Land Rear Of Four Elms Bardfield Road Bardfield Saling Essex
Erection of security fencing
1 Birch Close Braintree Essex CM7 2SA
Proposed change of use to residential garden and erection of 2m fence
Land Adjacent To Electricity Sub Station Site Braintree Road Cressing Essex
The laying out of a battery storage facility, intermediate substation, cabling, fencing, access tracks and associated drainage infrastructure on land adjacent to Braintree 400kV substation
62 Railway Street Braintree Essex CM7 3JD
Retention of change of use of building to a pre-school (Class E) and erection of fencing to front of building to form play area
3 Freebournes Road Witham Essex CM8 3UN
Proposed security fence to north and east boundaries.
The White Hart 15 High Street Halstead Essex CO9 2AA
Extension of existing patio area with concrete block paving, including erection of fence with pedestrian gate. Extension of existing timber pergola across the new length of the patio, and installation of raised flowerbeds around boundary of new area.
Colemans Farm Little Braxted Lane Rivenhall End Witham Essex CM8 3EX
Installation of up to 250kw ground mounted solar pv scheme including associated works including, inverters, cable route and ancillary equipment and boundary fencing.
Land North Of Prested Hall, South Of The A12 Essex
Change of use to Ecological Mitigation Area 17 (linked to the A12 widening scheme) including the creation of 3 ponds, creation of 8 bunds and the raising of ground level from on-site excavated material, perimeter fencing and associated landscaping.
Land North East Of Hatfield Road Hatfield Peverel Essex
Change of use to ecological mitigation area 8 (linked to the A12 widening scheme) including the creation of 1 pond, creation of 1 bund and one area of wider re-grading of land from on-site excavated material, perimeter fencing and associated landscaping.
Land South Of Howbridge Hall Road Witham Essex
Change of use to ecological mitigation area (linked to the A12 widening scheme) including the creation of 3 ponds, creation of 8 bunds and one area of wider re-grading of land from on-site excavated material, perimeter fencing and associated landscaping.