adjacent To No 38 Eythrope Road Stone Buckinghamshire HP17 8PG
Proposed non-material amendment sought to permission for (Approval of Reserved Matters pursuant to outline permission 19/00097/AOP for appearance, appearance, landscaping, layout and scale of a residential development of 5 dwellings and discharge of conditions 1 (details of layout) 4 (slab levels) 5 (hard and soft landscaping) 7 (archaeological) 11 (details of dropped kerb) 12 (details of parking and manoeuvring) 14 (construction transport management plan) 15 (trees) 18 (whole life maintenance plan) 23 (details of screen, boundary, fences, walls) 24 (slab levels) and 25 (details of means of foul and water drainage) relating to 20/01342/ADP) to rectify clerical errors in the description of the approved reserved matters application.
Land Adj To 38 Eythrope Road Stone Buckinghamshire HP17 8PG
Approval of Reserved Matters pursuant to outline permission 19/00097/AOP for appearance, appearance, landscaping, layout and scale of a residential development of 5 dwellings and discharge of conditions 1 (details of layout) 4 (slab levels) 5 (hard and soft landscaping) 7 (archeological) 11 (details of dropped kerb) 12 (details of parking and menoevuring) 14 (construction transport management plan) 15 (trees) 18 (whole life maintenance plan) 23 (details of screen, boundary, fences, walls) 24 (slab levels) and 25 (details of means of foul and water drainage)
Haddenham And Thame Parkway Station Thame Road Haddenham Buckinghamshire
Submission of detail pursuant to Conditions : 5 - Phasing discharge; 7 - Samples of the materials proposed to be used on the external surfaces; 8 - Details of both hard and soft landscape works; 10 - Tree Protection Plan (TPP) and Arboricultural Method Statement (AMS) in accordance with BS5837 detailing how trees and hedgerow fronting Thame Road to be retained are to be protected; 11- Slab levels; 12 - Details of the facilities to be provided for the storage and collection of refuse; 16- Scheme for parking, garaging and manoeuvring; 17 - Accommodate all site operatives', visitors' and construction vehicles loading, off-loading, parking and turning within the site during the construction period; 18 - Adequate precautions taken during the construction period to prevent the deposit of mud and similar debris on the adjacent public highways; 19 - Detailed surface water drainage scheme and an assessment of the hydrological and hydrogeological context of the development in any phase; 20 - Scheme to deal with the risks associated with contamination of the site and 21 - Verification report demonstrating completion of the works set out in the approved remediation strategy and the effectiveness of the remediation on outline permission 10/00009/AOP