Church Farm Church Hill Road Barnet EN4 8XE
Demolition of swimming pool and shed and the erection of a new shed and a part single storey/part two storey terraced development to provide 8no. residential dwellings. Associated car and cycle parking and landscaping (This is a revision to identify the phasing of development)
Church Farm Church Hill Road Barnet EN4 8XE
Demolition of swimming pool and shed and the erection of a new shed and a part single storey/part two storey terraced development to provide 8no. residential dwellings. Associated car and cycle parking and landscaping. (This is a revision to identify the phasing of development)
17 Holne Chase London N2 0QL
Non-material amendments to planning permission reference 23/1956/FUL dated 21/07/23 for 'Demolition of existing dwelling and rear substation. Construction of a new two storey dwelling with basement level and rooms in roofspace, new integral garage and substation. Associated hard and soft landscaping, refuse and recycling, cycle store Amendments include: Removal of the words 'and substation' to change the wording of the description of development to 'Demolition of existing dwelling and rear substation. Construction of a new two storey dwelling with basement level and rooms in the roof space, new integral garage, associated hard and soft landscaping, waste store and cycle store.'
Unit 4 Hyde Estate Road London NW9 6JX
Non material amendment to planning ref 19/4661/FUL dated 31/07/2020 for 'Full planning application for the comprehensive phased redevelopment of existing supermarket site comprising phased demolition of existing store and Petrol Filling Station and construction of a mixed use development comprising a replacement Sainsburys store of 8,998 sqm GIA (Use Class A1), 1,309 residential units (Use Class C3) and 951 sqm GIA flexible commercial space (Use Class A1 to A4, B1, D1 and D2) in buildings ranging from 4 to 28 storeys. Enabling works phase to comprise demolition of PFS, amendments to existing supermarket including the construction of new temporary entrance, highways works, amendments to car park and access arrangements and other associated works. Phase 1 to comprise construction of new supermarket including basement, car and cycle parking, plant and servicing areas, 770 residential units and podium level amenity space. Phase 2 to comprise the demolition of existing supermarket and other associated works, 539 residential units, flexible commercial space, basement, car and cycle parking, public open space, landscaping, vehicular and pedestrian routes, servicing and access arrangements and other associated works. The application is accompanied by an Environmental Statement (and an Environmental Statement Addendum). (SUBJECT TO SECTION 106 LEGAL AGREEMENT DATED 30 JULY 2020'. Amendments to unit mix
Bestway Cash & Carry Ltd, Geron Way, London, NW2 6LJ
Demolition of the existing buildings and structures on site and the erection of a mixed use development up to 7 storeys in height, above a podium varying between 1 and 2 storeys, comprising a cash and carry warehouse (sui generis use) of 7637 square metres, 3500 square metres of office (use class B1) space, 223 residential units (use class C3), 970 square metres of crèche (use class D1) and community hall (use class D2) space, 203 square metres of retail (use class A1) and café (A3) space, a 90 square metre facility for the Metropolitan Police Authority (use class D1), with associated car parking, cycle parking, landscaping, works and changes to site access. Application submitted for outline planning permission with matters other than access reserved and accompanied by an Environmental Statement (REVISED PLANS, DOCUMENTATION AND DESCRIPTION OF PROPOSAL).
Unit 4 Hyde Estate Road London NW9 6JX
Non-material amendments to planning permission reference 19/4661/FUL dated 31/07/20 for 'Full planning application for the comprehensive phased redevelopment of existing supermarket site comprising phased demolition of existing store and Petrol Filling Station and construction of a mixed use development comprising a replacement Sainsburys store of 8,998 sqm GIA (Use Class A1), 1,309 residential units (Use Class C3) and 951 sqm GIA flexible commercial space (Use Class A1 to A4, B1, D1 and D2) in buildings ranging from 4 to 28 storeys. Enabling works phase to comprise demolition of PFS, amendments to existing supermarket including the construction of new temporary entrance, highways works, amendments to car park and access arrangements and other associated works. Phase 1 to comprise construction of new supermarket including basement, car and cycle parking, plant and servicing areas, 770 residential units and podium level amenity space. Phase 2 to comprise the demolition of existing supermarket and other associated works, 539 residential units, flexible commercial space, basement, car and cycle parking, public open space, landscaping, vehicular and pedestrian routes, servicing and access arrangements and other associated works. The application is accompanied by an Environmental Statement (and an Environmental Statement Addendum).' Amendments include: Amendments to the brick pier projections / window reveals; Replacement of aluminium slab edge details with high quality brickwork; Rationalisation of balconies / balustrade detailing; Amendments to the inset soffit
West Hendon Estate, West Hendon, London, NW9
Non material amendment to planning permission H/01054/13 dated 20/11/2013 for "Hybrid planning application for the demolition and redevelopment of the West Hendon Estate to accommodate up to 2000 residential units, a new 2 form entry primary school, community building and commercial uses and associated open space and infrastructure comprising: Outline submission for the demolition of existing buildings and the construction of up to 1642 new residential units (Class C3); up to 3,870m2 (GEA) of D1 Class floorspace comprising nursery and primary school and community centre uses and up to 1,635m² (GEA) Class A1/A2/A3/A4/A5/B1 floorspace, within buildings ranging from 2 to 29 stories, associated cycle and car parking provision including basement level parking, landscaping and public realm works, interim works, associated highway works, and two pedestrian bridges across the Welsh Harp. Full planning submission (Phase 3 Blocks G1, G2, E1, E2, E3, E4) for the construction of 358 new residential units (Class C3), and 131m² (GEA) Class A1/A2/A3/A4/A5/B1 floorspace, within buildings ranging from 5 to 26 stories, cycle and car parking provision including basement level parking, associated landscaping and public realm works, associated highway works, energy centre, and interim works. Submission of Environmental Statement." Amendments include changes to parameter plans and development specification, amended wording to conditions 5 and 7.
Crown Honda Hyde Estate Road London NW9 6JX
Phased redevelopment of site comprising the demolition of all existing buildings and structures and construction of a mixed-use development to comprise a two storey podium level with three buildings above ranging in height from 20 to 24 storeys providing a range of uses including up to 470 residential units (Class C3), office and workspace (Class B1), self-storage (Class B8), flexible community space (Class D1) and a café (Class A3), associated car and cycle parking, public open space, landscaping, vehicular and pedestrian routes, servicing and access arrangements and other associated works. (The application is accompanied by an Environmental Statement) (SUBJECT TO LEGAL AGREEMENT DATED 3 AUGUST 2022)
New Bevan Baptist Church Grove Road Barnet EN4 9DF
Non-material amendments to planning permission reference 20/1469/FUL dated 10/09/20 for 'Demolition of the existing buildings and construction of a new two storey community building (Use Class D1) and a three storey residential block comprising of 9 self-contained flats ( 1 x 1 bed, 6 x 2 bed and 2 x 3 bed units) with associated hard and soft landscaping, amenity space, refuse storage, bike store and off-street parking.' Amendments include changes to the wording of condition 17 from 'The new Community Building (D1 use) hereby approved shall be fully constructed and in use prior to the first occupation of any of the self contained residential uses (C3) onsite.' to read 'The new Community Building (D1 use) hereby approved shall be fully constructed and available for use prior to the first occupation of any of the self-contained residential uses (C3) onsite.' Proposal non -material amendment Amend the wording of condition 17 from: The new Community Building (D1 use) hereby approved shall be fully constructed and in use prior to the first occupation of any of the self contained residential uses (C3) onsite. To The new Community Building hereby approved shall be fully constructed and available for use prior to the first occupation of any of the self-contained residential uses (C3) onsite. The applicant has submitted the application to give greater flexibility to occupy the residential development prior to the Community Building is first in use.
The O2 Masterplan Site Finchley Road London NW3 6LU
Outline planning permission for Development Plots N1, N2, N3, N6, N7 ,S1 and S8 including the demolition of all existing structures and redevelopment to include residential development (Class C3) commercial, business and service uses (Class E), sui generis leisure uses (including cinema and drinking establishments) together with all landscaping, public realm, cycle parking and disabled car parking, highway works and infrastructure within and associated with those Development Plots.