Faulkners Down Farm And Land East Of Harewood Peak London Road Picket Piece, Andover SP11 6LZ
EIA in respect of application for alterations and additions to plant, including but not limited to the erection of biodigester and installation of hydrolyser; alterations and extension to barns, erection of fencing and retaining wall, construction of tunnel, change of use of workshop to offices; enlargement of Biodigester Plant to provide Feedstock Stock Store, including re-contouring of land to form sunken terrace with embankments and settling ponds, with associated landscaping, fencing, plant, weighbridge and office, erection of feedstock system building and planting (part retrospective) PLEASE NOTE THE DECISION ON THIS APPLICATION IS MADE BY TEST VALLEY COUNCIL CASE REF: 16/01979/FULLN
Bridgwater House Jays Close Basingstoke Hampshire RG22 4AX
Change of use of an existing Class E(g)(i) (office and light industrial use) to a flexible combined use Class E(g)(i) and Class F(1)(a). Erection of 2m high fencing and revised parking layout.
Bridgwater House Jays Close Basingstoke Hampshire RG22 4AX
Change of use from Class E(g)(i) (office and light industrial use) to a local independent school (Class F(1)(a)). Erection of 2m high fencing / access gate and revised parking layout.
T J Lowery Riverside View Basing Road Old Basing Basingstoke Hampshire RG24 7AL
Cut back branches overhanging slatted fence. Fell 3 tree leaning toward office.
Athletics Track At Down Grange Pack Lane Basingstoke RG22 5SN
Development of Seated stand, modular meeting room building, finish line camera gallery and office building, judge and time keeper stand. Erection of 3 metre high security fencing
17 Cuffelle Close Chineham RG24 8RH
Erection of outbuilding forming home office. Erection of 2.4 metre high boundary fence. Installation of cladding to the front and side elevations of dwelling
Southern Cross Basing View Basingstoke RG21 4HG
Installation of external wrap cladding to much of the north, west and south elevations of the existing office building and a proprietary rain-screen system around the remainder of the building. Erection of new lobby and delivery bay, replacement of car parking spaces with office building for maintenance staff, shower and locker facilities for all staff, secure storage and enclosed compound for wheeled bin storage. Erection of 1.8m high perimeter security fencing and gates