Clay Hall Days Lane Pilgrims Hatch Brentwood Essex CM15 9SJ
Removal of Condition 4 (Permitted Development Rights for extensions to the dwellinghouse) of application 01/00561/FUL (Change of Use to a dwelling for occupation by equestrian worker).
Holbrook Stables Thoby Lane Mountnessing Essex
Application for a Lawful development Certificate for a proposed use or development for the development to continue when sold (Previous planning permission 13/01044/FUL Change of use of existing barn to a single dwelling. Proposed conversion of barn/stables into a dwelling including a single storey front extension, corridor extension, verandah and alterations, including underpinning).
Central Office Eagle Way Great Warley Essex
Discharge of conditions 3 (Detailed drawings and colour of wind screens and louvres) of application 20/01479/FUL (Extension of and amended cladding/fenestration to the 10 no. rooftop dwellings consented via permitted development at the southern element of the existing former Ford Headquarters building).
Clay Hall Days Lane Pilgrims Hatch Brentwood Essex CM15 9SJ
Removal of Condition 4 (Permitted Development Rights for extensions to the dwellinghouse) of application 01/00561/FUL (Change of Use to a dwelling for occupation by equestrian worker).
Quince Hall Farm Chelmsford Road Blackmore Ingatestone Essex CM4 0PZ
Removal of condition 18 of application 20/00398/FUL (Renovation and extension to existing farmhouse. Conversion and alterations of three outbuildings to form dwellings. Demolition of existing fourth outbuilding and construction of dwelling. Associated hard and soft landscaping scheme) condition 18 is not relevant to this development, as none of the proposed dwellings are flats.
Land East Of Curtis Mill Lane Curtis Mill Lane Navestock Essex
Application for a Lawful Development Certificate for an existing use or operation or activity including those in breach of a planning condition for the extensions to the existing building and conversion to form a single dwellinghouse.
Fairfield House Fairfield Road Brentwood Essex CM14 4SD
Prior Approval seeking a two storey residential upward extension of the existing building to deliver 8no. self contained dwellings under Schedule 2, Part 20, Class AA of the Town and Country (General Permitted Development) (England) (Amendment) (No2) Order 2020
Harblaisy House Church Road Mountnessing Brentwood Essex CM13 1UH
Application for a Lawful Development Certificate for a proposed use or development for a two storey rear extension, addition of velux rooflights, alterations to the fenestration replacing existing windows and providing first floor flank obscure glazed windows, the construction of an outbuilding to be used for purposes incidental to the main dwellinghouse, an outdoor swimming pool and exterior patio.
Deep Cover Clapgate Chivers Road Stondon Massey Brentwood Essex CM15 0LH
Application for a Lawful Development Certificate for a proposed use or development to demolish existing part of previous extensions and extend hipped roof to gable and add rear dormer, add single storey side extensions to both sides of dwelling and add front porch
80 High Street Ingatestone Essex CM4 9DW
Discharge of conditions 3 (Samples of materials), 4 (Details of proposed new windows, doors, eaves etc), 5 (Hard and soft landscaping scheme), 7 (Written scheme of Investigation) and 8 (Construction Method Statement) of application 19/01693/FUL (Variation of Conditions 2 (Built in accordance), Condition 3 (Samples) Condition 4 (Window/Door details) Condition 5 (Hard and Soft Landscaping), Condition 7 (Cycle/refuse provision), Condition 10 (Archaeological Programme) and Condition 11 (Construction Method Statement) for application 19/01198/FUL (The conversion of a two bedroom flat into 2 one bedroom flats, restoration works of existing building to include re-roofing and fenestration repair. Demolition of existing single storey extension and construction of new single storey extension, and construction of an additional one bedroom single storey dwelling to the rear of the site) to allow phased development - Phase 1: Staff welfare (replacement of single storey rear projection). Phase 2: Conversion of single first floor apartment into two separate apartments including conversion of the outbuildings. Phase 3: The forge (new dwelling to rear), stabilising rear wall and final landscaping).