Land In Itchen Valley And Candover Valley, Hampshire
Construction and operation of an approximately 8.1km raw water pipeline, predominantly as a permanent below ground pipeline (approximately 7.2km) but with five temporary above ground sections of pipeline (approximately 900m) and other temporary accesses, hardstandings, plant (including temporary water booster pumping station) and equipment capable of installation, removal, storage and re-installation in advance of and operation during severe drought events over the period to the end of 2030. Provision of a new permanent pole mounted high voltage power supply REF: HCC/2023/0083 PLEASE NOTE THAT THIS APPLICATION WILL BE DETERMINED BY HAMPSHIRE COUNTY COUNCIL CASE OFFICER: Jane Rarok
Land South Of Ravenswing Farm, Adjoining Aldermaston Road And Silchester Road, Tadley
Construction of Class A1 foodstore with associated car parking, access and landscaping APPLICATION NUMBER 19/01063/COMIND CASE OFFICER: MICHAEL BUTLER PLEASE NOTE THIS APPLICATION WILL BE DETERMINED BY WEST BERKSHIRE COUNCIL
6 Lyde Close Oakley Basingstoke Hampshire RG23 7AW
Prior notification for the proposed enlargement of dwellinghouse by construction of additional storeys to a maximum height of 7.3 metres high(Permitted Development Notification)