Quince Hall Farm Chelmsford Road Blackmore Ingatestone Essex CM4 0PZ
Removal of condition 18 of application 20/00398/FUL (Renovation and extension to existing farmhouse. Conversion and alterations of three outbuildings to form dwellings. Demolition of existing fourth outbuilding and construction of dwelling. Associated hard and soft landscaping scheme) condition 18 is not relevant to this development, as none of the proposed dwellings are flats.
Harblaisy House Church Road Mountnessing Brentwood Essex CM13 1UH
Application for a Lawful Development Certificate for a proposed use or development for a two storey rear extension, addition of velux rooflights, alterations to the fenestration replacing existing windows and providing first floor flank obscure glazed windows, the construction of an outbuilding to be used for purposes incidental to the main dwellinghouse, an outdoor swimming pool and exterior patio.
80 High Street Ingatestone Essex CM4 9DW
Discharge of conditions 3 (Samples of materials), 4 (Details of proposed new windows, doors, eaves etc), 5 (Hard and soft landscaping scheme), 7 (Written scheme of Investigation) and 8 (Construction Method Statement) of application 19/01693/FUL (Variation of Conditions 2 (Built in accordance), Condition 3 (Samples) Condition 4 (Window/Door details) Condition 5 (Hard and Soft Landscaping), Condition 7 (Cycle/refuse provision), Condition 10 (Archaeological Programme) and Condition 11 (Construction Method Statement) for application 19/01198/FUL (The conversion of a two bedroom flat into 2 one bedroom flats, restoration works of existing building to include re-roofing and fenestration repair. Demolition of existing single storey extension and construction of new single storey extension, and construction of an additional one bedroom single storey dwelling to the rear of the site) to allow phased development - Phase 1: Staff welfare (replacement of single storey rear projection). Phase 2: Conversion of single first floor apartment into two separate apartments including conversion of the outbuildings. Phase 3: The forge (new dwelling to rear), stabilising rear wall and final landscaping).