Cheval Outwood Riding Centre Outwood Farm Road Billericay Essex CM11 2TX
To establish the lawfulness for light industrial use on Plots 1 and 2, Cheval, Outwood Riding Centre, Outwood Farm Road
Crays Hall Farm Church Lane Ramsden Crays Billericay Essex CM11 2UN
Reserved Matters application in relation to the detailed layout, scale, and appearance of a new agricultural workers dwelling approved under outline consent reference 20/00198/OUT
Land North Side Of Newlands Road Billericay Essex
Construction of a proposed detached 2 bed dwelling adjacent to 42/44 Dukes Farm Road
Cheval Outwood Riding Centre Outwood Farm Road Billericay Essex CM11 2TX
Demolition of the existing, vacant agricultural buildings and the construction of two detached dwellings with associated landscaping
Crouch Solar Farm Site Dunton Road Dunton Basildon Essex
Construction and operation of a solar farm together with all associated works, equipment and necessary infrastructure
Park Farm Dairy Site Lee Chapel Lane Langdon Hills SS16 5PW
Erection of an additional detached 2 bed dwelling on land at Park Farm Dairy site
Cheval Outwood Riding Centre Outwood Farm Road Billericay Essex CM11 2TX
Demolition of the existing, vacant agricultural buildings and the construction of two detached dwellings with associated landscaping.
Stockwell Hall Clock House Road Little Burstead Billericay Essex CM12 9ST
Change of use of land from agricultural use to mixed agricultural/domestic use and the erection of a garage/tractor shed/domestic storage building with home office above
Kingsmans Farm Tye Common Road Billericay Essex CM12 9PZ
Notification for prior approval for a proposed change of use of an agricultural building to a flexible use within shops (Class A1), financial and professional services (Class A2), restaurants and cafes (Class A3), business (Class B1), storage or distribution (Class B8), hotels (Class C1) or assembly and leisure (Class D2).
Land At Outwood Farm Road Billericay Essex
Variation of conditions 1 and 2 of planning permission 18/00946/VAR (14/00948/FULL) to allow the development to take place in two phases with an extended lifetime for phase 2 of the solar farm to 35 years