59 - 63 Bow Lane London N12 0JL
Demolition of Nos. 61-63 and construction of 2no. dwellinghouses with rooms in roofspace and basement. Partial demolition of No. 59 with alterations to roof and conversion from HMO (House in Multiple Occupation) to single family dwellinghouse. Associated amenity space, off-street parking, refuse storage and cycle parking
62 Hertford Road London N2 9BU
Part single, part two-storey side and rear extensions following demolition of existing rear conservatory and chimney to side elevation. Installation of 1no additional entrance to front elevation with new access steps. Extension to roof including, raising the ridge height, 2no dormers to rear elevation and 5no rooflights to front elevation. 1no (obscure glazed) gable window to side elevation to provide conversion of 2no existing flats to 2no single family dwellinghouses. Associated alterations to doors and windows. Associated alterations to landscaping including new raised patio and installation of new glass balustrade and railing to front elevation, installation of access ramp, side/front gate and railing to side elevations. Provision of cycle storage and refuse and recycling storage
217 Booth Road London NW9 5LD
Single storey rear extension following demolition of the existing conservatory. First floor side extension. Conversion of the garage into habitable room, insertion of window to replace the garage door
2 Clyde Villas Hadley Green Road Barnet EN5 5PP
Conversion of existing flats into a 15 bedroom Assisted Living Support Centre for adults with learning difficulties including two-storey rear extension at basement and ground floor levels with associated lightwell and terrace. Single storey outbuilding following demolition of existing outbuildings. Alterations to hard and soft landscaping to rear garden (tbc)
18 Alberon Gardens London NW11 0AG
Part single, part two storey side and rear extension with new rear access steps following demolition of the existing rear store. Conversion of the existing garage into habitable room, insertion of window to replace the garage door. Front porch extension
118 High Street Barnet EN5 5XQ
Partial demolition of part of the first floor at the rear to create a courtyard at first floor level. Second floor rear extension and conversion of former bank at first and second floor levels including installation of 3no. rooflights to the flat roof of the front building and insertion of windows at first and second floor levels at the rear to provide one office unit and 5no. self-contained flats. Associated refuse and cycle storage
118 High Street Barnet EN5 5XQ
Partial demolition of part of the first floor at the rear to create a courtyard at first floor level. Second floor rear extension and conversion of former bank at first and second floor levels including installation of 3no. rooflights to the flat roof of the front building and insertion of windows at first and second floor levels at the rear to provide one office unit and 5no. self-contained flats. Associated refuse and cycle storage (LISTED BUILDING CONSENT)
2 Clyde Villas Hadley Green Road Barnet EN5 5PP
Conversion of existing flats into a 16 bedroom Assisted Living Support Centre for adults with learning difficulties including two-storey rear extension at basement and ground floor levels with associated lightwell and terrace. Single storey outbuilding following demolition of existing outbuildings. Alterations to hard and soft landscaping to rear garden
5 Claremont Park London N3 1TG
Part single, part two storey side and rear extension following demolition of existing garage, together with material consideration of previously approved loft conversion
22 The Park London NW11 7SU
New flat roof on existing single storey rear extension. New rear terrace with metal balustrade at first floor level over new flat roof. Alterations to roof including a rear dormer window. Alterations to openings on the rear and side elevation with replacement doors and windows. New metal railings to the existing first-floor level rear terrace. Re-cladding of the existing rear with matching clay tile on first-floor level. Demolition of existing Garage 01 outbuilding with new replacement habitable outbuilding with flat roof. Conversion and refurbishment of existing Garage 02 outbuilding into a habitable space with enlarged openings, new doors/ windows and replacement roof.