Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for the Plot 5 (Zone B) - The erection of 1no. building split between 2no. units, totalling circa 3,517sqm GEA of Use Class E (g)(iii) (Industrial) with ancillary office, associated car parking, service yards and landscaping. Checklist application for discharge of Conditions G1; (Design Code Compliance); G2. (Compliance Checklist); G7. (Construction Management Plan); G10 (Wayfinding); P1. (Plot Landscaping); P2. (Access); P3. (Parking); P5. (Surface Water Drainage); P6. (Foul Drainage); P10. (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO.
Land At Earls Colne Industrial Park The Airfield Earls Colne Essex CO6 2NS
Non-Material Amendment to permission 18/02263/FUL granted 04.12.2020 for: Construction of a 2 storey office building (B1a and B1b), with ancillary Café at ground floor level, with associated access, parking, landscaping and open space. Amendment would allow Condition 13 to be amended to enable the formation of access.
Land Adjacent Tilekiln Farm Braintree Road Sible Hedingham Essex
Construction of new office building and change of use of former agricultural building to associated storage. Change of use from agricultural to commercial land.
Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for Parcel DC 3.1 Zone B - Erection of Research and Development (E(g)(ii) unit with offices E(g)(i) and associated parking, landscaping, drainage, and service/utility infrastructure. Checklist application for discharge of Conditions; Conditions G1; (Design Code Compliance); G2. (Compliance Checklist); G7. (Construction Management Plan); G10 (Wayfinding); P1. (Plot Landscaping); P2. (Access); P3. (Parking); P5. (Surface Water Drainage); P6. (Foul Drainage); P7. (Noise); P10. (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO (AMENDMENT TO PREVIOUS APPLICATION 21/02944/LDOCC).
Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for the EOS plot (Zone B) - The erection of 4no. buildings with 9no. units between totalling circa 11,850m² GEA of Use Class E (g)(iii) (Industrial) with ancillary offices, associated car parking, service yards and landscaping. Checklist application for discharge of Conditions G1; (Design Code Compliance); G2. (Compliance Checklist); G7. (Construction Management Plan); G10 (Wayfinding); P1. (Plot Landscaping); P2. (Access); P3. (Parking); P5. (Surface Water Drainage); P6. (Foul Drainage); P10. (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO.
Land North East Of The Vineyards Hatfield Peverel Essex
Town & Country Planning Act 1990 (as amended), Town & Country Planning (Environmental Impact Assessment) Regulations 2017 - Screening Request (Regulation 6)-Creation and use of a temporary construction compound including; access onto the A12, car parking, a storage yard, welfare and office facilities and associated earthworks bund to be located on land to the north of junction 20b at Hatfield Peverel.
Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for Parcels 1,2 & 3 Zone C - The erection of 3no. buildings totalling circa 14,927m² GEA of Use Class B8 (Storage or Distribution) with ancillary offices, associated car parking, service yards and landscaping. Checklist application for discharge of Conditions G1; (Design Code Compliance); G2. (Compliance Checklist); G7. (Construction Management Plan); G10 (Wayfinding); P1. (Plot Landscaping); P2. (Access); P3. (Parking); P5. (Surface Water Drainage); P6. (Foul Drainage); P7. (Noise); P10. (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO.
Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for the Plot 5 (Zone B) - The erection of 1no. building split between 2no. units, totalling circa 3,196m² GEA of Use Class E (g)(iii) (Industrial) with ancillary office, associated car parking, service yards and landscaping. Checklist application for discharge of Conditions G1; (Design Code Compliance); G2. (Compliance Checklist); G7. (Construction Management Plan); G10 (Wayfinding); P1. (Plot Landscaping); P2. (Access); P3. (Parking); P5. (Surface Water Drainage); P6. (Foul Drainage); P10. (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO.
Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for the Plot 5 (Zone B). The erection of 1no. building totalling circa 3,145m2 GEA of Use Class E (g)(iii) (Industrial) with ancillary office, associated car parking, service yards and landscaping. Checklist application for discharge of Conditions G1 (Design Code Compliance), G2 (Compliance Checklist), G7 (Construction Management Plan), G10 (Wayfinding), P1 (Plot Landscaping), P2 (Access), P3 (Parking), P5 (Surface Water Drainage), P6 (Foul Drainage), P10 (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO.
Land To The East Of Buildbase Phoenix Road Helions Bumpstead Essex
Consultation on Essex County Council -Details pursuant to Condition 19 (Proprietary Treatment Feature Details) attached to planning permission ref: ESS/145/20/BTE (Construction and operation of a waste recycling facility comprising a standalone recycling building, static recycling plant, storage bays and associated plant and equipment, office and welfare building, weighbridge, parking, fencing, lighting, landscaping, overnight HGV parking and new vehicular access)