78 West Street And 7-8 Middle Street Brighton BN1 2RA
Non-Material Amendment to BH2020/03342 (original permission BH2015/04577) to amend the description of the development to 'Variation of Condition 1 of application BH2015/04577 (as amended by BH2018/00682 and BH2018/01013) [Demolition of existing nightclub buildings. Construction of mixed use building of up to 7 storeys to provide hotel, retail, financial & professional services, restaurant/cafe and drinking establishment uses] to allow substitute drawings for hotel use on all floors, flexible retail/financial and professional services/restaurant and cafe/bar uses at ground floor, alterations to all elevations, reduction in the height of the building, and extensions/alterations at 5th/6th floor level'.
21 Clifton Hill Brighton BN1 3HQ
Replacement of existing roof with extension to create second floor level, including parapet and new roof construction and associated alterations.
10 Garden Close Portslade BN41 1XL
Erection of replacement single storey side extension. Alterations to fenestration and construction of new access steps.
3 Woodland Close Hove BN3 6BP
Alterations and extensions to roof line to front of property, construction of new dormer to east elevation, insertion of rooflights, cladding of front and rear of building in timber and revised fenestration. Double hip-to-gable roof extensions on garage, new dormer to door head, insertion of rooflights and cladding of building in timber.
78 West Street And 7-8 Middle Street Brighton BN1 2RA
Variation of Condition 1 of application BH2015/04577 (as amended by BH2018/00682 and BH2018/01013) [Demolition of existing nightclub buildings. Construction of mixed use building of up to 7 storeys plus basement to provide hotel, retail, financial & professional services, restaurant/cafe and drinking establishment uses.] to allow substitute drawings for hotel use on all floors, flexible retail/financial and professional services/restaurant and cafe/bar uses at ground floor, ancillary plant and storage in basement, alterations to all elevations, reduction in the height of the building, and extensions/alterations at 5th/6th floor level.