Small Acres Maldon Road Hatfield Peverel Essex CM3 2HU
Outline planning application with all matters reserved apart from access, for: Demolition of existing dwelling and associated outbuildings, and construction of up to 17 dwellings with open space, access, landscaping and associated infrastructure.
Land At Burghey Brook Farm London Road Rivenhall End Rivenhall Essex
Outline Planning Permission with all matters reserved for the demolition of the existing dwelling and buildings on the site and the erection of B2/B8 Industrial and Distribution units with associated parking, servicing and landscaping.
Land North Of Maldon Road Hatfield Peverel Essex
Outline planning application with all matters reserved except access for the demolition of the existing buildings and for the redevelopment of the site for up to 110 dwellings, including 40% affordable housing, with public open space, structural planting and landscaping, surface water flood mitigation and attenuation, and vehicular access point from Maldon Road.
Rectory Meadow Bradwell Essex CM77 8EX
Outline application with all matters reserved, except access and scale, for demolition of existing commercial buildings and erection of 3 two-storey dwellinghouses.
Towerlands Panfield Road Braintree Essex CM7 5BJ
Outline planning application for up to 575 homes together with a 0.13ha site for early years and childcare nursery (D1), Up to 250sqm of local retail (A1) and up to 250sqm of community facilities (D1), green infrastructure including formal/informal open space and amenity space, provision of ecological mitigation area to north-west of developable area, landscaping including woodland and hedgerow planting, new vehicular accesses from the B1053 and Panfield Lane, closure of existing access from Deanery Hill (south), footway and cycleway network, supporting infrastructure (utilities including gas, electricity, water, sewerage, telecommunications (and diversions as necessary), diversion of public right of way, sustainable drainage systems, any necessary demolition and ground remodelling.