Land North Of College Farm Green Lane Clapham Bedfordshire
Construction and operation of a solar photovoltaic farm including fencing, internal service tracks, inverters, transformer stations, cabling, CCTV, landscaping, substations and ancillary cabins, including variation of approved plans condition 1 attached to 22/01581/MAF, to allow for exclusion of solar panels from an area of significant archaeological interest and relocation to the southern extent of the panel deployment area, use of a ground intrusive panel frame mounting system to replace the approved sleeper system with all cables to be buried underground and removal of the maximum 10 work personnel on site, as referred to in the approved Planning Statement.
Land South And East Of Goosey Lodge Farm Wymington Lane Wymington
Demolition of existing structures and the installation of a solar farm with associated infrastructure and landscaping
Land North Of College Farm Green Lane Clapham Bedfordshire
Construction and operation of a solar photovoltaic farm including fencing, internal service tracks, inverters, transformer stations, cabling, CCTV, landscaping, substations and ancillary cabins.
Redhouse Farm Riseley Road Bletsoe Bedford Bedfordshire MK44 1QU
Erection of one detached dwelling following demolition of existing agricultural building. Alterations to existing access and landscaping.
Redhills Barn, Redhills Field Land North West Of West End Farm Buildings West End Road Kempston Bedfordshire
22/00655/AGR - Landscape Visual Impact Assessment, Materials and Details of Design and Appearance (Erection of agricultural building)
Barns At Lower Goodwick Farm Begwary Lane Begwary Bedford MK44 2NX
Change of Use of Agricultural Land to form residential garden land associated with the three dwellings approved under 19/02526/CPNQ, and associated landscaping, hardstanding and fencing/gates.
Land North Of And Including The Baulk Clapham Bedfordshire
Construction and operation of a solar photovoltaic farm including improvements to site access, fencing, inverter and transformer stations, cabling, CCTV, landscaping and substations, including variation of condition 3 attached to 14/01789/MAF, to extend the potential lifetime of the solar farm to 50 years from grid connection date.