116-118 Warley Hill Warley Brentwood Essex CM14 5HB
Discharge of Conditions 3 (Details of Materials), 4 (Details of Cycle Storage), 6 (Details of Refuse Storage), 8 (Electric Car Charging Points), 9 (Details of Efficiency Measures) and 10 (Construction Management Plan) of application 23/00147/FUL (Change of use of ground floor from office to residential to create two additional flats to include construction of single storey rear extension, construction of 2 bay windows to front with pitched roof over and a front boundary wall with railings).
Housing Redevelopment Brookfield Close Hutton Essex
Discharge of conditions 9 (Bat Survey) of application 20/01912/FUL (Redevelopment of site including demolition of houses and bungalows and development of 62 zero carbon homes incorporating extensions and conversion of Courage Court to form 22 flats, construction of 16 houses and 24 flats; provision of open space, landscaping and associated works).
Housing Redevelopment Brookfield Close Hutton Essex
Discharge of conditions 29 (Arboricultural Method Statement to include tree protection plan) of application 20/01912/FUL (Redevelopment of site including demolition of houses and bungalows and development of 62 zero carbon homes incorporating extensions and conversion of Courage Court to form 22 flats, construction of 16 houses and 24 flats; provision of open space, landscaping and associated works.)
The Badgers Cromwell Road Warley Essex
Discharge of condition 8 (Water consumption, water quality, and wastewater infrastructure capacity) of application 23/00134/FUL (Construction of 2 additional storeys above second floor to create 8 x 2no. bed flats, extension to existing apartment to include the full height of the new building. Demolition of existing cycle and refuse stores; construction of new refuse and cycle storage building; alterations to existing car parking layout to provide additional vehicle parking with associated works)
116-118 Warley Hill Warley Brentwood Essex CM14 5HB
Discharge of conditions 3 (Details of materials), 4 (Details of cycle store), 6 (Facilities for refuse storage), 8 (Extraction termination), 12 (Details of one vehicle charging point), and 13 (Wastewater capacity details) of application 22/00451/FUL (Change of use of ground floor from retail to office and storage space with replacement shop front. Demolition of single storey rear extension and partial demolition of two storey rear extension. Proposed hip to gable loft extension to include two dormers to the front, 2x part single/part two storey rear extensions with rooms in the roof and linked dormer between and alterations to existing fenestration, with associated parking, bin and cycle storage to create two additional flats).
1 Chelmsford Road Shenfield Essex CM15 8RG
Discharge of condition 8 (Acoustics/Noise) of application 19/01392/FUL (Add first floor rear extension and conversion of first floor into 2 flats (1No. x1 bed and 1No. x2 bed) with rear balcony and bike storage, conversion of existing A1 shop into 2 units for A1/A2 use)
Flat 1-5 And Courtyard House 32 High Street Ingatestone Essex CM4 9EE
Discharge of condition 6 (Residential Travel Pack) of application 18/01234/FUL (Add first floor rear extension with gable roof and convert office building into four No. two-bedroom flats and one No. one-bedroom flat together with construction of detached 1 bed dwelling to the rear together with car parking, cycle and refuse store and hard and soft landscaping.)
The Kilns Hotel Warley Street Great Warley Essex
Discharge of conditions 7 (Historic fabric to be adequately recorded) of application 18/01018/LBC (Proposed conversion of existing Listed Building to form 4 no. new apartments, the demolition of its associated annexe building and separate outbuilding incorporate the following : Flat 1 - Form new opening to ground floor to small extension (current kitchen), re-locate rear window/door, form new stud walls to create rooms within proposed, install bathroom and kitchen with associated plumbing Flat 2 - remove and form new stud walls to create rooms, install bathroom and kitchen with associated plumbing, insert new window to side elevation and removal of 2 windows and replace with 1 on elevation all to bed 1, removal of stud partition (inserted as fire protection) in current hallway and infill Flat 3 - part removal and form new stud walls and new openings to create rooms, install bathroom and kitchen with associated plumbing Flat 4 - Remove stud partition, infill doorway in first floor hallway, install larger window to rear, install stud walls and create bathroom and kitchen with roof void with associated plumbing).
7 & 9 York Road Shenfield Brentwood Essex CM15 8JT
Discharge of conditions 4 (Landscaping scheme) and 5 (Construction Management Plan) of application 21/01150/FUL (Demolition of attached garage and store and removal of chimney stack. Two storey side extension to create two new one bedroom flats. New windows and entrance canopy to existing building. Construction of new driveway with new extended drop kerbed crossover).
80 High Street Ingatestone Essex CM4 9DW
Discharge of conditions 3 (Samples of materials), 4 (Details of proposed new windows, doors, eaves etc), 5 (Hard and soft landscaping scheme), 7 (Written scheme of Investigation) and 8 (Construction Method Statement) of application 19/01693/FUL (Variation of Conditions 2 (Built in accordance), Condition 3 (Samples) Condition 4 (Window/Door details) Condition 5 (Hard and Soft Landscaping), Condition 7 (Cycle/refuse provision), Condition 10 (Archaeological Programme) and Condition 11 (Construction Method Statement) for application 19/01198/FUL (The conversion of a two bedroom flat into 2 one bedroom flats, restoration works of existing building to include re-roofing and fenestration repair. Demolition of existing single storey extension and construction of new single storey extension, and construction of an additional one bedroom single storey dwelling to the rear of the site) to allow phased development - Phase 1: Staff welfare (replacement of single storey rear projection). Phase 2: Conversion of single first floor apartment into two separate apartments including conversion of the outbuildings. Phase 3: The forge (new dwelling to rear), stabilising rear wall and final landscaping).