Braintree Village Charter Way Braintree Essex
Temporary change of use of vacant land (at Braintree Village) to provide an Ice Rink and associated facilities situated within a Marquee including a box office, skate collection/return point, first aid room, internal viewing platform, staff room, catering facility and plant equipment for a period of 12 weeks per year (from 2023) until 2028.
Former Finchingfield United Reformed Church The Green Finchingfield Essex CM7 4JX
Proposed conversion from offices (Class E) to residential use (C3) to form 3 No. 2-bedroom apartments
Former Finchingfield United Reformed Church The Green Finchingfield Essex CM7 4JX
Proposed conversion from offices (Class E) to residential use (C3) to form 3 No. 2-bedroom apartments.
Neighbourhood Centre Towerlands Panfield Road Braintree Essex CM7 5BJ
Creation of a mixed-use building at the Neighbourhood Centre, comprising retail and community uses on the ground floor and office use on the two upper floors, plus an associated car park, hard and soft landscaping, and a recycling centre.
Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for the Plot 5 (Zone B) - The erection of 1no. building split between 2no. units, totalling circa 3,517sqm GEA of Use Class E (g)(iii) (Industrial) with ancillary office, associated car parking, service yards and landscaping. Checklist application for discharge of Conditions G1; (Design Code Compliance); G2. (Compliance Checklist); G7. (Construction Management Plan); G10 (Wayfinding); P1. (Plot Landscaping); P2. (Access); P3. (Parking); P5. (Surface Water Drainage); P6. (Foul Drainage); P10. (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO.
Bradwell Quarry Church Road Bradwell Essex CM77 8EP
Details pursuant to condition 22 (Noise monitoring May 2023) of planning permission ESS/12/20/BTE. ESS/12/20/BTE was for "Extraction of 6.5 million tonnes of sand and gravel (from Site A7 as identified in the Essex Minerals Local Plan 2014) including the retention of the existing access onto the A120, the processing plant (including sand and gravel washing plant), office and weighbridge, ready mix concrete plant, bagging unit, DSM plant, water and silt management systems. In addition, extension of the internal haul road into Site A7 and access for private and support vehicles to the Site A7 contractors' compound via Woodhouse Lane and Cuthedge Lane. Restoration of Site A7 to agriculture and biodiversity (species rich grassland and wetland)."
The Old Bank 63 High Street Kelvedon Essex CO5 9AE
Change of use from Class A1, A2 or B1 office use to residential dwelling
Crabbs Barn Cranes Lane Kelvedon Essex CO5 9AX
Conversion of existing outbuilding to form manager's office, conversion of existing garage building to form manager's accommodation and installation of 7No. 'Shepherds Hut' style holiday cabins.
5 Wheaton Road Witham Essex CM8 3UJ
Partial demolition of existing two storey workshop bay incorporating ground and first floor admin and office suites and remodelling to create new office and administrative support areas. Alterations and re-roofing of attached factory and service bays. Removal of single storey later addition to existing workshop and service bay building. Associated landscaping reinstatement and operational development. Application follows earlier part implemented scheme under 21/03147/FUL.
The Cart Lodge Peartree Hall Coggeshall Road Earls Colne Essex CO6 2JS
Erection of a 3-bay cart lodge with home office to first floor.