Neighbourhood Centre Towerlands Panfield Road Braintree Essex CM7 5BJ
Creation of a mixed-use building at the Neighbourhood Centre, comprising retail and community uses on the ground floor and office use on the two upper floors, plus an associated car park, hard and soft landscaping, and a recycling centre.
Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for the Plot 5 (Zone B) - The erection of 1no. building split between 2no. units, totalling circa 3,517sqm GEA of Use Class E (g)(iii) (Industrial) with ancillary office, associated car parking, service yards and landscaping. Checklist application for discharge of Conditions G1; (Design Code Compliance); G2. (Compliance Checklist); G7. (Construction Management Plan); G10 (Wayfinding); P1. (Plot Landscaping); P2. (Access); P3. (Parking); P5. (Surface Water Drainage); P6. (Foul Drainage); P10. (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO.
5 Wheaton Road Witham Essex CM8 3UJ
Partial demolition of existing two storey workshop bay incorporating ground and first floor admin and office suites and remodelling to create new office and administrative support areas. Alterations and re-roofing of attached factory and service bays. Removal of single storey later addition to existing workshop and service bay building. Associated landscaping reinstatement and operational development. Application follows earlier part implemented scheme under 21/03147/FUL.
Land At Earls Colne Industrial Park The Airfield Earls Colne Essex CO6 2NS
Non-Material Amendment to permission 18/02263/FUL granted 04.12.2020 for: Construction of a 2 storey office building (B1a and B1b), with ancillary Café at ground floor level, with associated access, parking, landscaping and open space. Amendment would allow Condition 13 to be amended to enable the formation of access.
Plc Hunwick Ltd Kings Road Halstead Essex CO9 1HD
Variation of Condition 1 (Approved Plans) of approved application 21/02718/REM granted 13.04.2022 for: Application for the approval of reserved matters (in respect of appearance and landscaping) pursuant to outline planning permission 19/02304/OUT granted 23.04.21 for the erection of for four x 2 bed houses, five x 4/5 bed houses, 12 flats and 10 commercial units for class B1(a) office purposes. Variation would allow for: Changes to the layout, including resiting of electrical substation and adjustment of associated parking, separation of Plots 13/14 and 15/16 to provide detached houses - landscaping scheme, plans & elevations and street scene have been revised accordingly.
Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for Parcel DC 3.1 Zone B - Erection of Research and Development (E(g)(ii) unit with offices E(g)(i) and associated parking, landscaping, drainage, and service/utility infrastructure. Checklist application for discharge of Conditions; Conditions G1; (Design Code Compliance); G2. (Compliance Checklist); G7. (Construction Management Plan); G10 (Wayfinding); P1. (Plot Landscaping); P2. (Access); P3. (Parking); P5. (Surface Water Drainage); P6. (Foul Drainage); P7. (Noise); P10. (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO (AMENDMENT TO PREVIOUS APPLICATION 21/02944/LDOCC).
Land At The Airfield Earls Colne Essex
Change of Use of land to be used as a Haulage Yard (Sui Generis) with associated works, security fencing, access and landscaping with the erection of a two-storey building to be used as ancillary office space.
Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for the EOS plot (Zone B) - The erection of 4no. buildings with 9no. units between totalling circa 11,850m² GEA of Use Class E (g)(iii) (Industrial) with ancillary offices, associated car parking, service yards and landscaping. Checklist application for discharge of Conditions G1; (Design Code Compliance); G2. (Compliance Checklist); G7. (Construction Management Plan); G10 (Wayfinding); P1. (Plot Landscaping); P2. (Access); P3. (Parking); P5. (Surface Water Drainage); P6. (Foul Drainage); P10. (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO.
Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for Parcels 1,2 & 3 Zone C - The erection of 3no. buildings totalling circa 14,927m² GEA of Use Class B8 (Storage or Distribution) with ancillary offices, associated car parking, service yards and landscaping. Checklist application for discharge of Conditions G1; (Design Code Compliance); G2. (Compliance Checklist); G7. (Construction Management Plan); G10 (Wayfinding); P1. (Plot Landscaping); P2. (Access); P3. (Parking); P5. (Surface Water Drainage); P6. (Foul Drainage); P7. (Noise); P10. (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO.
Towerlands Panfield Road Braintree Essex CM7 5BJ
Non-Material Amendment to approved application 19/00786/OUT granted 09.04.2021 for: Outline planning application for up to 575 homes together with a 0.13ha site for early years and childcare nursery (D1), Up to 250sqm of local retail (A1) and up to 250sqm of community facilities (D1), green infrastructure including formal/informal open space and amenity space, provision of ecological mitigation area to north-west of developable area, landscaping including woodland and hedgerow planting, new vehicular accesses from the B1053 and Panfield Lane, closure of existing access from Deanery Hill (south), footway and cycleway network, supporting infrastructure (utilities including gas, electricity, water, sewerage, telecommunications (and diversions as necessary), diversion of public right of way, sustainable drainage systems, any necessary demolition and ground remodelling. Amendment would allow for: - Amendment to the wording of the approved Parameter Plan: Development Framework (UNX003/PP/001 rev F) and the Design Code to reflect the use of the upper floors of the Neighbourhood Centre as office space rather than residential use, as proposed by application 22/02084/FUL.