21 Hollies Walk Wootton Bedford Bedfordshire MK43 9LB
Demolition of part of the existing garden wall / fence and erection of a two storey side extension.
7 Fulmar Road Bedford Bedfordshire MK41 7JX
Demolition of existing conservatory and erection of a single storey rear extension, canopy over front entrance door, alterations to existing garage and erection of 2.1m high timber fence to replace existing fence to rear garden boundary.
Halesworth 73 Mill Road Sharnbrook Bedford Bedfordshire MK44 1NP
Single storey rear extension with inclusion of boundary fencing 3.1 metres in height to screen patio
17 Wigram Close Elstow Bedford Bedfordshire MK42 9PZ
Erection of veranda and canopy. Extension of existing fence and addition of garden gate, part conversion of garage to study (Development already carried out) and new block paving to front garden.
Hill Farm Barford Road Wilden Bedford Bedfordshire MK44 2QG
Two storey rear and side extensions and erection of new 3 bay car barn and associated gates and fences
103 Elstow Road Bedford Bedfordshire MK42 9NS
Single storey rear/side extension and partial replacement of existing boundary fence with 1800mm brickwork wall
Chequers Lodge Chequers Hill Wilden Bedford Bedfordshire MK44 2QQ
Two storey front, side and rear extensions and addition of new first floor, remodelling with render and cladded elevations and new front wall/fence.
Land At 1 Collins Place Bedford Bedfordshire MK42 0ND
Erection of 1.8 metre high fence to extend current garden (development already carried out)
Halesworth 73 Mill Road Sharnbrook Bedford Bedfordshire MK44 1NP
Single storey side and rear extension with inclusion of boundary fencing 3.1 metres in height to screen patio
Land North Of And Including The Baulk Clapham Bedfordshire
Construction and operation of a solar photovoltaic farm including improvements to site access, fencing, inverter and transformer stations, cabling, CCTV, landscaping and substations, including variation of condition 3 attached to 14/01789/MAF, to extend the potential lifetime of the solar farm to 50 years from grid connection date.