Esholt Sewage Treatment Works The Avenue Apperley Bridge Bradford West Yorkshire
Upgrading of the existing Esholt Wastewater Treatment Works including a new chemical dosing kiosk, a new control panel kiosk and 2 x 3m high security fencing
15 Damon Avenue Bradford West Yorkshire BD10 0LJ
Construction of outbuildings to side/front and rear; patio canopy to rear; new stone walling to replace existing boundary fence
2 Beacon Grove Bradford West Yorkshire BD6 3EB
Retrospective application for 1.8m high wooden fence.
6 West Scholes Brewery Lane Thornton Bradford West Yorkshire BD13 1NQ
Retrospective application for boundary wall perimeter fence
70 - 72 Main Street Haworth Keighley West Yorkshire BD22 8DP
Patio, outdoor seating area and boundary fencing (part retrospective)
Spring Farm Spring Lane Eldwick Bingley West Yorkshire BD16 3AS
Replacement of side boundary hedge and construction of 1.5M picket fence with pedestrian gate (retrospective)
Spring Farm Spring Lane Eldwick Bingley West Yorkshire BD16 3AS
Replacement of side boundary hedge and construction of 1.5M picket fence with pedestrian gate (retrospective)
Hollingwood Primary School Hollingwood Lane Bradford West Yorkshire BD7 4BE
Construction of 2m high bow top fence to front of school and 2m high mesh fence to side and rear boundaries.
Becks Mill Becks Road Keighley West Yorkshire BD21 1SD
Installation of 3m high steel palisade fence to the side of the road running adjacent to the development land