Bradwell Quarry Church Road Bradwell Essex CM77 8EP
Consultation on Essex County Council :Details pursuant to condition 22 (Noise monitoring June 2023) of planning permission ESS/12/20/BTE. ESS/12/20/BTE was for Extraction of 6.5 million tonnes of sand and gravel (from Site A7 as identified in the Essex Minerals Local Plan 2014) including the retention of the existing access onto the A120, the processing plant (including sand and gravel washing plant), office and weighbridge, ready mix concrete plant, bagging unit, DSM plant, water and silt management systems. In addition, extension of the internal haul road into Site A7 and access for private and support vehicles to the Site A7 contractors' compound via Woodhouse Lane and Cuthedge Lane. Restoration of Site A7 to agriculture and biodiversity (species rich grassland and wetland).
Bradwell Quarry Church Road Bradwell Essex CM77 8EP
Details pursuant to condition 22 (Noise monitoring May 2023) of planning permission ESS/12/20/BTE. ESS/12/20/BTE was for "Extraction of 6.5 million tonnes of sand and gravel (from Site A7 as identified in the Essex Minerals Local Plan 2014) including the retention of the existing access onto the A120, the processing plant (including sand and gravel washing plant), office and weighbridge, ready mix concrete plant, bagging unit, DSM plant, water and silt management systems. In addition, extension of the internal haul road into Site A7 and access for private and support vehicles to the Site A7 contractors' compound via Woodhouse Lane and Cuthedge Lane. Restoration of Site A7 to agriculture and biodiversity (species rich grassland and wetland)."
12A Rayne Road Braintree Essex CM7 2QH
Erection of first-floor extension to provide administration office for existing shop.
Greensted Upper Houses Bulmer Essex CO10 7ET
Change in roof pitch to main dwelling and existing rear extension, erection of balcony, 3No. rear dormers and proposed cart lodge with first floor office
Bowman House 191 South Street Braintree Essex CM7 3QB
Change of Use from Office (Use Class E) to Residential (Use Class C3) to provide 2 x 1 bed and 2 x 2 bed flats, erection of two-storey side extension, demolition of existing cartlodge and erection of two-storey detached cartlodge with 1 x 2 bed flat above (net increase 5 units).
Popps Cottage Little Tey Road Feering Essex CO5 9RP
Erection of two-storey side/rear extension and single-storey side extension. Conversion of 3 existing outbuildings to ancillary annex, store and office space, including single-storey link extension.
92 Feering Hill Feering Essex CO5 9PX
Non-Material Amendment to permission 21/03160/HH granted 13.12.2021 for: Erection of single-storey rear extension to replace existing conservatory and single-storey extensions. Amendment would allow for: - Amendment to the cill height and size of office window to allow for means of escape
Fraser Cottage Pole Lane White Notley Essex CM8 1RD
Two-storey side, single-storey rear and side car port extension. Alterations to garage roof to form first floor office accommodation
Bradwell Quarry Church Road Bradwell Essex CM77 8EP
Consultation on Essex County Council application no. ESS/03/18/BTE/60/02 - Details pursuant to condition 60 (5 Year aftercare scheme for woodland and agriculture) of ESS/03/18/BTE. ESS/03/18/BTE was for "Extraction of 2 million tonnes of sand and gravel (from Site A5 as identified in the Essex Minerals Local Plan 2014) including the retention of the existing access onto the A120, the processing plant (including sand and gravel washing plant), office and weighbridge, ready mix concrete plant, bagging unit, DSM plant, water and silt management systems and extension of the internal haul road into Site A5 with restoration to agriculture and biodiversity (species rich grassland and wetland)".
Bradwell Quarry Church Road Bradwell Essex CM77 8EP
Consultation on Essex County Council application no. ESS/03/18/BTE/LA4 - Details pursuant to Schedule 2 (25 year Biodiversity Management Delivery Plan) of legal agreement associated with ESS/03/18/BTE. ESS/03/18/BT was for "Extraction of 2 million tonnes of sand and gravel (from Site A5 as identified in the Essex Minerals Local Plan 2014) including the retention of the existing access onto the A120, the processing plant (including sand and gravel washing plant), office and weighbridge, ready mix concrete plant, bagging unit, DSM plant, water and silt management systems and extension of the internal haul road into Site A5 with restoration to agriculture and biodiversity (species rich grassland and wetland).