Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for the Plot 5 (Zone B) - The erection of 1no. building split between 2no. units, totalling circa 3,517sqm GEA of Use Class E (g)(iii) (Industrial) with ancillary office, associated car parking, service yards and landscaping. Checklist application for discharge of Conditions G1; (Design Code Compliance); G2. (Compliance Checklist); G7. (Construction Management Plan); G10 (Wayfinding); P1. (Plot Landscaping); P2. (Access); P3. (Parking); P5. (Surface Water Drainage); P6. (Foul Drainage); P10. (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO.
Plc Hunwick Ltd Kings Road Halstead Essex CO9 1HD
Variation of Condition 1 (Approved Plans) of approved application 21/02718/REM granted 13.04.2022 for: Application for the approval of reserved matters (in respect of appearance and landscaping) pursuant to outline planning permission 19/02304/OUT granted 23.04.21 for the erection of for four x 2 bed houses, five x 4/5 bed houses, 12 flats and 10 commercial units for class B1(a) office purposes. Variation would allow for: Changes to the layout, including resiting of electrical substation and adjustment of associated parking, separation of Plots 13/14 and 15/16 to provide detached houses - landscaping scheme, plans & elevations and street scene have been revised accordingly.
Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for Parcel DC 3.1 Zone B - Erection of Research and Development (E(g)(ii) unit with offices E(g)(i) and associated parking, landscaping, drainage, and service/utility infrastructure. Checklist application for discharge of Conditions; Conditions G1; (Design Code Compliance); G2. (Compliance Checklist); G7. (Construction Management Plan); G10 (Wayfinding); P1. (Plot Landscaping); P2. (Access); P3. (Parking); P5. (Surface Water Drainage); P6. (Foul Drainage); P7. (Noise); P10. (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO (AMENDMENT TO PREVIOUS APPLICATION 21/02944/LDOCC).
Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for the EOS plot (Zone B) - The erection of 4no. buildings with 9no. units between totalling circa 11,850m² GEA of Use Class E (g)(iii) (Industrial) with ancillary offices, associated car parking, service yards and landscaping. Checklist application for discharge of Conditions G1; (Design Code Compliance); G2. (Compliance Checklist); G7. (Construction Management Plan); G10 (Wayfinding); P1. (Plot Landscaping); P2. (Access); P3. (Parking); P5. (Surface Water Drainage); P6. (Foul Drainage); P10. (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO.
Land North East Of The Vineyards Hatfield Peverel Essex
Town & Country Planning Act 1990 (as amended), Town & Country Planning (Environmental Impact Assessment) Regulations 2017 - Screening Request (Regulation 6)-Creation and use of a temporary construction compound including; access onto the A12, car parking, a storage yard, welfare and office facilities and associated earthworks bund to be located on land to the north of junction 20b at Hatfield Peverel.
Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for Parcels 1,2 & 3 Zone C - The erection of 3no. buildings totalling circa 14,927m² GEA of Use Class B8 (Storage or Distribution) with ancillary offices, associated car parking, service yards and landscaping. Checklist application for discharge of Conditions G1; (Design Code Compliance); G2. (Compliance Checklist); G7. (Construction Management Plan); G10 (Wayfinding); P1. (Plot Landscaping); P2. (Access); P3. (Parking); P5. (Surface Water Drainage); P6. (Foul Drainage); P7. (Noise); P10. (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO.
Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for the Plot 5 (Zone B) - The erection of 1no. building split between 2no. units, totalling circa 3,196m² GEA of Use Class E (g)(iii) (Industrial) with ancillary office, associated car parking, service yards and landscaping. Checklist application for discharge of Conditions G1; (Design Code Compliance); G2. (Compliance Checklist); G7. (Construction Management Plan); G10 (Wayfinding); P1. (Plot Landscaping); P2. (Access); P3. (Parking); P5. (Surface Water Drainage); P6. (Foul Drainage); P10. (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO.
Plc Hunwick Ltd Kings Road Halstead Essex CO9 1HD
Variation of Condition 2 (Approved Plans) of permission 19/02304/OUT granted 23.04.2021 for: Outline application for four x 2 bed houses, five x 4/5 bed houses, 12 flats and 10 commercial units for B1(a) office purposes (with all matters reserved other than means of access, layout and scale). Variation would allow for: - Re-siting of substation and adjustment of parking area to flats, to avoid large water main and UK Power Networks require two pods.
Horizon 120 Business Park Off A131 London Road Great Notley Essex
Horizon 120 Business and Innovation Park Local Development Order 2021 (LDO) Compliance Checklist application for the Plot 5 (Zone B). The erection of 1no. building totalling circa 3,145m2 GEA of Use Class E (g)(iii) (Industrial) with ancillary office, associated car parking, service yards and landscaping. Checklist application for discharge of Conditions G1 (Design Code Compliance), G2 (Compliance Checklist), G7 (Construction Management Plan), G10 (Wayfinding), P1 (Plot Landscaping), P2 (Access), P3 (Parking), P5 (Surface Water Drainage), P6 (Foul Drainage), P10 (Building Maintenance) and P11 (Renewable Energy) for Local Development Order number 21/01783/LDO.
Bradwell Quarry Church Road Bradwell Essex CM77 8EP
Consultation on Essex County Council application no. ESS/03/18/BTE/60/02 - Details pursuant to condition 60 (5 Year aftercare scheme for woodland and agriculture) of ESS/03/18/BTE. ESS/03/18/BTE was for "Extraction of 2 million tonnes of sand and gravel (from Site A5 as identified in the Essex Minerals Local Plan 2014) including the retention of the existing access onto the A120, the processing plant (including sand and gravel washing plant), office and weighbridge, ready mix concrete plant, bagging unit, DSM plant, water and silt management systems and extension of the internal haul road into Site A5 with restoration to agriculture and biodiversity (species rich grassland and wetland)".