9 Hedingham Road Halstead Essex CO9 2DA
Variation of Condition 2 (Approved Plans) of approved application 20/02191/HH granted 13.04.2021 for: Erection of a garage and boundary wall. Variation would allow:-the boundary wall design to have a brick base and piers with close board fencing.
Land Adjacent Butlers Wood And Waldergrave Wood West Of A131 Sudbury Road Twinstead Essex
Variation of Condition 2 (Approved Plans) & Condition 3 (Surface Water Drainage) of approved application 22/01147/FUL granted 25.10.2022 for: A new 400/132 kilovolt (kV) Grid Supply Point (GSP) substation including two supergrid transformers, associated buildings, equipment and switchgear, a single circuit cable sealing end compound, a new permanent vehicular access to the public highway, associated landscaping (including boundary fencing, an area for Biodiversity Net Gain, and landscape mounding) and drainage. Condition 2:- Would allow a reduction of substation footprint , improved cable alignment, rationalisation of the number and location of buildings, revised position and alignment of the supergrid transformer gantry moving it further from the A131. Condition 3 to be reworded to amend the SUDs trigger point.
Braintree College Further Education Church Lane Braintree Essex CM7 5SE
Non-Material Amendment to permission 21/00680/VAR granted 03.09.2021for: Variation of Conditions 2 (Approved Plans), 5 (Materials), 6 (Materials), 12 (Lighting), 14 (Transport Improvements), 15 (Remediation), 17 (Piling), 18 (Surface Water), 19 (Surface Water) and 22 (Piling) of permission 19/01743/FUL granted 15/10/2020 for Demolition of existing college buildings, structures and facilities and the erection of a 75 bedroom care home and 19 No. age-restricted LifeLong Homes for those 55 years of age and over (and/or those living with, or supporting someone with a disability), alteration to access; supporting site infrastructure including sub-station, visitor parking, hard and soft landscaping, fences, boundary screening and SuDS; new public access to an established open space; widening of public footpath along Church Lane to improve pedestrian access. Amendment would allow :-Omitting the Juliet Balconies.
Braintree College Further Education Church Lane Braintree Essex CM7 5SE
Non-Material Amendment to permission 21/00680/VAR granted 03.09.2021 for: Variation of Conditions 2 (Approved Plans), 5 (Materials), 6 (Materials), 12 (Lighting), 14 (Transport Improvements), 15 (Remediation), 17 (Piling), 18 (Surface Water), 19 (Surface Water) and 22 (Piling) of permission 19/01743/FUL granted 15/10/2020 for Demolition of existing college buildings, structures and facilities and the erection of a 75 bedroom care home and 19 No. age-restricted LifeLong Homes for those 55 years of age and over (and/or those living with, or supporting someone with a disability), alteration to access; supporting site infrastructure including sub-station, visitor parking, hard and soft landscaping, fences, boundary screening and SuDS; new public access to an established open space; widening of public footpath along Church Lane to improve pedestrian access. Amendment would allow for: General minor amendments to external works and addition of mounted sign.
17 Crunch Croft Sturmer Essex CB9 7XE
Variation of Condition 2 (Approved Plans) of permission 22/01157/HH granted 20.07.2022 for: Erection of two-storey side extension, new porch, raised garden deck and screen fencing to rear garden. Variation would allow:- Boundary treatment to change from timber to brick and addition of window to the ground floor.
Braintree College Further Education Church Lane Braintree Essex CM7 5SE
Variation of Condition 2 (Approved Plans) of approved application 19/01743/FUL granted 15.10.202 for: Demolition of existing college buildings, structures and facilities and the erection of a 75 bedroom care home and 19 No. age-restricted LifeLong Homes for those 55 years of age and over (and/or those living with, or supporting someone with a disability), alteration to access; supporting site infrastructure including sub-station, visitor parking, hard and soft landscaping, fences, boundary screening and SuDS; new public access to an established open space; widening of public footpath along Church Lane to improve pedestrian access. Variation would allow for: - Minor alterations to plot 4, 5 and 9.
Heathers The Green Hatfield Peverel Essex CM3 2JF
Non-Material Amendment to permission 21/01859/VAR granted 09.11.2021 for: Variation to condition 2 (Approved Plans), Condition 4 (Lighting), Condition 5 (Biodiversity Enhancement Strategy), Condition 9 (Construction Method Statement), Condition 12 (Arboricultural Report), Condition 14 (Refuse Strategy), Condition 15 (Acoustic Fence Details), Condition 16 (Noise Insulation), Condition 18 (Boundary Treatments), Condition 19 (Vehicles Charging Points) of permission 20/01465/FUL granted 12/03/2021 for: Erection of 7 No. two storey dwelling houses, accompanied with 17 dedicated parking spaces. Amendment would allow: - Relocation of visitor parking space
Heathers The Green Hatfield Peverel Essex CM3 2JF
Variation to condition 2 (Approved Plans), Condition 4 (Lighting), Condition 5 (Biodiversity Enhancement Strategy), Condition 9 (Construction Method Statement), Condition 12 (Arboricultural Report), Condition 14 (Refuse Strategy), Condition 15 (Acoustic Fence Details), Condition 16 (Noise Insulation), Condition 18 (Boundary Treatments), Condition 19 (Vehicles Charging Points) of permission 20/01465/FUL granted 12/03/2021 for: Erection of 7 No. two storey dwelling houses, accompanied with 17 dedicated parking spaces.
Braintree College Further Education Church Lane Braintree Essex CM7 5SE
Variation of Conditions 2 (Approved Plans), 5 (Materials), 6 (Materials), 12 (Lighting), 14 (Transport Improvements), 15 (Remediation), 17 (Piling), 18 (Surface Water), 19 (Surface Water) and 22 (Piling) of permission 19/01743/FUL granted 15/10/2020 for Demolition of existing college buildings, structures and facilities and the erection of a 75 bedroom care home and 19 No. age-restricted LifeLong Homes for those 55 years of age and over (and/or those living with, or supporting someone with a disability), alteration to access; supporting site infrastructure including sub-station, visitor parking, hard and soft landscaping, fences, boundary screening and SuDS; new public access to an established open space; widening of public footpath along Church Lane to improve pedestrian access.